Stefan Campbell: TEAM LEADER Carlos Celada:CHIEF ENGINEER Chris Villani:ELECTRONICS ENGINEER Laurel Weiske:CAD/CAM SUPERVISOR *All members will be equally.

Slides:



Advertisements
Similar presentations
PDR Process Level B and C. UC PERFORMANCE & DEVELOPMENT REVIEW 2009 – Academic Staff Staff member preparation (Academic staff) Supervisor preparation.
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Mobility: Stair Navigation and Turning Team MIEUX – ASME Design Competition September 23, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel Weiske.
ENTREPRENEUR PROJECT THIRD GRADE PROJECT Culiacán Sinaloa August 2010.
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 8, 2011.
1 116 TEAM 116 SUBGROUP_NAME_HERE Critical Design Review 1/15/2015.
Multidisciplinary Engineering Senior Design Project 05xxx Project Name 2005 Critical Design Review May 13, 2001 Project Sponsor: Team Members: Team Mentor:
9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Team Name Conceptual Design Review University/Institution Team Members Date.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /25/2009Digital Evolutions | Software.
Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
Preliminary Design Review 1: Project Plan Senior Design: Team Burja ___________________________________________________________________________________________________________________________________________________________________________________________
CHASSIS DESIGN: Shape Team MIEUX – ASME Design Competition September 30, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel Weiske TEAM MIEUX.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Preliminary Design Review 6:  Concept Revision  Chassis Design Senior Design: Team Burja ____________________________________________________________________________________________________________________________________________________________________
Pratham Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer:
Pratham Presenter: Reed Langton Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control.
Pratham CAD/CAM Drawings & Component Integration Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM:
Rice Delivery System Team MIEUX – ASME Design Competition September 9, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel Weiske TEAM MIEUX.
Rice Delivery System Team MIEUX – ASME Design Competition September 9, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel Weiske TEAM MIEUX.
Central Power Mouse Group Members: Stacey Mitani Jeremy Perron (team leader) Erica Salvador Reid Ueda.
Preliminary Design Review EE 296: Micro Mouse Spring 2007.
Falcon Enterprises Welcome Mr. Jay Bebb & Mr. Brian Peppiatt.
Controls and Counterbalance Team MIEUX – ASME Design Competition October 7, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel Weiske TEAM MIEUX.
TEAM MIEUX Parts and Manufacturing Processes Team MIEUX – ASME Design Competition October 28, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel Weiske.
14 October 2004AME 470 – Team Unum PDR #10 – 11 November 2004 Subsystem Integration Tim Culbertson Team UNUM.
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CAD/CAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
Organizational Chart – Management Team Chief Operating Officer Sales/Mktg Manager Operations Manager Quality Manager Technology Manager Finance Manager.
Applying “Engineering Processes” to solve problems Learning to apply project management systems Tools to manage time and resources Accessing information.
Microcontroller Hands-on Workshop #4 Ahmad Manshad New Mexico State University Institute of Electrical and Electronics Engineers November 14, 2009.
Greensboro City Advisory Group on Sustainability Plan of Work General Activities Meeting Schedule Typical Meeting Agenda Ongoing Activities.
ME/MECA 238A1 ME/MECA 238A - Mechanical/Mechatronic Design Project I Course notes prepared by G.A. Kallio, based on The Mechanical Design Process, by D.G.
Mentors Workshop General Topics Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 2015.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
Critical Design Review (CDR)
1 Team Mieux Critical Design Review ASME Bulk Material Transporter AME 470 Ltd. December 7, 2004.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
PDR Computer Aided Design AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 11 November 2004.
THE FUTURE IS NOW Mechanical Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - About the Innovative Project & Applicability.
Team Concept and Key Issues AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 16 September.
Preliminary Design Review (PDR) Advanced Energy Vehicle.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
18 March 2004 / Rev. 01 Cyber Blue – Team 234 Perry Meridian High School Indianapolis, IN Design Review Process Documentation This document is intended.
First-Year Engineering Program Preliminary Design Review (PDR) Definition PDR Objectives PDR Material Project Management Review.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
TEAM MIEUX Electronics and Power Distribution Team MIEUX – ASME Design Competition November 4, 2004 Stefan Campbell Carlos Celada Chris Villani Laurel.
Introduction to New Product Development (Portfolio)
2K CB FDR Overview:  Agenda, Charge, Review Process
Full Pull Engineering Notebook
Drawings.
Team member1 Team member2 Team member3 Team member4 Feb. **, 2009
Team member1 Team member2 Team member3 Team member4 October 2016
VirtuLab: Web Based Flow Visualization Facility
Workshops, Assignments and Work place visits
2019 TEKNOFEST ROCKET CONTEST PRELIMINARY DESİGN REPORT (PDR)
Capstone Team Project title
Tropical cyclones movement
Instrument Overview Larry Springer HMI Program Manager
The Design Process.
2015 January February March April May June July August September
Presentation transcript:

Stefan Campbell: TEAM LEADER Carlos Celada:CHIEF ENGINEER Chris Villani:ELECTRONICS ENGINEER Laurel Weiske:CAD/CAM SUPERVISOR *All members will be equally involved in fabrication processes supervised under the chief engineer **Issues involving controls will be addressed by the electronics engineer Team MIEUX Positions

TEAM MIEUX GANNT CHART ASME PROJECT

Preliminary Design Review Topic Schedule Tentative PDR Topics August 26: Team Organization and PDR Scheduling August 31: Design Requirements, Specifications and Constraints September 7: Key Design Issues (as considered in individual concept proposals) September 14: Team Concept Proposal September 21: System Mobility September 28: Mechanical Unloading System (Rice Transportation) October 5: Motor and Servos (Specifications and Design Drivers) October 12: In House Part Design (Pro/Engineer Designs and CAD/CAM) October 26: Bill of Materials (Vendors, Cost, Part Numbers, Fabrication) November 2: Outstanding Design Issues November 9: Detailed Product Proposal (Exploded Drawings of Assembly and Complete Fabrication Plan) November 16: Demonstration of Electronics