NAVIGATION DEVELOPMENTS IN EUROPE Alex Hendriks Deputy Director ATM Strategies EUROCONTROL.

Slides:



Advertisements
Similar presentations
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Advertisements

Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Javier Perez Diestro Air Navigation International Director
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN Plan Development Aviation Industry Forum 18 November 2009.
Protection Values for VOR-Defined ATS Routes
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Applications from packages I to III
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Extending GPS and Galileo interoperability: from frequency/signals to integrity Francisco Salabert Head of GNSS Policy Office DDAS/ EUROCONTROL.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
GNSS Aviation Applications
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding Al-Hoceima Demonstration.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
FAA NAVAID Rationalization / Resiliency Overview
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Performance Based Transition
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Summary of the results of discussions in the aviation panel
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV and RNP Strategy in Japan
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Dave Behrens Director, Infrastructure Strategy IATA
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

NAVIGATION DEVELOPMENTS IN EUROPE Alex Hendriks Deputy Director ATM Strategies EUROCONTROL

Airspace Capacity Challenges - Total Departures

Airspace Capacity Challenges - Delays

Infrastructure Evolution Requirements Strategic Objectives (cf. Navigation Strategy): “a total RNAV environment for all operations en-route and in TMA” and “a judicious deployment of space based navigation infrastructure and the rationalisation of ground navigation infrastructure” Target: VOR and NDB withdrawn by 2020+

European Navigation Solutions Navigation Strategy = central tool for Airspace Organization Navigation Strategy is Performance Based Enables closer route spacing=>Capacity benefit Facilitates access into airports in complex environments – e.g. high terrain Responds to environmental requirements =>Low noise routings =>Enabler for Continuous Descent Approaches (CDA) =>Provides repeatable, predictable track keeping Provides navigation performance benchmark => Facilitates PAN-European and Global Harmonization => Reduces costs for operators

European Challenges Multi-national flavour of service provision Privatized / Corporatized / “...ized” ANSPs Competing airport interests Terminal Airspace design methodology differences Protective attitude with respect to national sovereignty – particularly regarding airspace limits (e.g. Terminal Airspace) Pan-European harmonisation for (Terminal) Airspace Competing operational interests Airlines, GA/BA, Military,

Conflicting Demands Traffic increases Especially demands from low cost airlines Airports peripheral to main hubs have significantly increased traffic Complex SID/STAR interaction due to growth of major terminal areas and regional airports Environmental Pressure Often prevents optimum use of terminal airspace Fuel Costs

APV Implementation Benefits HIGH PRIORITY Safety reduce the number of CFiT occurrences Economy potential for lower minima More fuel efficient profiles Environmental Lower noise (reduced thrust changes/aircraft higher than on step down approaches) Lower Fuel burn for CDA No mandatory implementation date Target: all conventional and GPS non precision approaches will be replaced by CDA enabled by APV

European Objectives Maintain Safety Targets whilst : - Meeting capacity requirements - Taking account of environmental constraints - Making the change cost-beneficial to implement (timing and detailed requirements) - Ensuring maximum benefit to users

Aircraft P-RNAV Compliance (2006) 4224= 56% 3305= 44% P-RNAV COMPLIANCE STATEMENT NO COMPLIANCE STATEMENT

44% 56% 18% 82% 5% 95% Approach Procs STARs Airways >FL90 Airways <FL90 SIDs 19% 81% 16% 84% RNAV non RNAV RNAV an Non-RNAV Procedures Mix (Europe )

Where after P-RNAV ? P-RNAV made use of existing capability RNP-RNAV (RTCA Do236/ED ) Business Case under development Additional airspace capacity Potential reduced parallel route spacing En-route and terminal airspace, Integrity sufficient to enable RNAV as “sole means “of navigation New System being delivered claim MASPS compliance

CFIT Vertical Data Vertical Profile of some recent accidents/incidents Loss of vertical situational awareness is a primary contributor

EUROCONTROL Navigation Domain Aims To enable all forms of APV Develop standards and guidance material Undertake safety studies Support States as needed Implementation depends upon Stakeholders Airspace user equipage Operational requirements Navigation Domain will support all Stakeholders

Low visibility procedures in Europe Satisfy a range of user requirements: Maintain Cat II/II capability where exists today Extend Cat II/III as traffic demand/meteo conditions demand Maintain and extend Cat I capability for those airports/operators who do not need Cat II/IIII capability.

Eurocontrol Actions Fulfil the ECAC requirements: Seek to ensure CAT II/III maintained Support States in enabling GLS Investigate the impact of options: Quantify the limitations of ILS Identify how MLS/GLS can overcome limitations Identify cost effective way meeting safety objectives Identify any barriers to sole means and potential mitigations

Navigation Developments – RNAV En-route&TMA P-RNAV as TMA RNAV Means Safety – common requirements Support CDA – environment economy PB RNAV (RNP) Specified Start equipment development - 7 years notice Start planning for airspace changes PB RNAV Mandated Capacity Benefits Improved CDA RNAV Primary means PB RNAV only Means Infrastructure Optimization - needs Galileo and enhanced GPS VNAV/RTA 4D NAV?

Navigation Developments – RNAV Approaches APV Baro VNAV Safety - Reduced CFiT Support CDA - environment economy Lower Minima - capacity economy APV I (EGNOS) Benefit extended to aircraft not able to carry out APV Baro VNAV Further reduction of Minima - economy - capacity RNAV Based Cat I Capacity Benefits Improved CDA RNAV Primary means For Cat I Infrastructure Optimization Needs Galileo and enhanced GPS PB RNAV Approach for every Runway end RNAV can become primary means Improved safety Capacity etc

Navigation Developments – Landing and Guided Take-Off GBAS Cat I Operations MLS Cat II/III Improved capacity in LVP Backup to ILS GSLD Cat II/III Cat I ground system with Inertial on A/C Capacity Benefits to appropriately Equipped Aircraft GBAS Cat II/III Improved capability for all A/C Necessary step to sole service Needs Galileo and enhanced GPS

Infrastructure Optimisation Steps DME ground infrastructure optimisation support RNAV operations synchronised with RNAV evolution 2.1 st VOR and NDB reduction step minimum mix by 2015 synchronised with RNAV evolution maintain safety & continuity en-route and in TMA 3. 2 nd VOR and NDB reduction step (withdrawal) complete by 2020 Subsequent to mandating a new navigation capability; Safety and continuity maintained by other means

VOR reductionNDB reduction RNAV implementation DME enhancement GNSS enhancement RNAV Infrastructure Evolution

MLS Cat IIIGBAS Cat III Precision Approach continued support ILS Sustained Precision Approach Infrastructure Evolution

COM 2.5% NAV 0.7% Other 27.7% ACC 57.6% SUR 11.5% 76% en-route ATM/CNS Costs 24% Terminal ATM/CNS Costs 0.9% Paym to Gov Authorities 5.7% ECTL Costs 5.7% MET Costs 87.8% ATM/CNS Provision Costs VOR+NDB 0.54% VOR+NDB ~0.25% NAVIGATION in ATM/CNS

COMMON STEPS What to do ? Statement of Nav. Infra. Evolution Policy and Criteria for Selection Work program DECISION

IndustryANSP EUROCONTROL Working and Marketing Together Airspace Users How to progress ?

NAVIGATION DEVELOPMENTS IN EUROPE Alex Hendriks Deputy Director ATM Strategies EUROCONTROL

Evolution of Approach Procedures VOR-DME LOC-DME SDFLDABCRS NDBVORILSLOC RNAV 3-DRNAV 2-D SRA NDB on Apt VOR on Apt VOR-ARC NDB-DMENDB-NDB ILS/MLS/GLS (xLS) RNAVRNP-RNAV Overlay with CDFA TODAY SHORT TERM LONG TERM RNAV (RNP) RNAV (RNP) xLS Classic approaches Classic approaches Classic approaches Classic approaches RNAV 4D Flight Path ‘Gate to Gate’ 4D Flight Path ‘Gate to Gate’ xLS RNP-RNAV RNP

Infrastructure Evolution Issues No clear agreement on next RNAV step(s): capability, functionality and its supporting avionics P-RNAV optional; what comes after ? when? GPS-only approaches slow to pick up in Europe Rationalisation impact: Rationalisation impact: Complete withdrawal of NDB and VOR creates a problem for many aircraft (i.e. a costly retrofit ) DME/GNSS-based RNAV leaves GA aircraft without a fallback navigation solution Involves re-design of network (airways, TMA procedures): major effort for ANSP In order to avoid major difficulties in the transition, rationalisation is limited to a small scale (mostly local measures) at present Pressure to release spectrum for other uses/users

Infrastructure Evolution Benefits feasible technically and operationally: Cost effectiveness is achieved by synchronisation with RNAV development and gradual reduction. Withdrawal is associated with substantial changes required by a new RNAV step which supports operational benefits. Proposed rationalisation is in line with Navigation Strategy. Proposed rationalisation is consistent with European States views, IATA, FAA.

Lower Route Charges? VOR costs account for about 0.5% of ATM/CNS costs ! – – would this % correspond to similar % reduction of route charges ? – how significant is this potential reduction to Airspace Users ? – would ALL Airspace users benefit from such a reduction ? Note: Costs is previous slides do NOT include equipage costs ! – could they benefit more significantly from reductions elsewhere in the system ? VOR withdrawal – does not imply immediate removal from board for all aircraft (other regions may still require it) – requires carriage of dual RNAV boxes – how can equipage costs be minimised ? – natural evolution ?

Issues affecting Cost-efficiency Specific Issues Coverage and frequency planning (coordination) Non-optimum location of aids (duplication, non-RNAV) Common Issues Fragmented planning Piecemeal procurement Sub-optimal scale maintenance and in-service development Unsynchronized or inconsistent technological changes Training and administrative costs