Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfer & Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Interactions with the implementation of RIIO-T1
An alternative approach…..
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Capacity Methodology Statements
PARCA Security and Termination Amounts
Transmission Workgroup June 7th 2012
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Transmission Workgroup 6th March 2014
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
Long Term Non Firm Capacity Update
Transmission Workstream – 6th July 2005
Optimisation of Entry Capacity Modification Proposal
Entry Capacity Transfers - Constrained Period
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Substitution 27th June 2012

2 Substitution Principles  Any solution needs to take into account substitution prior to submitting a Development Consent Order  Prior to any such reservation parties at the Donor point should have the opportunity to retain the capacity.  If capacity is reserved the party will have to pay a fee for this  If a formal capacity signal is not received within a defined time the reservation is cancelled and the party is charged.

3 Capacity/Connection Processes Options and Issues for substitution OptionAdvantagesChallengesComments 1. Do nothing- Retainer on entry and substitute post capacity signal. Simple. No systems impact. No change to UNC or methodologies Requires application at Y-7; or NG take risk that substitutable capacity remains available; or Proceed with build knowing substitution likely. Does not address issues. Does not take into account substitution prior to the development consent order Inefficient and presents unacceptable risks to all parties. 2a: Reserve for entry/exit as part of PCA. Retainer on entry only Simple No change to UNC or methodologies Entry and exit treated different. Fixed price with no market testing Retainers placed in absence of knowledge of likelihood of capacity being substituted. Refunds as now. 2b: As 2a but also a retainer for exit Simple to implement. Only minor change. Entry and exit capacity treated alike. Fixed price with no market testing Retainers placed in absence of knowledge of likelihood of capacity being substituted. Needs UNC mod for Exit Retainer Charges. Exit Capacity Substitution MS needs amendment. Refunds as for entry. Equal price for exit and entry retainers. When a retainer is taken out it covers all applications for 12 months, and needs to be repeated annually (except option 5)

4 Capacity/Connection Processes Options and Issues for substitution OptionAdvantagesChallengesComments 3: Competitive retainer and reservation. Value based decision to retain or reserve. Pay as bid. Ill-informed application. Reservation Parties must become Users. More complexity. Bids tend to PCA costs New “reservation” charge needed. Can be blind or open auction. 4: Informed retainer post closest auction/application No need for retainers if no substitution identified. Can link retainer to specific project. Fixed price Insufficient time to apply to annual process. Not practical due to time constraints. Scope to simplify refunds. 5: Informed competitive post closest auction/application. Value based decision. Pay as bid. No need for retainers if no substitution identified. Can link retainer to specific project. Insufficient time to apply to annual process. Reservation Parties must become Users. More complexity. Not practical due to time constraints. Refunds could be used to encourage early surrender of retainer or reservation if circumstances change. For option 5: because the retainer was taken out in response to a specific recipient project, the retainer would last until the “recipient” project reaches build decision date. Reservations last until surrendered or substitution confirmed. All options subject to system analysis