ADQ Implementation Avitech’s Approach and Experience ADQ Implementation Workshop Eurocontrol 28/29th May 2013 Michal Kadlec 28/03/2017
Content Concept & Solution Compliance Experience Michal Kadlec 28/03/2017
Components of Avitech's ADQ Solution Workflows Interfaces SLA AIXM 5.1 SDO Validation Metadata S2S/AXL eAIP Services Michal Kadlec 28/03/2017
History of Avitech ADQ related product implementation 1999 – First version of the Wiz@rd Suite fully controlled by workflow management tool 2003 – First interface for data originators 2010 – Implementation of upstream workflows for obstacle survey management and procedure design 2011 – Adaptation to ADQ (73/2010) 2012 – eAIP based interfaces for text and aeronautical data origination Michal Kadlec 28/03/2017
Overview of Wiz@rd Suite Solution Michal Kadlec 28/03/2017
Origination Interfaces eADP.wiz@rd offers configurable origination interfaces based on SLA: Free text Attachments – structured (importable)/unstructured eAIP-based text origination eAIP-based aeronautical data origination Customizable SDO forms AXL – system-to-system interface Michal Kadlec 28/03/2017
Origination Interfaces – eAIP-based Text Changes Michal Kadlec 28/03/2017
Origination Interfaces – eAIP-based Data Changes Michal Kadlec 28/03/2017
Origination Interfaces – SDO Forms Michal Kadlec 28/03/2017
Workflows Michal Kadlec 28/03/2017
Workflow Engine Features Fully configurable workflows Role based responsibilities Notifications Traceability and Legal recording Reporting 3rd party app integration Michal Kadlec 28/03/2017
Workflow Implementation Cycle Definition Configuration Deployment Evaluation Refinement Trial/Operational Use Michal Kadlec 28/03/2017
Workflow Samples Michal Kadlec 28/03/2017
Source validation rules (SLA Configuration) Data Validation Rules ADQ Related Tools SDO Source validation rules (SLA Configuration) Data Validation Rules Metadata AIXM 5.1 Import/export eAIP Compliant to EUROCONTROL Specification for the Electronic Aeronautical Information Publication Michal Kadlec 28/03/2017
Conformance assessment (EC 73/2010) Operational Concept Definition Services Conformance assessment (EC 73/2010) Operational Concept Definition Project Management Data Migrations Training & Workshops Michal Kadlec 28/03/2017
Content Concept & Solution Compliance Experience Michal Kadlec 28/03/2017
ADQ to Avitech Solution Mapping Article 4 – Data set AIXM 5.1 Article 5 – Data exchange AIXM 5.1, eAIP, AXL Article 6 – Data quality ADP workflow, SDO validation rules, Metadata, SLA Article 7 – Consistency, timeliness and personnel performance ADP workflow, task allocation, notifications, reminders, workflow plan Article 1 - Subject matter Article 2 - Scope Article 3 - Definitions Michal Kadlec 28/03/2017
ADQ to Avitech Solution Mapping (cont.) Article 8 – Tools and software requirements SWAL 4, plan be SWAL 3, V-model development Article 9 – Data protection CRC generation and check Article 10 to 13 – Management and Conformity requirements ISO 9001 Michal Kadlec 28/03/2017
Content Concept & Solution Compliance Experience Michal Kadlec 28/03/2017
Typical ADQ Project Phases Status Assessment Definition Implementation Internal Validation External Validation Verification Operation & Maintenance Michal Kadlec 28/03/2017
ADQ Related Projects 6 5 3 1 2011 2012 2013 2014 Q3 Q4 Q1 Q2 EU 1 EU 2 (MIL) World 6 Implementation Validation Operation 5 Implement Validation Operation Implementation Validation Operation 3 1 Implement Validation Operation Michal Kadlec 28/03/2017
=> Multiple iterations => Longer implementation Lessons learned Workflow Definition related issues: No documented workflows exist Workflows documented but not followed Insufficient workflow description (only happy-end scenarios, missing steps) External parties involved in the workflow Lack of business modelling know-how => Multiple iterations => Longer implementation Michal Kadlec 28/03/2017
Lessons learned (cont.) Other ADQ implementation related issues: Lack of common understanding of ADQ requirements Unstable requirements Country specific requirements & culture Changes in AIM software development processes to fulfil SWAL requirements - longer release times, Re-verification of the solution => strict release planning & longer time to implement and delivery => increased development costs = difficult to develop COTS solution - , also the user need re-certification to use new version of software, raising cost on development Michal Kadlec 28/03/2017
Questions? Company Locations Thank you for your attention! Frankfurt am Main Questions? Avitech GmbH Bahnhofplatz 1 / POBox 1430 D-88044 Friedrichshafen Germany Phone: +49-7541-282-0 Fax: +49-7541-282-199 E-mail: michal.kadlec@avitech-ag.com www.avitech.aero - www.eaip.info Friedrichshafen/Konstanz Bratislava Michal Kadlec 28/03/2017