Real Time Mitigation During Exceptional Fuel Cost Events.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Resource Cost Working Group December 2, 2015 WMS Update.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
TPTF Verifiable Cost Sub-group Summary Report to TPTF 1/21/2008 Jim Galvin- TPTF VC Sub-group Chair.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1 Exposure Stress Testing CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public June 12, 2014.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Fuel Cost Components in the Fuel Adder
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
Fuel Cost Components in the Fuel Adder
Real-Time Co-optimization of Energy & Ancillary Services
RMR Update November 6, /05/2002.
Resource Cost Working Group
Presentation transcript:

Real Time Mitigation During Exceptional Fuel Cost Events

Challenges/Outline Allowing for cost recovery during “exceptional fuel cost events Defining “Exceptional Event” Verifying Costs Interim Settlement Solutions discussed ◦ RUC vs Emergency Energy ◦ Who Pays? Questions and other discussion

Fuel Cost Events February and March 2014 movements in spot gas prices created significant change from Day Ahead FIP to spot price Generators dispatched at MOC versus EOC were settled at Day Ahead FIP resulting in losses based on the gas price move Current protocols do not allow for cost recovery unless during a RUC RCWG has discussed ways to allow for cost recovery during such events

Defining Exceptional Event Exceptional event will be defined as some deviation from Day Ahead FIP to spot price ranging from: ◦ Spot prices are greater than DA FIP + Fuel Adder ◦ Spot prices as a factor of DA FIP Factors to consider: ◦ Frequency of occurrences ◦ Interim versus long term solutions ◦ Impact of manual settlement process through disputes and cost verification (Interim) ◦ System Changes (Long-term solution)

Verifying Costs Cannot simply settle on differences between DA FIP and spot price Entities must provide proof of purchased fuel Other costs to be considered? Transportation Real Time fees Imbalances Swing fees Building a process that settles these types of conditions forward would be challenging

Interim Settlement Solutions RCWG discussed the option of treating mitigated resources during such events similar to RUC units that do not recover their costs RUC committed resources not recovering costs can dispute and recover their true costs RUC costs are paid by entities that are short in the market up to 2X their short fall and then uplifted to Load on a ratio share basis RUC costs are defined by protocol for capacity concerns, not transmission constraints

Interim Settlement Solutions Resources mitigated during real time and settled on their MOC are utilized for transmission constraints not capacity concerns Therefore, is a RUC Settlement solution appropriate? Transmission issues settle in imbalances through Real Time Energy, CRRs and Revenue Neutrality Does this set precedent for uplift of costs during an exceptional event? Interim approach could utilize Emergency Energy Payment method for settlement of cost recovery

Emergency Energy Settlement Approach Emergency Energy Volume- Min (BP, RTMG) (minimum of Base Point or metered output) Current Settlement Price - MAX (0, EMREPR – RTSPP) (maximum of 0 or Emergency Energy Price minus Real Time Settlement Point Price) Manual solution would replace EMREPR with the appropriate MOC price recalculated at verified FIP (spot price paid for fuel during event) Requires dispute and ERCOT capability to calculate (ERCOT does something similar today for LDL overrides)

Questions/Discussion