Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
, CLIC Test Module Meeting Concept of ‘hexapod type’ DB Quad adjustable support Mateusz Sosin.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
1 Nanopositioning of the main linac quadrupole as means of laboratory pre-alignment David Tshilumba, Kurt Artoos, Stef Janssens D. Tshilumba, CERN, 03.
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Proposal to use electromagnetic correction coils for RT trajectory correction.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Hard or Soft ? C. Collette, K. Artoos, S. Janssens, P. Fernandez-Carmona, A. Kuzmin, M. Guinchard, A. Slaathaug, C. Hauviller The research leading to these.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
PROGRESS ON THE CLIC MBQ STABILIZATION R&D K. Artoos, C. Collette **, M. Esposito, P. Fernandez Carmona, M. Guinchard, S. Janssens*, R. Leuxe, R. Morón.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
Gravity load on SAS – comparison between real and mock-up April 13 th, 2016.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Résumé de CLIC’08. J.P.Delahaye CLIC Status & work program (14 – 10 – 08) 2 2EPAC 2008 CLIC / CTF3 G.Geschonke, CERN Helsinki Institute of Physics (Finland)
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Nano stabilisation studies for CLIC
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
CLIC magnets precise positioning
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Have a chance to operate your own beam at CERN
List of changes and improvements for the next generation CLIC module
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
TBL quadrupole mover prototype development
Towards a common mechanical interface
Progress and plans, Mechanics system of CEPC
Presentation transcript:

Friedrich Lackner (TS-SU) CLIC08 Workshop

CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen Mockups FEA on the Quad Mockup Mockup-Tests and Lab Studies Stepper Systems – Stabilization Systems CLIC Alignment Website Discussion 2 Outline: Friedrich Lackner, October 16 th, 2008

3 Baseline: Four different types of Main Beam Quadrupoles: Length: -420 mm -920 mm mm mm Weight: ~200 to 500kg Current layout: MB Quad is supported to the ground Final alignment/Stabilization (Beam Based) Interval: hours & < ~ 1 nm Active pre-alignment (Beam Based) Interval: hours ~ 1  m Active pre-alignment (Movers) Dof.: 5; Interval: weeks ~ 10  m Mechanical pre-alignment (Movers) Dof.: 6; Interval: year ~ 0.1 mm Alignment & Stabilization Concept: Friedrich Lackner, October 16 th, 2008

L 4 Support height (L) should be minimized due to the high stiffness and damping ratio required. Current Alignment Sensors: Wire Position Monitor (Capacitive, Optical) Water Leveling System Rasclic or other Laser System? MB-Quad Alignment/Stabilization Concept Friedrich Lackner, October 16 th, 2008

Expected Properties of a CLIC Mainbeam Quadrupole Support Installation Weight (optimized)Compact DesignEasy to TransportEasy to AlignEasy to re-AdjustInstallation Time (low)Cost-Efficient Operation Damping Ratio (high)Stiffness Characteristics (excellent)Availability (high during entire life cycle)Temperature (low sensitivity)Humidity (low sensitivity)Radiation (high resistance)Magnetic field (high resistance) 5 Friedrich Lackner, October 16 th, 2008 Requires mockup studies to find best solution

6 Magnet Mockup Design: Thomas Zickler (CERN) Quadrupole Mockup (Length = 1920mm) Most complicate version will be studied based on a mockup: Preliminary Mockup based on a T-shaped Profile will be studied based on a layered assembly and as a solid. Layered Profiles will be based on Electromagnetic steel (e.g. Stabolit 70 – Thyssen Krupp) Friedrich Lackner, October 16 th, 2008

Quadrupole mockup simulation results: Modal analysis and self weight deformation studied using different support positions Quadrupole support in Gaussian points results in a deformation on self load of: 1.1um 7 Simulation with ANSYS WB and ANSYS Classic Solid45 elements & Structural Steel (Mockup simulation without coil) Structural Steel; Mass: kg Friedrich Lackner, October 16 th, 2008 Supporting points

8 Previous tests (S. Redaelli, CERN): Main focus in the 90 th was given in the vertical stabilization of the quadrupole magnet5 Stepper motors were used to align the support to 5 DOFSupports were joints and bearings with low friction Friedrich Lackner, October 16 th, 2008 Mockup-Tests and Lab Studies Change of requirements in pre-alignment and especially higher loads requires complete redevelopment. Furthermore documentation regarding reachable Repeatability, Accuracy and Resolution in the 5 DOF of the former System undiscoverable. Behavior of Stepper System can be studied by using the old setup as occasionally mockup

CTF2 Stepper System reactivated: Foreseen steps: - Implementation of feedback loop - Redesign of critical parts (guiding) Frictionless Operation Possible? New software version still communicates with the old setup… First operations… 9 Friedrich Lackner, October 16 th, 2008

Modal measurement for CTF2 stepper motor planned within the next weeks. Will provide important information for the stiffness of the entire support system. Many sources for improvements CTF2 Alignment Concept studied using the FEM 10 Friedrich Lackner, October 16 th, 2008 What to learn from an old Setup? Important information of friction and clearance behavior Repeatability of important alignment parameters Important input for ANSYS and for all further studies Will help to select adequate movers for CLIC Also answers the question -> Frictionless pre- alignment required?

11 Regarding Movers: Market research on suppliers for stepper motor development and “frictionless” joints Main issue: Insufficient load capacity -> most μ movers and hexapods on the market can adjust loads up to max. 40kg - PI- Karlsruhe (D)- ZTS -VVU – Kosice (Sk): Stepper system supplier for LHC low beta magnets- Midi ingenierie – Labege (F): Stepper system supplier for CTF2 E.g.: PI MIKE M-238 unidirectional repeatability: 0.3 μm, max. load: 40kg Further development of the M-238 for a load of 100kg -> CHF/Piece and complete new design for loads up to 200kg

12 Progress on research for the nano stabilization of the MB-quad: Further possibilities using piezo stacks are studied Guiding Flexures: Available solutions are not able to provide required load capacity Foreseen: Production of a guiding flexure at CERN using wire -electro discharge machining is foreseen. Friedrich Lackner, October 16 th, 2008 Nano membran -> studied by Kurt Artoos et al. (TS-MME) Critical: Implementation and fixation of the piezo actuator

Frictionless support ‘guiding flexure’ Piezo Force Sketch: Layout using four guiding flexures Friedrich Lackner, October 16 th,

Vertical space to integrate a stabilization system is limited by 100 mm (between MQ and the girder) How to implement ? 600 mm 482 mm 100 mm Girder: 150*320mm 94 mm Remark: nm stabilization requires a minimum vertical distance. Space limitations on current Module design: Friedrich Lackner, October 16 th,

15 Friedrich Lackner, October 16 th, 2008 Frictionless operation of the pre-alignment system by applying linear elastic deformation? How to provide optimal stiffness characteristics for the stabilization system on beam level? Decoupling between pre-alignment and stabilization system. Many solutions, proposals and open work -> still there are so many more open questions to be studied, e.g.:

16 Friedrich Lackner, October 16 th, 2008 Z X Y Idea: Increasing the stiffness for a stabilization system by clamping the pre- alignment system to concrete support (applying clamping force in non critical Z direction). Proposal for Mockup studies: Stabilization System Concrete Pre-alignment system

17 Friedrich Lackner, October 16 th, 2008

CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen Mockups FEA on Quad Mockup Mockup-Tests and Lab Studies Stepper Systems – Stabilization Systems CLIC Alignment Website Discussion 18 Outline: Friedrich Lackner, October 16 th, 2008