2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

WestConnect, RTO1 Western Electricity Coordinating Council Board of Directors Meeting June 5, 2002 WestConnect RTO Cary Deise Arizona Public Service Co.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Arizona Corporation Commission Workshop
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
State of the Arizona Energy System Examining the current state of Arizona’s energy mix in the context of the Clean Power Plan.
Ecological and Recreational Flows Workgroup Colorado River Basin Water Supply and Demand Study Next Steps Urban Water Institute August 14, 2014 San Diego,
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
Moving Forward after the Colorado River Basin Water Supply & Demand Study CRWUA Las Vegas, NV December 10-12, 2014.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
Arizona Electric Power Cooperative, Inc.
Arizona Corporation Commission Hot Topics Presentation to NARUC Staff Subcommittee on Accounting and Finance May 7, 2009.
WestConnect RTO Remarks of Charles Reinhold Project Manager FERC’s Regional Technical Conference Phoenix, Arizona September 24, 2003.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
WestConnect Regional Transmission Service Tariff March 16, 2015.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Arizona Corporation Commission Docket No. E-00000D Biennial Transmission Assessment Workshop II September 18, 2008.
Designing for Renewable Energy A View From Arizona BLM Jim Kenna April 2010.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
The Lower San Pedro Valley and Aravaipa: Worthy of Protection.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Arizona Corporation Commission Energy Workshop February 16, 2001.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
Dynamic Signal Workshop January 14, 2016 APA Office Phoenix, Arizona 1.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill ) 1.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
ABOUT PUBLIC POWER PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public.
RTCA Display for Increased Situational Awareness
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
Trends in Generation Dispatch
BHP 2016 Formula Rate True-Up Meeting
SunZia Project Description
BHP 2015 Formula Rate True-Up Meeting
BHP 2017 Formula Rate True-Up Meeting
WestConnect Regional Transmission Service Tariff
Presentation transcript:

2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4, 2010

Entities with Generation, Transmission and Distribution Facilities within SATS Arizona Public Service (APS) Central Arizona Water Conservation District / Central Arizona Project (CAWCD/CAP) Duncan Valley Electric Cooperative (DVEC) Graham County Electric Cooperative (GCEC) Southwest Transmission Cooperative (SWTC) Sulphur Springs Valley Electric Cooperative (SSVEC) Trico Electric Cooperative (Trico) Tucson Electric Power Company (TEP) UniSource Energy Services (UNSE) Western Area Power Administration (Western)

Other SATS Participants Acciona Arizona Corporation Commission (ACC) Staff Arizona Power Authority (APA) Arizona Independent Scheduling Administrator (AzISA) Black Forest Partners El Paso Electric (EPE) Environmental Planning Group (EPG) Federal Energy Regulatory Commission (FERC) Staff Freeport-McMoRan (FMI) Fort Huachuca Kleinfelder New Mexico Renewable Energy Transmission Authority (NM RETA) Public Service Company of New Mexico (PNM) Salt River Project (SRP) Southwestern Power Group SunZia, LLC Tessera Solar United States Bureau of Reclamation (USBR) WestConnect Planning Staff Western States Energy Solutions (WSES)

SATS Area Load Forecast

Combined SATS Entities Load Forecast

Tasks Completed In SATS 2009 Study Plan 2010 through 2014 and 2019 Planning horizon Development of power flow cases Revision of load forecasts – Addressed expected increases in mining load Evaluation of the planned system Identification of planned and potential projects

Conclusions The transmission system in the SATS footprint can reliably meet the needs of Southeastern Arizona with the projects proposed by the SATS participants. Overloads will be mitigated with planned projects, operating procedures, or automated actions.

2010 SATS Study Plan 1.Present Plan and subsequent findings to SWAT, WestConnect, and local stakeholders; 2.Revise load forecasts; 3.Develop base cases for 2010 study; 4.Conduct study to determine impacts of deferring previously planned projects; 5.Investigate alternative configurations to mitigate high flows on the Winchester 345/230 kV transformer, Apache – Bicknell 230 kV line, and Bicknell 345/230 kV transformer caused by EHV system contingencies; 6.Develop and evaluate alternatives to the two joint Tortolita – North Loop 345 kV proposals based on the SPPR three Terminal proposal; 7.Develop and evaluate alternatives for joint SWTC/TEP substation(s) to supply TEP/Trico loads south of Tucson; 8.Identify potential projects in the SATS footprint; 9.VAR Margin Study – 230 kV and above buses.