Federal Aviation Administration Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Kapitel S3 Astronomie Autor: Bennett et al. Raumzeit und Gravitation Kapitel S3 Raumzeit und Gravitation © Pearson Studium 2010 Folie: 1.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012
Presentation transcript:

Federal Aviation Administration Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station Software Upgrade SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

2 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Contents Summary of Release 15 GES Upgrade Data Link Performance Analysis of CPDLC and ADS-C Technical Performance by GES Before = 2 months prior to month in which upgrade occurred After = 2 months after month in which upgrade occurred Most recent = November/December 2011

3 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Summary of Release 15 GES Upgrade Release 15 (R15): Most recent system software upgrade for ground earth stations interfacing with Inmarsat Classic Aero I-3 satellites Purpose of upgrade: –To improve GES data link delivery capability and aircraft log-on management subsystems –To enhance GES traffic handling and monitoring subsystems GES Identifier and LocationAssociated DSPDate of R15 Upgrade XXE – Eik, NorwayARINC31 January 2010 XXC – Santa Paula, California, USAARINC16 February 2010 AOW2 – Aussaguel, FranceSITA31 May 2010 POR1 – Perth, AustraliaSITA6 July 2010

4 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Data Link Performance Comparison for Eik GES (XXE)

5 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

6 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

7 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

8 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

9 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Summary of Observed Performance Following R15 Upgrade Eik GES: –Improvement in the ACTP was not observed immediately following the R15 upgrade, but the most recent data does show a noticeable improvement in performance for CPDLC transactions –ADS-C downlink latency performance is observed to have degraded in the period immediately following the upgrade as well as in the most recent period

10 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Data Link Performance Comparison for Santa Paula GES (XXC)

11 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

12 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

13 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

14 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

15 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Summary of Observed Performance Following R15 Upgrade Santa Paula GES: –Improvement can be observed for both the ACTP for CPDLC transactions and ADS-C downlink latency performance for ADS-C downlink messages –Improvement shown to be stable between the period immediately following the upgrade and the most recent period of observation for both performance measures

16 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Data Link Performance Comparison for Aussaguel GES (AOW2)

17 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

18 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

19 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

20 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

21 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Summary of Observed Performance Following R15 Upgrade Aussaguel GES: –Improvement can be observed for both the ACTP for CPDLC transactions and ADS-C downlink latency performance for ADS-C downlink messages –Continued improvement shown between the period immediately following the upgrade and the most recent period of observation for both performance measures

22 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Data Link Performance Comparison for Perth GES (POR1)

23 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

24 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

25 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

26 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012

27 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Summary of Observed Performance Following R15 Upgrade Perth GES: –Slight improvement can be observed for both the ACTP for CPDLC transactions and ADS-C downlink latency performance for ADS-C downlink messages –Continued improvement shown between the period immediately following the upgrade and the most recent period of observation for ACTP –Improvement shown to be stable between the period immediately following the upgrade and the most recent period of observation for the ADS-C downlink latency performance

28 Federal Aviation Administration SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012 Conclusions Overall improvement in data link performance at GES level following R15 upgrade Improvement most noticeable at the Santa Paula and Aussaguel GES In general - upgrade appears to have had more of an impact on the ACTP than on the ADS-C downlink latency performance