Problems and solutions For any given solution, a frequency planner can find a problem.

Slides:



Advertisements
Similar presentations
Object Oriented Programming
Advertisements

Information Meeting on RRC-04/05, September 03 1 Approaches to Frequency Planning for RRC-04/05 Nigel Laflin Rapporteur for Chapter 3 of the TG6/8 report.
Linked requirements and their impact on planning Borislav M. Rackov ITU/BR/TSD/TPR Linked requirements and their impact on planning Borislav M. Rackov.
Conversion of Analogue Assignments into Digital Allotments Conversion of Analogue Assignments into Digital Allotments The Channel Potential Method Dr.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 RRC technical.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Planning.
Requirements and declarations Ken Hunt EBU Technical department.
Regional Radiocommunication Conference Information session Results of the second synthesis of the draft Plan Pham Nhu Hai PXT Team Leader Radiocommunication.
Transition Procedures Jan-Peter Bengtsson, Chapter 6 Rapporteur
RRC 04/05 ITU Information meeting September Computer methods for planning Ken Hunt Rapporteur for Chapter 10.
1 NETWORK CONFIGURATIONS _______ BR Seminar September 2003 Jean-Jacques GUITOT ANFR - DPSAI – Dépt Planification – Etudes prospectives
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Analysis.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
BR/TSD Accra 2005 BCD Workshop for the African Countries Second series of results of the first planning exercise 10 – 14 October 2005 Accra David Botha.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Principles and Approaches Сентябрь 2004 Москва David Botha.
The Channel Potential Method Dr. Roland Beutler Germany Practical Considerations.
BR/TSD Dakar 2005 BCD Compatibility Analysis 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
BR/TSD Dakar 2005 BCD Planning Software 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
BR/TSD دمشق 2005 BCD Planning Software أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Software Сентябрь 2004 Москва David Botha.
Regional Radiocommunication Conference 2006 (RRC-06) Regulatory and Procedural aspects François Rancy Chairman, Regulatory and Procedural Group.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Working.
OVERVIEW OF INTERSESSIONAL ACTIVITES Eng. Taha A. Usi Ag. Zonal Manager TCRA, Zanzibar
BR/TSD Dakar 2005 Workshop for the African Group of Countries BCD Planning Principles and Approaches 25 – 29 April 2005 Dakar David Botha.
1 Some important points on Regulatory Issues discussed at the second meeting of the Sub- working Group of RPG 1.Regulatory text for the new regional Agreement.
We will begin promptly at 6:00 pm
BUSINESS EGGS NEGOTIATION. RELATIONSHIP CONFLICTS Strong Emotions Misperceptions or Stereo types Poor or miscommunication Negative behavior DATA CONFLICTS.
STATISTIC & INFORMATION THEORY (CSNB134) MODULE 12 ERROR DETECTION & CORRECTION.
CENG536 Computer Engineering department Çankaya University.
Options for Wide Area Only and Wide Area and Local Area Operations
1 Compatibility of Digital Broadcasting and Mobile Services Regional Seminar on Digital TV Broadcasting Algiers, 4-5 December 2007 Presented by Jan Doeven.
Error Measurement and Iterative Methods
1 Multi-radio Channel Allocation algorithms based on game theory analysis Shirin Saeedi Bidokhti Supervised by Mark Felegyhazi Prof. Hubaux Feb
Usable Security (Part 1 – Oct. 30/07) Dr. Kirstie Hawkey Content primarily from Teaching Usable Privacy and Security: A guide for instructors (
Slide 1 Preparation for Negotiation The Four Phases of negotiation Phase One: how to prepare Phase Two: how to debate Phase Three: how to propose Phase.
EU: Bilateral Agreements of Member States
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
Interest-Based Bargaining
Project Workshops Results and Evaluation. General The Results section presents the results to demonstrate the performance of the proposed solution. It.
PH4705/ET4305: A/D: Analogue to Digital Conversion
Radial Basis Function Networks
13 Intellectual Property 1 Aaron Schiff ECON Reading: Cabral p , Deak p
Information Coding in noisy channel error protection:-- improve tolerance of errors error detection: --- indicate occurrence of errors. Source.
1 2. Independence and Bernoulli Trials Independence: Events A and B are independent if It is easy to show that A, B independent implies are all independent.
COMP106 Assignment 2 Proposal 1. Interface Tasks My new interface design for the University library catalogue will incorporate all of the existing features,
Computers and Scientific Thinking David Reed, Creighton University Functions and Libraries 1.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
CELLULAR CONCEPT SHUSHRUTHA K S “Provide additional radio capacity with no additional increase in radio spectrum”
CMP-MX21: Lecture 4 Selections Steve Hordley. Overview 1. The if-else selection in JAVA 2. More useful JAVA operators 4. Other selection constructs in.
CY2003 Computer Systems Lecture 04 Interprocess Communication.
RALI FX3 Microwave Fixed Services Frequency Coordination Glenn Odlum Senior Engineer Spectrum Engineering Section
©Ofcom Spectrum reform in the UK: The development of Spectrum Usage Rights Professor William Webb 2006.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Salient.
Fundamental of International Business Negotiation
HighImpactSoft 2010 Organizing a Better Future. Agenda Specify Goals ScopeDefinitions Process Model Preliminary Requirements Issues and solutions TraceabilityPrototype.
Teaching Learning Methods Dr. Kalpesh Chandrani Assistant Professor, Department of Psychiatry, PDU Medical College, Rajkot.
1 Sections 7.2 – 7.7 Nested Control Statements Fundamentals of Java: AP Computer Science Essentials, 4th Edition Lambert / Osborne.
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
Multilateral Frequency Coordination Meeting of Caspian and Central Asia administrations on the UHF band 30 – 31 March, 2017 Overview of the DSO and Digital.
SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK
Storage Virtualization
Quantum One.
Ethernet Network Network Interface: Heavy or Light?
Shared Memory Programming
Automating Profitable Growth™
System Testing.
Regional Seminar on Digital TV Broadcasting
Digital Sound broadcasting ITU Regulation
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
Presentation transcript:

Problems and solutions For any given solution, a frequency planner can find a problem

Problems and solutions For some problems a frequency planner can find a solution

Problems and solutions We have been dealing with a planning exercise The purpose was to TEST:

Problems and solutions We have been dealing with a planning exercise The purpose was to TEST: – input data mechanism

Problems and solutions We have been dealing with a planning exercise The purpose was to TEST: – input data mechanism – computer methods and implementation

Problems and solutions We have been dealing with a planning exercise The purpose was to TEST: – input data mechanism – computer methods and implementation – reality

Problems and solutions We have been dealing with a planning exercise The purpose was to TEST: – input data mechanism – computer methods and implementation – reality planning assumptions

Problems and solutions We have been dealing with a planning exercise The purpose was to TEST: – input data mechanism – computer methods and implementation – reality planning assumptions implications of input data

Problems and solutions In such a complex process – it is inevitable that there will be software problems – it is inevitable that software problems will take time to resolve – it is almost inevitable that additional problems will be introduced during the process of extending the software – it is inevitable that there will be some human errors when applying the software

Problems It may be useful to illustrate some of the problems – in terms of spectrum demand – in a pictorial manner This makes it more personal We have heard that there can be many more than 100 mutually incompatible requirements to be accommodated in 49 channels This is what they look like for three geographic areas

It must be noted that due to display limitations it cannot be guaranteed that all of the coverages in these areas have been shown, nor can it be guaranteed that all of them are mutually exclusive It must also be noted that any of the contours shown can actually represent multiple (identical) coverages which have been superimposed

Problems There is no obvious real solution that can be offered to solve this problem The 'solution' of the 1987 HF conference – put everything into the plan even if it means zero coverage is assumed to be unacceptable

Problems and solutions As there is no single solution, we have to consider a series of small steps We just have to hope that this series of small steps will lead to – 'a giant leap forwards'

Problems and solutions As there is no single solution, we have to consider a series of small steps We just have to hope that this series of small steps will lead to – 'a giant leap forwards' It has to be more than just a hope – we need a high degree of certainty

Problems and solutions As there is no single solution, we have to consider a series of small steps We just have to hope that this series of small steps will lead to – 'a giant leap forwards' It has to be more than just a hope – we need a high degree of certainty This can only be achieved by building the steps on good engineering principles associated with good will on all sides

Solutions None of the small steps is revolutionary Some of them may need an alternative approach to be adopted by some administrations – this applies particularly to 'improvement' of input requirements (None of the following pictures is intended to represent any real situations)

Overlapping assignments

There are two potential sources of problem – the radiated powers may be too high in some cases – the large service areas may be difficult to protect If the powers can be reduced, this is a good start The area to be protected may be reduced by changing the requirement so that it consists of – an allotment to represent the area to be protected – an assignment to provide the coverage – these two requirements should be linked

Overlapping assignments If there is only one assignment, it may be an advantage to submit the requirements as NOT forming an SFN This is a special configuration,having the advantage that – the area of the allotment is regarded as receive only – it does not cause any additional interference – the assignment is regarded as transmit only – it does not increase size of the area to be protected

Overlapping allotments When proposing allotments, there is a temptation to provide some extra coverage – just to be on the safe side

Overlapping allotments

The main problem here is that there is increased difficulty in providing protection The distance to any re-use of any of the channels is then increased Perhaps the service areas can be re-defined so that there are no overlaps

Non-overlapping allotments

Different targets Suppose that there are different coverage targets on each side of a national boundary – One country wants portable indoor reception – The other country wants fixed outdoor reception

Different targets

The interference situation is not symmetrical It may be difficult to reach agreements between the two administrations Perhaps portable indoor reception is not needed throughout the entire allotment area One solution is to try a linked allotment and assignment submitted as an SFN

Different targets

Errors It is essential for administrations to check what the result of their submissions really is There can be major surprises Some errors in defining allotment boundaries have resulted in apparent demands for 20 or more channels for a set of coverages of the same area This corresponds to more than 20 'layers' of coverage This could apply even at VHF There are many opportunities for errors

Analogue protection In many cases there are no channels available for a digital requirement because of the need to protect an analogue assignment There is no single solution – consider submitting the digital requirement as a 'conversion' – consider not protecting analogue – (declare that the digital requirement and the analogue assignment are compatible)

Other service protection Sometimes there are no channels for a digital requirement because of the need to provide protection of an OS assignment Consider the period for which the OS must remain in operation – perhaps this is so short that there will be no simultaneous operation – declare the digital requirement and the OS as compatible

Administrative declarations These can provide a significant improvement in a plan They must be used carefully – ensure that their use will not lead to a subsequent coverage loss

Administrative declarations They must be submitted carefully – they have a unidirectional effect; take care that both directions of interference are considered – take care that all relevant pairs of requirements are dealt with – don't assume that linked requirements will be automatically taken into account

Administrative declarations They must be submitted carefully – they have a unidirectional effect; take care that both directions of interference are considered – take care that all relevant pairs of requirements are dealt with – don't assume that linked requirements will be automatically taken into account – THEY WON'T BE