Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Your performance improvement partner 2/25/
The following 5 questions are about VOLTAGE DIVIDERS. You have 20 seconds for each question What is the voltage at the point X ? A9v B5v C0v D10v Question.
The Science of Biology The study of living things.
Gavin Astin 06 May 2011 Study overview. Study Overview 06 May About DNV Independent foundation with around 9,000 employees. Det Norske Veritas.
Gavin Astin 29 September 2011 Study overview. Study Overview 29 September About DNV Independent foundation with around 9,000 employees. Det Norske.
UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
1 Egypt Vehicle Scrapping and Recycling Programme 7-8 May 2011 Bonn, Germany Challenges and the Road Ahead.
Additionality in the context of PoA –Summary of Task Group Issues identified in the plenary a)Additionality at the PoA level How to construct sufficient.
PoA Challenges & Opportunities
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Michael Lehmann, DNV 12 March 2011 DOE view on the Validation and Verification Standards (VVS) Improve objectivity in the CDM - 7th CDM Joint Coordination.
Regional Distribution
T HE W ORLD B ANK C ARBON F INANCE U NIT J OINT C OORDINATION W ORKSHOP B REAKOUT S ESSION 1.1. P O A M ARCH 2011 P RESENTATION BY F ELICITY S PORS (F.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
UNFCCC secretariat, SDM Ronald Twesigye, Fellow A Case Study on The Uganda Municipal Solid Waste Compost Program The Seventh CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
· © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.
CDM Regional Distribution Ensuring Broader Participation in the CDM Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Validation and verification report templates
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
How to write a successful proposals in individual driven MCA :
Best Practices on PoA Development Dr. Oscar Coto II National CDM Workshop Belize August 2011.
AssessmentAssurance Evaluation Policy development Public Health Action Cycle.
Bus 480 – Lecture 2 Transportation and Assignment models
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
© Janvier 2011 – Joël – J.G. - Gogol Grease - You Are The One That I Want Musique du film « Ghost » Bill Haley – Rock Around The Clock Chris Anderson.
Cecilie B. Heuch, DNV Group Chief HR Officer March Globalisering og rekruttering av de beste - hva ser vi etter? Internasjonaliseringskonferansen.
UK Quality Code for Higher Education The Quality Assurance Agency for Higher Education. Registered charity numbers and SC Research, Development.
UK Quality Code Guide: Further Education & Colleges The Quality Assurance Agency for Higher Education. Registered charity numbers and SC
Web-pa – the tutors’ view Web-PA – a tutors’ view Peter Willmot (School of Mechanical and Manufacturing Engineering)
Two parallel lines intersected by another line   A B Corresponding angles (sehadap) Corresponding angles are congruent  A1 =  B1.
Home Objective Qualifications Education Employment Skills Boosting Learning Retention With BBP James Chang 1199SEIU Education Fund.
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
The INEE Guidance Notes on Teacher Compensation address a critical challenge to quality education by providing a suggested framework for compensating.
UNFCCC secretariat Overview of the PoA and business models Training-Workshop on the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROCESS TO P REPARE AND I NCLUDE CPA S UNDER A CDM P O A.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF V IETNAM R ENEWABLE E NERGY D EVELOPMENT P ROGRAM (REDP) O PERATIONS.
Key changes and transition process
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
Edwin Aalders 24 March 2012 Materiality Applying Materiality in the Flexible Mechanism.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
7th Joint Coordination Workshop “Improving efficiency in the operation of CDM” - DOE Viewpoints DOE/AIE Forum | Werner Betzenbichler | March 2011.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
الوحدة 20 مهارات التواصل مع الآخرين
Challenges in determination of JI projects.
Presentation transcript:

Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011 28 March 2017 DOEs persepctive: Validation of a PoA and CPA Inclusion and best practices for establishing the criteria for CPA inclusion Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011

Outline Par 166 VVM 1.02 The Managing Entity is prime responsible (first port of control) for the inclusion or exclusion of a CPA Para 167 VVM 1.02 All CPA to have demonstrated compliance with POA-DD criteria on additionality and methodological application or any other additional eligibility criteria set out in POA-DD

What are DOEs looking for ? DOEs will check: Overall Capability of the Management Entity Human resources Quality Contol System Legal structure and arrangements Expected number of CPA’s Eligibility criteria set out in POA-DD are being clearly defined and capable of testing and demonstrating additionality of CPA testing and demonstrating applicablity of methodology excluding potential CPAs that do not meet the additionality and methodological requirements Procedures and evidence on how Management Entity assess eligibility criteria of included CPAs Application process of CPA Contractual arrangement between Management Entity and CPA Monitoring Procedures to test continious compliance methodological requirements on CPA Corrective Action Procedures

What should the eligibility criteria be able to do? 28 March 2017 What should the eligibility criteria be able to do? Management / Coordinating Entity Project A1 Project A2 Project A3 Project A4 ELIGIBILITY CRITERIA POA-DD Comply? Yes/No Monitoring of CPAs PoA CPAs CPA 1(A1) CPA1 () Project B4 Project B1 Project B2 Project B3 CPA 2 (A2) CPA 2 () Project A4 CPA 3 (A3) CPA 3 () CPA 4 (A4) CPA 4 (A4) CPA 4 () Project B2 CPA 7 (B4) CPA 6 (B3) CPA 5 (B1) Project B3 Opening slide: In order to demonstrate how a good inclusion process should work I will to demonstrate the processes in the intial validation and first year of operations We have a Management entity and 4 potential CPAs which want to form the PoA. Click mouse: The Management entity defines the eligibitliy criteria using the principles as outline in the previous slide and test the 4 CPAs for their compliance. Since the Management Entity will have worked close with these 4 CPAs to form the PoA it is expected that all the 4 will pass the test. Click mouse: After the registration of the PoA the Mangement Entity starts monitoring the performance of the CPAs and in this example it is found that CPA number 4 did not implement its activities in line with the methodology requirements of the PoA. Click mouse: In this example it is concluded that the NC is such that the CPA is not able to fix it and as such can no longer be part of the PoA and gets consequenlty removed from the PoA by the Management Entity. Click mouse: In the same period that the first CPAs are being monitored the Management Entity has identified a new group of Possible CPAs which it wants to include. During its assessment of the eligbility criteria it concluded that 3 out of th 4 projects could be included and are now put forward to the DOE for inclussion assessment. Click Mouse: The DOE consequently looks at the 3 CPAs and finds that one fo the 3 does in fact not comply with the eligibility criteria of the POA-DD and rejects its registration. Final click to bring home message. CPA 6 (B3) A DOE WILL BE ABLE TO GIVE A POSTIVE VALIDATION IF MANAGEMENT ENTITY CAN DEMONSTRATE THIS PROCESS

THANK YOU !

Safeguarding life, property and the environment 28 March 2017 Safeguarding life, property and the environment www.dnv.com