SR Vacuum Systems and Front Ends

Slides:



Advertisements
Similar presentations
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Beamline 12 Project BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall BL12 In-vacuum Undulator Source August 11, 2004 Andy Ringwall.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Review of Vacuum Technology Issues for Low-Emittance Rings R.Kersevan, CERN-TE-VSC-IVM Low-  Workshop, Oxford, 8-10 July 2013, J. Adams Inst. Accel. Studies.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
BROOKHAVEN SCIENCE ASSOCIATES SR Chambers & RF Bellows ASAC Review, 3/26-27/ of 21 SR Chambers & RF Bellows H. Hseuh, Vacuum Group ASAC Review of.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman and Dario Arena, NSLS Summary The present built-out NSLS-II design includes: 30 bending magnet ports, each.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Sept.2001 Shanghai symposium D.T. Jiang Acknowledgements Deming Shu, APS Tom Rebedeue, SSRL.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Cornell ERL Vacuum System as a Model for ILC Damping Vacuum System Conceptual Design Yulin Li & Joe Conway C ornell L aboratory for A ccelerator-based.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Design of Vacuum Chambers of SSRF Storage Ring Yonglin. Chen, Dikui. Jiang SSRF Vacuum Group Shanghai Institute of Applied Physics(SINAP) China Academy.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Experimental Facilities Advisory Committee May 10, 2007 Satoshi Ozaki Director,
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
1 BROOKHAVEN SCIENCE ASSOCIATES Impact of Errors and Damping Wigglers on the Lattice W. Guo 02/26/2009 NSLS-II ASAC Meeting Acknowledgement: M. Borland.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Vacuum System Requirements for a Higgs Factory e + e - Accelerator R. Kersevan CERN, Technology Department Vacuum, Surfaces and Coatings Group R. Kersevan,
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
τ- Charm Vacuum System Preliminary
High Gradient Magnet Design for SPring-8 Upgrade Plan
RTML Vacuum System RDR Summary FermiLab October 24, 2007
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
CEPC Vacuum System Dong Haiyi 2017/11/5.
Status of CTC activities for the Damping rings
Presentation transcript:

SR Vacuum Systems and Front Ends Design Goals & Vacuum Cell Layout Cell Chambers Cross section updates 3-pole wigglers, IR chambers Ray tracing and with canted damping wigglers Absorbers, space allocation Vacuum pumping and pressure profiles Front Ends Summary and Plan NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Design Goals Adequate Apertures and Low Impedance BSC aperture - 25mm (V) x 76 mm (H) Chamber cross section and straightness/flatness to < 1 mm / 5m Smooth cross section changes (10:1 ratio) Surface finish to ~ μm Clearance between chambers and magnet poles ~ 2mm Low Pressure of < 1 nTorr (> 50% H2), Շ (beam-gas) > 40 hr Low outgassing and desorption after in-situ bake and beam conditioning Intercept photons at discrete absorbers away from the source High effective pumping speed (IP+TSP) at absorber locations 15 IP+TSP per superperiod Distributed NEG strips in ante-chambers for active gases NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Vacuum Cell Layout Absorber locations 30 vacuum cells of ~ 19m each straights: 8.6m x15 + 6.6m x 15 Isolatable with 60 gate valves IP+TSP locations DW Front End 3PW Front End Cell chamber material: extruded Al 6063-T5 Based on extensive experience at NSLS and APS Developing fabrication procedures with help from APS 50 + 5 + 5 bending chambers - 6o, ~ 3m long (3+ types, 3 lengths) 90 multipole chambers of 3 lengths, 4m, 5m & 3.7m ~ 40 day-one straight section chambers of various lengths extruded Al with similar cross sections as multipole chambers NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

Bending Chamber Cross Section Changes since last review Thicker wall at gap and at NEG slots Relocated cooling channels Bending chamber, ~ 3m long BSC: 25 x 76 mm2 Extruded cross sections SM=45 MPa 3mm wall SY = 145 MPa DY=0.35mm x 2 After machining NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Multipole Chamber Cross Sections w/ thicker wall BSC: 25 x 76 mm2 Multipole chamber extruded cross section 3.1mm 3-D FEA at the sextupole SM = 94 MPa @ quadrupole SY = 145 MPa 2.9mm DY = 0.33mm x 2 @ sextupole NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

Detailing chamber cross sections for prototype extrusion Detail dimensions w/ tolerances Details on BPM machining, mounting and supports NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE 3-Pole Wiggler and IR Chambers at BM2 3 Pole Wigglers: 32/35mm gap x 20cm at u/s BM2 ~ 2.5 mm wall at center pole Ray tracing at absorber locations BM1 fan 3PW fan ±1 mrad BM2 BM2 fan Crotch absorber d/s of 3-pole wiggler IR Vacuum chambers: 5 x 90mm in 90mm dipoles + 5 x 35mm in regular dipoles Impact to vacuum: outgassing, HOM heating, pumping, etc. Conceptual design of IR chamber in 90mm dipole gap NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Damping wiggler absorber and crotch absorber at BM1 BM1 Wiggler Absorber DW power 65 kW with ± 2.3 mrad fan, canted ± 1 mrad Absorber: 4.5 kW @ 0.5 mrad x 2; 11 kw @ 1 mrad x 2 Need to clip 1 mrad x 2: to shadow the FE beam pipes Crotch Absorber Canted Damping Wiggler Fans NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Ray Tracing and Absorbers Crotch absorbers: 2 per cell for BM radiation Stick absorbers (or flange absorber): 4 per cell for BM radiation Wiggler absorbers: for damping wigglers No ring absorbers needed for undulator (and 3 pole wiggler) fans FM to clip DW fan at FE DW fan after 1mrad x 2 by wiggler absorber Stick absorber at 23mm to trim u/s BM1 fan and protect d/s flanges Flange absorber or stick absorber at center of straight to trim u/s BM2 fan and protect d/s bellows and gate valve NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE SR Absorbers – Thermal Analyses Stick Absorber Flange Absorber Crotch Absorber Wiggler Absorber The crotch absorber intercepts 814 W at a normal peak power density of 0.25kW/mm2. A maximum temperature of 105 ºC is calculated. The intercepted power by the wiggler absorber is 11 kW (at 1 mrad x 2) out of 65 kW. This results in a maximum temperature of 427 ºC . The actual temperature is 15 to 20% lower because of scattering. A fatigue life of > 10,000 cycles is expected. Chamber heating? NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

Available space for ID at straight sections = Lattice length – 1.5m Girder stability? End box/transition, BPMs, bellows, gate valve, etc. Space for pumps at girder #3 BPM End box GV DW / EPU UBPM w/ isolated stand? Bellows/ fast correctors NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

UHV Pumping and Pressure Profiles Pavg < 1 nTorr In-situ baking of entire cells at 120 C x 40 hrs To reduce thermal outgassing to < 1x10-12 Torr.l/s/cm2 Whole ring thermal gas load of < 1x10-5 Torr.l/s Pressure will be dominated by photon stimulated desorption (PSD) # photons from 60 BM ~ 1x10+21/s ≈ 7x10-5 Torr.l/s (Assuming η (PSD) = 2x10-6 mol/hv for Cu after ∫hv > 1024/m ) # photons from one 7m DW ~ 6x10+20/s with 15% intercepted by the ring absorber ➱ 7x10-6 Torr.l/s (each DW) NEG strips ~ 1,400 m @ > 100 l/s/m for active gases Reside in ante-chambers as in APS Pump thru the photon slots ( C = ~ 200 l/s/m) Ion pumps and TSP of ~ 500 l/s at absorbers 15 IP/TSP per supercell + 4 at four front ends on day one NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Pressure Profiles with and w/o Damping Wiggler Radiation By E. Hu & F. Makahleh To be updated Pavg ~ 0.3 nTorr w/ DW Pavg ~ 0.27 nTorr w/o DW Absorber IP/TSP NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

SR Front Ends – Design Concept Pressure of a few nTorr to protect the SR UHV Bakeable to 200 C (all metal, UHV material, etc) IP/TSP combination at high heat load components Day one FE: One photon shutter (PS) for BM radiation FE with insertion devices: One fixed mask (FAPM); two safety shutters (SS) one photon shutter (PS); two X-ray BPMs Typical APS front end NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Typical layout of hard/soft x-ray beam line front end. Need thermal analysis of all high heat load components for each FE SS x 2 FM: fixed mask; CO: collimator; PS: photon shutter; BDA: beam defining aperture; SS: safety shutter FV GV BPM PS GV BPM CO FM IP/TSP IP/TSP IP/TSP GV: gate valve; FV: fast valve; IP/TSP: ion & titanium sublimation pumps Collimator Photon shutter Safety shutters APS fixed mask design X-BPM NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE

H-C. Hseuh,…, SR Vacuum Systems & FE Summary and Work Plan for 2007 Cell chamber layout with updated lattice – continuing effort Good progress in chamber detail and cross sections with ray tracing Ensure adequate locations and space for absorbers and pumps Extrusion development Detail cell chamber cross sections for prototype extrusion this year Interface with two potential vendors (Taber, Tailien) 4 APS cell chambers and 3 bellows for R&D and evaluation NEG support and assembly R&D, mechanical and fast corrector test 2007+ Plan Continue detail design of chambers, absorbers and FE components collaboration with APS on extrusion details Hire ME, MD and VT, set up vacuum lab MOUs with APS and TLS with access to APS drawings, and TLS Al cleaning development Prototype extrusion of both cross sections with two vendors NSLS-II ASAC Review, 4/23-24/07 H-C. Hseuh,…, SR Vacuum Systems & FE