Harmonized implementation of CDM Accreditation 2003-03-28 CDM-Accreditation Panel.

Slides:



Advertisements
Similar presentations
Learning from Events 12th June 2013 The Tata Steel Approach
Advertisements

SARQA/DKG Conference 3-4 October SARQA/DKG Conference 3-4 OCTOBER 2002 Annex 13 Update An Industry Perspective Michael J Cooke Director, Global.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
UNITED NATIONS Shipment Details Report – January 2006.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Welcome Safety Regulatory Function Handbook April 2006.
1 Session 9 – Government-to-government dispute settlement procedures WTO Dispute Settlement Understanding Vesile Kulaçoglu, WTO Secretariat Dar es Salaam,
Dispute Settlement in the WTO
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
6 December 2006 Design Organisation Approval Workshop DUBLIN
The Managing Authority –Keystone of the Control System
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels March 2003, Bonn, Germany.
UNFCCC secretariat, programme Mayuresh Sarang, Team Lead - Accreditation Standards Team Module 2.2 Calibration regarding Accreditation Assessment Requirements.
International Telecommunication Union Geneva, July THE CERTIFICATION AND APPROVAL REGULATION FROM ANATEL - BRAZIL Julio Cesar Fonseca Technical.
International Telecommunication Union Quito, 6 July REGULATORY ASPECTS ON CONFORMITY ASSESSMENT AND HOMOLOGATION FOR TELECOMMUNICATION PRODUCTS.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
The Municipal Board Making Your Case to the Board Presented by: William Barlow, Chair Lori Lavoie, Vice Chair.
EMS Checklist (ISO model)
Effectively applying ISO9001:2000 clauses 6 and 7.
1 Monthly Rules Education Session January 2012 Transfer Eligibility.
2 |SharePoint Saturday New York City
VOORBLAD.
Checking & Corrective Action
Digital Futures International Forum - Tuesday 18th September 1 Digital Futures International Forum The Digitisation Standard: Back & Forth Stephen Clarke.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Functional Areas & Positions
APNIC Executive Council (EC) Election 1. Overview About 2011 EC Election Voting entitlement Online voting On-site voting Proxy appointment Counting procedure.
An introduction to… INTRODUCTION FROM THE SEA Wendy Jackson NZ Ministry of Foreign Affairs and Trade 1.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
LACPA ISA Presentation
Analyzing Genes and Genomes
Quality Auditing Dr Alan G Rowley
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Overall Audit Plan and Audit Program
Energy Generation in Mitochondria and Chlorplasts
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Abuse Prevention and Response Protocol.

Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Clean Development Mechanism
DNV experiences and viewpoints
Presentation transcript:

Harmonized implementation of CDM Accreditation CDM-Accreditation Panel

2 Contents Foreword Part 1: Impact of revision of Procedure for accrediting OEs Part 2: Significant issues in Requirements for OEs and Procedure for accrediting OEs

3 Foreword This paper provides clarifications by the CDM Accreditation Panel (AP) on Provisions in Procedure for accrediting Operational Entities (OEs) and Requirements for OEs in order to ensure harmonized implementation of CDM accreditation. Part 1 summarizes main impacts of recent revision of Procedure for accrediting OEs while Part 2 covers significant issues in Requirements for OEs and Procedure for accrediting OEs.

Part 1: Impact of revision of Procedure for accrediting OEs (1) 1.1 Implementation of revised Procedure; 1.2 Object of accreditation; 1.3 Object of witnessing; 1.4 Val. and/or Ver./Cert. activities that were witnessed during assessment; 1.5 Projects subject to Val. and/or Ver./Cert. witnessed; 4

Part 1: Impact of revision of Procedure for accrediting OEs (2) 1.6 Grouping of witnessing activities; 1.7 Phase-wise accreditation; 1.8 Publication of new application; 1.9 Requirements vs. check-list; and 1.10 Resolution of any inadequacy. 5

1.1 Implementation of revised Procedure (Para. 2) Any revision shall be immediately made public; A revised procedure supersedes any previous version as of the date indicated on the document [e.g. 30 January, 2003 for this revision]; and A revision to a step in the procedure shall not be applied retroactively if an AE started to undergo this step before the relevant revision took effect. 6

1.1 AP clarification: Regarding the third bullet point (not retroactively), ATs attention is drawn to the fact that many of the revisions adopted in the current version are based on the decisions of clarifications/reminders already made by EB before this revision. 7

1.2 Object of accreditation (Para. 4.2) Only those premises of an AE where the on-site assessment took place shall receive the accreditation/designation as an AE. Any other part of that entity is not accredited/designated. 8

1.3 Object of witnessing (Para. 4.3) Witnessing activities at the stage of validation, and, if appropriate, verification and certification, may be undertaken by considering documentary evidence (e.g. a procedural report). 9

1.4 Val. and/or Ver./Cert. activities that were witnessed (Para. 4.3) Validation and/or verification and certification activities witnessed during the accreditation procedure, are considered valid if the AE is successfully accredited by the EB. 10

1.5 Projects subject to Val. and/or Ver./Cert. witnessed (note 6 to Para. 4.3) The [Val. and/or Ver./Cert.] tasks witnessed by AT shall be carried out on either proposed and/or registered CDM project activities, as applicable. 11

1.6 Grouping of witnessing activities (Para. 4.3) Third sentence: AP shall decide whether more than one witnessing per scope is required. The second last sentence: … which minimizes costs for an AE (e.g. grouping of such activities for the AE, implementation in conjunction with the on-site assessment of the AE.) 12

1.6 AP clarification A single witnessing of the AE activities might serve, where appropriate, for building confidence in the AEs competence in a couple of related scopes. 13

1.7 Phase-wise accreditation (Para. 6 and note 10 to Para.19.5) The accreditation of an AE may be undertaken in phases. If this is the case, the EB may decide to accredit the AE initially only for validation for the sectoral scope(s) which the AE applied for. The full accreditation shall only be granted to an AE once verification and certification activities have been successfully witnessed ….. 14

1.8 Publication of new application (Para. 17 and 23) Sec.: To publish the name of the AE and the sectoral scope(s) applied for; Parties, accredited NGOs and stakeholders: To provide any comments and information within 15 days; and Sec.: To make the comments received publicly available immediately. 15

1.9 Requirements for OE vs. check-list (note 12 to Para. 20 and note 14 to Para.29.1) Questions* contained in check-list of Reporting Forms shall be considered as prescriptive provisions of generic requirements described in Standards for OEs. [ * e.g.1(g), F-CDM-DR] 16

1.9 AP note: The AP is revising, for immediate use by AT members, the CDM-AT report forms, including F-CDM-DR. Revised version of the report forms will be available to AT members shortly. 17

1.10 Resolution of any inadequacy (Para.29.2) AT shall inform the AE of any inadequacy of the documentation for resolution before proceeding with on- site assessment. 18

1.10 AP clarification: AT shall inform the AE of any inadequacy of the documentation with regard to such documentation listed to be submitted in Application Form, by the judgment of the TL, for resolution before proceeding with on-site assessment. 19

Part 2: Significant issues of Requirements for OEs and Procedure for accrediting OEs 2.1 Para 8 of EB07 report 2.2 Applicant as a legal entity 2.3 Geographical area of activity 2.4 Conflict of interests 2.5 Requirements vs. check-list 2.6 Reporting Form on witness activity 20

2.1 Para 8 of EB07 report (1) Para. 8 of EB07 Report: The Board agreed to clarify that when a project activity proposes a new methodology, in accordance with paragraph 38 of the CDM M&P, a DOE is to check whether documents are complete and shall, without further analysis, forward the new methodology to the Board for its review and approval. After approval of the methodology by the EB, the same DOE, or another DOE, shall undertake the validation of the project activity in accordance with the CDM M&P. 21

2.1 Para 8 of EB07 report (2) The EB recently agreed to further clarify that: An applicant entity may submit a new methodology to the EB only if the following conditions are met: –1. A CDM-AT has been assigned to the AE (i.e. the CDM-AP has undertaken a preliminary consideration of the AE and the AE has agreed to the composition of the CDM-AT), and –2. The AE maintains documentary evidence (e.g. a procedural report) for each new methodology submitted to the EB. 22

2.1 AP clarification AP has recognized that the recent EB clarifications should be reflected to the AP work by asking all AEs confirmation whether they wish either to undergo the on-site assessment not in conjunction with witnessing or to postpone the on-site assessment until such time when they can provide opportunities for on-site assessment in conjunction with witnessing after approval of the new methodology by the EB. 23

2.2 Applicant as a legal entity It has been identified that an application was submitted on behalf of a CDM section within a legal entity. It has also been identified that an application was submitted on behalf of a person who is not formally authorized to represent the legal entity. AP has reminded the applicant that AP is only authorized to accept the application from a person who is formally authorized to represent the legal entity. 24

2.2 AP clarification The AP is only authorized to accept the application from a legal entity but not from a section thereof. The AP is only authorized to accept the application from a person who is formally authorized to represent the legal entity. 25

2.3 Geographical area of activity (1) The recent revision of Procedure includes a provision Only those premises of an AE where the on-site assessment took place shall receive the accreditation/designation as an operational entity Para.1 (f) (vi) of Standards refers to Regional aspects Para. 27 (d) of Section E refers to subcontracting EB 07 decision not to include Regional scope(s) 26

2.3 AP clarification: An AT should assess the AEs policy and procedure which ensure confidence in activities to be carried-out outside of the office that was subject to on-site assessment. The premise of AE which is assessed shall have documented internal procedures for carrying out its functions in any region it chooses to operate; and a management structure that has overall responsibility for performance and implementation of the functions; including all decisions on items (a) through (h) of Para 27 of Section E. It shall not delegate its responsibility to others, including its branch office or subcontracted organization(s). 27

2.3 AP clarification, annex-1 Section E Designated operational entities of CDM M&P 27. A designated operational entity shall: –(a) Validate … ; –(b) Verify and certify …; –(c) Comply with applicable laws …; –(d) Demonstrate that it, and its subcontractors, have no real or potential conflict of interest with …; –(e) Perform …, –(f) Maintain a publicly available list of all CDM …, –(g) Submit an annual activity report …., and –(h) Make information obtained from project participants publicly available …. 28

2.3 AP clarification, annex-2 Standards for OEs sections: 1(e): Have documented internal procedures for carrying out its functions including, among others, procedures for the allocation of responsibility within the organization and for handling complaints. These procedures shall be made publicly available. 1(g): An OE shall have a management structure that has overall responsibility for performance and implementation of the entitys functions, including quality assurance procedures, and all relevant decisions relating to validation, verification and certification. The AE shall make available (i) through (vi). 29

2.4 Conflict of interests (1) Para. 27 (d) of Section E of CDM M&P: A DOE shall demonstrate that it, and its subcontractors, have no real or potential conflict of interest with the participants in the CDM project activities for which it has been selected to carry out validation or verification and certification functions. 30

2.4 Conflict of interests (2) Para. 2 of Standards of OEs: An AE shall meet the following operational requirements: (a) Work in a credible, independent, non- discriminatory and transparent manner, complying with applicable national law and meeting, in particular, the following requirements: (i) An AE shall have a documented structure, which safeguards impartiality, including provisions to ensure impartiality of its operations; 31

2.4 Conflict of interests (3) (ii) If it is part of a larger organization, and where parts of that organization are, or may become, involved in the identification, development or financing of any CDM project activity, the applicant operational entity shall: - Make a declaration of all the organizations actual and planned involvement in CDM project activities, if any, indicating which part of the organization is involved and in which particular CDM project activities; 32

2.4 AP clarification: 1.The AE, including its subcontractors, shall not be involved in the CDM project activity including consultancy, at any stage/time, for which it has been selected to carry out validation and/or verification and certification functions. (27 (d) M&P and Appendix A M&P 2 (a) (i)) 2.The word it in Para. 2 (a) (ii) of Standards of OEs shall be understood as the AE (Appendix A M&P) but not as a section within the AE. 33

2.5 Requirements vs. check-list It has been noted that in some instances the check-list in Desk Review Report Form does not adequately address the requirement for OEs, e.g. 1 (e) and (g) of Standards for OEs and that Report Form on witnessing has not been amended while the recent revision of Procedure allows witness activities at the stage of validation undertaken by considering documentary evidences provided by AE. 34

2.5 AP note: The AP is revising, for immediate use by AT members, CDM Report Forms including Report Form on Witness Activity. Revised version of the report forms will be available to AT members shortly. 35