SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

of LFD Compensation Study S1 Global Cryomodule
FNAL Superconducting RF Program Sergei Nagaitsev.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
SRF_BizPlan_31Oct2010_Rev_14 Production Preparations at JLAB JLab SRF Team EDMS – PLM DESY TeamCenter Meeting at SLAC 31 MAR 2014.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
Dark Current Measurements and Simulations Chris Adolphsen 2/4/15.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Rolf Lange DESY ILC Workshop 1-June-07 XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Module Industrialisation for XFEL How to proceed.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Detail plan of S1-Global H. Hayano (KEK),
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
9-cell cavity coordination CM Ginsburg 15 Mar
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Recent Result for the STF-2 Cryomodule Operation
Cost Optimization Models for SRF Linacs
Cornell Updates Commissioning of T-map for ILC single cell starts.
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
Electropolishing of Dressed ILC 9-cell Cavity
FNAL recent coupler troubles
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
for the FNAL/ANL, JLab, and Cornell cavity teams
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
WG-1 Session Cavity Performance Cryomodule Performance
LCLS II SRF Cavity Tuner (developed by FNAL)
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Production Cavities in progress
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
High Gradient Cavities: Cost and Operational Considerations
Nick Walker (DESY) EU GDE Meeting Oxford
FRIB summary of performance degradation - VTA to cryomodule
TTC Meeting, 28 February - 2 March, 2011, Milan
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011

Context ILC “S1” goal: 31.5 MV/m in an 8-cavity cryomodule –DESY did it once with an XFEL prototype –Yet to be demonstrated in Asia/Americas regions Industry/labs are getting good at high-gradient (>35 MV/m) cavities (~50% yield) High-gradient cryomodules still challenging –Maintain high performance of cavities –Functionality of auxiliary components (tuners, couplers, etc.) bare dressed CM1 x 8

Recent History DESY sent us a “cryomodule kit” in 2007 and helped us assemble it --- CM1 –An educational tool… mainly mediocre cavities In parallel, New Muon Lab was re-habbed as a SRF cryomodule test facility –And eventually, a mini-ILC (e- beam, up to 6 cryomodules) –Infrastructure: cryo, RF power, shielding block caves, etc. CM1 was installed at NML and used to commission the facility –First cooldown in Dec 2010 –Mostly successful, lessons learned…. future talk from Elvin Harms CM2 now under assembly as first US-built ILC CM

Vertical Tests ILC S0 spec = CM2

CM2 Cavity VT Results Q 0 vs. E acc Field Emission (X-rays)

Horizontal Tests = CM2 ILC S1 spec

(some) CM2 Cavity HT Results For a dressed cavity, Q 0 must be measured from heat dissipated to cryo 1 W or less, DIFFICULT measurement Q vs E in general agrees with VT results to within a factor of 2 But usually a little lower Plan to re-visit the methodology, investigate alternate approaches

Those left behind 8/14 cavities tested were deemed CM2-worthy, what about the rest? –2 performed just as well as they did in VT, but were not 35 MV/m One went to KEK for the S1-Global project, one was a CM2 backup –1 quenched early (33 MV/m) due to heating from FE Has since been HPR’d, likely OK now –1 had extremely high FE that was NOT fixed by HPR –1 quenched early (29 MV/m) for reasons unknown (no FE) Very few quench diagnostics possible with a dressed cavity –1 had an input coupler breakdown that contaminated the cavity No FE before breakdown, extremely high FE after breakdown Breakdown happened at ~37 MV/m, led to administrative HT limit of 35 MV/m

Input Coupler Failure Void in Cu plating “vapor trail”

Tuners Slow blade tuner for static tuning of the cavity frequency Modifications to stepper motor linkage to address failure mode uncovered in horizontal testing Dynamic compensation for Lorentz force detuning using fast piezoelectric tuners Piezo OFFPiezo ON

Discussion and caveats One CM2 cavity had a miserable horizontal test –Extremely high heat loads, hard to even do a meaningful test –Upon disassembly of input coupler, glitter-like flakes of copper found stuck to antenna tip and elsewhere FNAL and SLAC working with vendor to understand plating process and improve QA –HPR and subsequent vertical test of cavity (dressed) showed very good performance, so used for CM2 One “good” cavity was removed from HTS, and then immediately reinstalled and re-tested –Result: FE observed where there had previously been none Changed cavity handling procedures to eliminate contamination risk State of previously “successful” cavities (four) called into question –HPR and subsequent horizontal test showed good performance again Re-HPR’d the four CM2-ready cavities, but no horizontal re-test

Conclusions Eight cavities have been certified in the HTS for CM2 assembly –7 reach at least 35 MV/m, one reaches 33 MV/m ILC S1 goal theoretically attainable –Cavities look good from a Q 0 and FE standpoint as well Most cavity tests were successful –Demonstrates that high performance can be maintained through the dressing process –The failed tests have helped point out areas of improvement for the CM production chain Coupler QA, handling, etc. Will good cavities make a good cryomodule? –I’m cautiously optimistic

Thanks CM2 under assembly at MP-9