RADIOCOMMUNICATION BUREAU BROADCASTING-SATELLITE SERVICE PLANS AND LISTS by Mark Griffin BR/SSD/SNP.

Slides:



Advertisements
Similar presentations
An Introduction to the ITU
Advertisements

International Telecommunication Union Yvon HENRI Head, Space Services Department, Radiocommunication Bureau WMO Workshop 2006, Geneva Orbit / Spectrum.
International Telecommunication Union World Radiocommunication Seminar A web portal for broadcasting services Andrea Manara Broadcasting Service Division.
World Radiocommunication Seminar – Geneva 2010 GE84 Agreement VHF-FM Sound Broadcasting Bangaly Fod é Traor é and Jean-Marc Paquet Radiocommunication Bureau.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
International Telecommunication Union World Radiocommunication Seminar (Geneva, 8-12 December 2008)
BR Seminar - Workshop Geneva 30/10 – 03/11/2006
Slide 1 World Radiocommunication Seminar Geneva 15 – 19 November 2004 International Telecommunication Union Radiocommunication Bureau Space Plans System.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
1Geneva, 30 October - 3 November 2006 BROADCASTING-SATELLITE SERVICE AND ASSOCIATED FEEDER-LINK PLANS AND LISTS by Mark Griffin BR/SSD/SNP.
Slide 1 World Radiocommunication Seminar Geneva, November 2004 AP30/30A Plans & Lists Workshop Examination of a Satellite Network submitted under.
BR seminar - Space Workshop - November 2006
BR Information Meeting on RRC-04/05 (Geneva, 18 – 19 September 2003) RRC-04/05: Terms of reference and scope of work T. GAVRILOV Radiocommunication Bureau.
Slide 1 World Radiocommunication Seminar Geneva, November 2004 AP30/30A Plans & Lists Workshop Submission of Appendix 4 information under Articles.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
BR/TSD Dakar 2005 BCD Reference situations and salient points for Administrations in the RCC region 25 – 29 April 2005 Dakar Workshop for the African Group.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Principles and Approaches Сентябрь 2004 Москва David Botha.
Notification of Digital requirements for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
Regional Radiocommunication Conference 2006 (RRC-06) Regulatory and Procedural aspects François Rancy Chairman, Regulatory and Procedural Group.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Working.
1 Some important points on Regulatory Issues discussed at the second meeting of the Sub- working Group of RPG 1.Regulatory text for the new regional Agreement.
Paris Mar 2011 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor EUR RPS for WRC-12 preparation.
Cairo Sept 2010 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor MID RPS for WRC-12 preparation.
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
Yvon Henri Radiocommunication Bureau ITU.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.1 The Directors Report to WRC-15.
1. The ITU Radiocommunication Sector (ITU-R) will remain the unique and universal convergence and regulatory centre for worldwide radiocommunication matters.
Earth Stations on Mobile Platforms (ESOMPs)
ITU-R World Radiocommunication Seminar Geneva, 8–12 December 2008 SpaceQry Workshop Space Query and Extract System Steve Boswell Space Administrative Software.
1 International Spectrum Management and Interference Mitigation N. Vassiliev, Radiocommunication Bureau, ITU.
WRC-07 Workshop Select Critical Issues with a Commercial Sector Focus Jennifer A. Manner Mobile Satellite Ventures USITUA WRC Seminar September 19, 2007.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.13 – BSS and feeder links 21.4–22 GHz Presenter: Geoff McMillen.
WRC 2007 Results October 22 ~ November 16, 2007 Geneva, Switzerland Masatoshi OHISHI RAFCAP meeting 2008.
National Science Foundation 1 Dr. Tomas E. Gergely Electromagnetic Spectrum Manager National Science Foundation Registration of Radio.
Satellite Coordination R. J. Cohen R. J. Cohen Jodrell Bank Observatory University of Manchester Jodrell Bank Observatory University of Manchester 13th.
Radio Regulations Rights & obligations + applicable procedures Two mechanisms of sharing orbit / spectrum: Coordination Approach Efficiency First come,
How is Technical & Regulatory Examination carried out in the BR - a detailed view.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
RALI FX3 Microwave Fixed Services Frequency Coordination Glenn Odlum Senior Engineer Spectrum Engineering Section
WHAT HAPPENS TO SATELLITE NETWORK FILINGS IN RADIOCOMMUNICATION BUREAU.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
1 Improving the Radio Regulations, Prospective WRC (WRC-15) Agenda Items Per Hovstad, Principal Spectrum Engineer Asia Satellite Telecommunications Co.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
1. 2 Notification of frequency Assignments for recording in the Master Register Prepared by : Eng.yasir Mohammed Bashar
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
Agenda item 1.16 VHF data exchange system (VDES).
International Telecommunication Union Document WRC-15-IRWSP-15/8-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
International Spectrum Management and Interference Mitigation
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Radiocommunication Bureau International Telecommunication Union
Non Planned Space Services (Coordination and Notification procedures)
Bundesnetzagentur Use of the Fixed Satellite Service for RPAS C2 link (ITU Resolution 155 (WRC-15)) Martin WEBER REGIONAL PREPARATORY GROUP.
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi.
Panel Session 5 WRC-15 Agenda items 1.6, 1.8, and 1.7
Draft ICAO Position for ITU WRC-19
COSPAR SA 2008, E110 IUCAF session
SADC WRC-15 Preparatory Meeting
Digital Sound broadcasting ITU Regulation
Coordination of Satellite networks
Possible Future Agenda Items
Agenda Item Overview & draft India proposal
GSC position on key WRC-19 AI 1.5 ESIMs
Presentation transcript:

RADIOCOMMUNICATION BUREAU BROADCASTING-SATELLITE SERVICE PLANS AND LISTS by Mark Griffin BR/SSD/SNP

Outline Introduction Frequency Bands Plans Lists Compatibility Criteria Main Regulatory Aspects Processing of Article 4 Submissions

FREQUENCY BANDS The BSS Plans and Lists cover the following frequency bands: Region 1: GHz (space-to-Earth) GHz (Earth-to-space) GHz (Earth-to-space) Region 2: GHz (space-to-Earth) GHz (Earth-to-space) Region 3: GHz (space-to-Earth) GHz (Earth-to-space) GHz (Earth-to-space)

BSS PLANS Appendix 30 Downlink Plans (12 GHz) - Regions 1 and 3 Plan (234 beams) - Region 2 Plan (238 beams) Appendix 30A Feeder-link Plans (14 & 17 GHz) - Regions 1 and 3 Plans (308 beams) - Region 2 Plan (238 beams)

APPENDICES 30 & 30A PLANS PLAN REGION FREQ.(GHz) YEAR Downlink / 85 Downlink /2000 Downlink /2000 Feeder-link / 85 Feeder-link 1 & /2000 Feeder-link 1 & /2000

ELEMENTS OF PLANS National assignments are included in: Articles 10 & 11 of Ap.30 (downlink) Articles 9 & 9A of Ap.30A (feeder-link) These Articles describe: orbital position, channels, polarisation, power levels, antenna patterns, emission designation, beam coverage, grouping...

Plan & List Beams

WRC-2000 PLAN WRC-2000 developed a new Plan that included: 10 channels in Region 1 and 12 channels in Region 3; new national beams/assignments for East Timor and the Seychelles; 5 extended-coverage national beams for 15 administrations; 30 "composite" beams; new protection ratios and other technical parameters; orbital position preferences for 63 administrations; and 20 other national preferences.

REGIONS 1 AND 3 LISTS Regions 1 and 3 Lists of Additional Uses: Downlink List - 12 GHz List (currently 32 networks/3329 assignments) Feeder-link List - 14 GHz List (currently 1 network/6 assignments) - 17 GHz List (currently 34 networks/2064 assignments)

ELEMENTS OF LISTS Created at WRC Separated from the Plans and annexed to the Master Register (MIFR). Lists are evolving and will be updated and published periodically by the BR. Assignments in the Lists must be compatible with the Plans and other services.

ELEMENTS OF LISTS (contd) Digital modulation only Data elements submitted using Appendix 4 Non-monopolisation provisions 15 year time limit Provisions for use of assignments on a non- interference basis in case of disagreements Provision to accommodate assignments for new ITU Member States

COMPATIBILITY BETWEEN PLAN AND LIST ASSIGNMENTS Plan assignments –Regions 1 & 3 Plan based on EPM –Region 2 Plan based on OEPM List assignments –Regions 1 & 3 List based on EPM and also PFD for the downlink.

Compatibility Criteria for Regions 1 & 3 Plan Assignments Equivalent Protection Margin (EPM) is used as compatibility criteria for the Regions 1 & 3 Plans as follows: M i = protection margin = (dB) i = interference type (1=co-channel, 2 & 3 = upper & lower first adjacent channels); PR i = protection ratio for a given interference type i.

Compatibility Criteria for Region 2 Plan Assignments Overall Equivalent Protection Margin (OEPM) is used as compatibility criteria for the Region 2 Plan as follows: M i = protection margin = (dB) i = interference type (1=co-channel, 2&3=upper & lower first adjacent channels, 4&5= upper & lower second adjacent channels); PR i = protection ratio for a given interference type i.

Compatibility Criteria for Regions 1 & 3 List Assignments Based on both EPM and PFD criteria. –EPM criteria as per the Regions 1 & 3 Plan –PFD criteria also used to identify affected assignments as per Annex 1 of Ap.30

MAIN REGULATORY ASPECTS BSS Downlink/ Feeder-link - Modification/Addition/Coordination (Article 4) - Notification/Implementation (Article 5) Terrestrial - Coordination/Notification (Article 6) FSS - Coordination/Notification (Article 7) Space Operation/TT&C in the Guardbands - Coordination/Notification (Article 2A)

ARTICLE 5 EXAMINATION conformity with the Convention, Table of Allocations, other provisions conformity with the Plan and List (except reduced e.i.r.p, reduced coverage etc.) protection of other services in specific cases Notified technical characteristics have to be the same as those in the Plans or Lists except those allowed in provision d)

ARTICLE 4 EXAMINATION (Appendix 30 Regions 1 & 3) Protection of the Regions 1 & 3 Plan and List - SPS/MSPACE: EPM & PFD calculations Protection of Region 2 Plan - GIBC(PXT)/GIMS: PFD Protection of Terrestrial Services - GIBC/GIMS: PFD Protection of Region 2 and Region 3 FSS - GIBC(PXT)/GIMS: PFD

ARTICLE 4 EXAMINATION (Appendix 30A Regions 1&3) Protection of Regions 1&3 Plan and Lists - SPS/MSPACE: EPM calculation Protection of the Region 2 Plan - GIBC(Appendix 8): delta T/T Protection of Region 2 FSS receiving feeder- link space stations ( GHz) - GIBC(Appendix 8): delta T/T

Processing of Article 4 Submissions (1) Bureau is currently processing all as yet unpublished submissions received under Article 4 using the revised Appendices 30 and 30A in accordance with Resolution 546 (WRC-03). Special Sections, that contain the filed satellite network characteristics and potentially affected administrations, are being published in BR IFICs. Administrations should examine each BR IFIC to see if its assignments are affected and respond within 4 months.

Processing of Article 4 Submissions (2) Affected administrations that do not comment within the 4 month period are deemed to have agreed. After the 4 month period has expired, the BR prepares a list of coordination agreements required and publishes this in a Part D Special Section. Results of the Bureaus MSPACEg calculations are also placed on the BR IFIC. Workshop session will explain this in more detail.

Plan and List data All Plan and List assignment data can be found on the BR IFIC & the ITU website at: Contained in the SPS database (SNS Version 5 format). Contains the technical characteristics and reference situation for all Plan, List and pending Article 4 assignments. The SPS database is evolving and is updated regularly.

Post WRC-03 Activities Update of the Reference Situation (EPM/OEPM) for Plan & List assignments; Implementation of Resolution 548 (WRC-03); Implementation of the grouping concept in Regions 1 & 3; Processing of Article 2A, 4 & 5 notices; Implementation of Resolution 547.

Assignments in the SPS Database

Workshop Sessions How to determine if an administration is identified as affected by a proposed Article 4 satellite network in BR Publications; Using the SPS and other BR software applications to obtain the technical examination results; Part A and Part B Examination of an Article 4 network; Submission of Appendix 4 information under Articles 4 and 5 & Res.49 using SpaceCap v5