+ FLOW RATE ISSUES IN THE ALICE SPD COOLING Rosario Turrisi A.

Slides:



Advertisements
Similar presentations
SPD cooling Test bench Preliminary results CERN (Geneva) A.Francescon Università & INFN Padova 1.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
Lesson 8 SECOND LAW OF THERMODYNAMICS
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
CLAUDIO BORTOLIN SPD Cooling Status INFN – PD / CERN.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Issues about the full scale thermosiphon (TSP ) D. Giugni Thermosiphon Review III, May 28 th 2010 D. GiugniThermosiphon Review III, May
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
COOLING BY EVAPORATION OF PERFLUOROCARBONS Why evaporate? 1. To enhance the heat transfer per unit area The heat transfer coefficient increases significantly.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
A two-stage system for the future cooling system.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
Air condition installation
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
+ ALICE SPD COOLING CRITICAL ISSUES Rosario Turrisi.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Stato del sistema di raffreddamento del rivelatore SPD di ALICE
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Filter drilling status
Rosario Turrisi INFN Padova
Micro-channel Cooling
Hybrid Pixel R&D and Interconnect Technologies
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
update on UT cooling system
Pixel CO2 Cooling Status
Detector Technology Group
Recirculating CO2 System
VELO Thermal Control System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Aachen Status Report: CO2 Cooling for the CMS Tracker
November technical stop activities:
Presentation transcript:

+ FLOW RATE ISSUES IN THE ALICE SPD COOLING Rosario Turrisi A

+ In this talk Cooling layout Performance history Tests Main suspect Viable solutions Flow vs. thermal contact Final considerations 2

Size: 16x26 meters Weight: 10,000 tons SPD Cooling station ~ 50 m SPD ~ 8 m R i = 39.3mm R o = 73.6mm L = 282mm Silicon Pixel Detector SPD SIDE C SIDE A 3

+ SPD structure 4 SPD Sector Half-barrel Half-stave Ladder 5 sectors 12 half-staves 2 half-barrels 1 sensor 5 read-out chip 2 bump bonded ladders 1 MCM 1 multilayer bus Totale:120 half-staves 1200 ASIC 1200 ASIC 9.83 M channels 9.83 M channels half-stave= basic working unit

+ Detector’s (in)side 1sector = 1 cooling line 1 cooling line feeds 6 staves input: collector box, 6 capillaries 550 mm × 0.5 mm i.d. output: collector box, 6 pipes ~10 cm long, 1.1 mm i.d. 2 bellows in a row, ¼” tube diameter, 6” and 12” length 5 bellows C side (liq) A side (gas)

+ Principle of operation Joule-Thomson cycle sudden expansion + evaporation at constant enthalpy Fluid C 4 F 10 : dielectric, chemically stable, non- toxic, convenient eos Nominal evaporation: 1.9 bar, 15°C PP=patch panels PP3: close to the detector, not (immediately) accessible, PP4: ~6 m upstream SPD 6 ~40m liquid pipes 6/4 mm ~35m gas pipes 12/10-10/8 mm heaters PP4 PP1PP3 p, T Filters (60μm) liquid pump capillaries condenser compressor cooling tube enthalpy pressure two ‘knobs’: liquid-side pressure flow gas-side pressure temperature

+ see M. Battistin’s talk… The plant 7

+ Critical components - 1 Capillaries used to enter the coexistence phase CuNi, 550 mm long, 0.5 mm i.d. Cooling pipes where the heat absorption happens Phynox, 40 μ m wall round 3 mm pipes squeezed to 0.6 mm inner size Both sensitive to pollution! 8

+ D = 5.6 mm T = 11.8 mm X = 0.7 mm (~1 mm in the filtering area) S = 4 mm L = ~5000 mm T D X Filter Swagelok SS-4-VCR-2-60M Swagelok gland 6LV-4-VCR-3-6MTB7 Pipe: SS 316L 4-6 mm i-o diameter Swagelok 316 SS VCR Face Seal Fitting, 1/4 in. Female/Male Nut: SS-4-VCR-1 & SS-4-VCR-1 SEM picture of the filter S L 9 Critical components - 2 no access

10

+ Test in the lab very stable against changes in parameters settings (1-2 sectors at a time) 100% efficiency tested one half barrel at a time full power to the detector (~150 W/sector) 11 For ~ 3 years the system has been tested in the DSF at CERN In the lab, filters where missing (60 μ m in line and the final 1 μ m filter on the plant)

+ Efficiency history 12 Long stop (you know why…) – minor rerouting of return pipes First switch on after installation: efficiency = 87% DSF status (tests pre-installation): efficiency = 100% Restart after long stop: efficiency = 71%

+ 13 Stable after interventions: efficiency = 83% Interventions in fall 2009 Last resume after tech stop: efficiency = 64% Efficiency history

+ Flow/power correlation Slowly decreasing trend of flow The flow doesn’t tell the whole story – stable # of modules must depend on local thermodynamical conditions (not monitored) 14 total power total flow number of hs ready Aug 2010 Aug 2011

+ Looking for the ‘’unsub’’ Pressure increase line by line Check if performance can be recovered by increasing the flow The flow is enhanced by the pressure increase Lines swapping Could be something related to the lines’ path/conditions Some dependence is found – replaced lines with symmetric and shorter path Lines insulation Heating up the fluid can cause early bubbling Impossible to insulate the lines – too much surface w.r.t. the volume SEM analysis of ‘first-stage’ filters Clogging material in the lines? Keystone test…see later ‘’Ice age’’ test Further subcooling to avoid early evaporation: 8 m of pipe in a bucket filled with ice (thanks Restaurant #1) in PP4 (~6 m before the detector) Two lines tested, flow increased, 6-7 hs/sector recovered, in one line +50% of flow 15

+ Pressure correlations Sector #0 (‘good’) Observed behaviors: 1.“Good” sectors have a higher pressure drop 2.“Bad” sectors are more “sensitive” to pressure changes … Observed behaviors: 1.“Good” sectors have a higher pressure drop 2.“Bad” sectors are more “sensitive” to pressure changes … bad guys Principle: look at the correlation (slope) between the pressure set at the plant and the pressure close to the detector Test done in 2009 Principle: look at the correlation (slope) between the pressure set at the plant and the pressure close to the detector Test done in 2009 PLANT SPD liquid gas PP 16

+ SEM analysis 17 Analysis of a filter taken from PP4, in place for 1 year approx. Results and conclusions: “In the used filters several exogenous fragments were located clogging the filter. There were several fragments containing different composition elements. In addition to elements from the Stainless steel, the following traces of elements were found: O, Al, K, C, Sn, Cu, P, Ca, Cu, Na, Cl and Zn.” Possible origin of the fragments: pumps (graphite) hydrofilter (aluminium oxide) weldings (TIG weldings remnants) NB lines: electrocleaned s.s. pipes (Sandvik), flushed after installation with liquid freon clean filter 20 μ m

+ The picture Some pollution went into the lines It had to go through oxysorb/hydrofilter of the plant (1 μ m filter was installed after 1 year run) and/or It had to go through the first 60 μ m inline filter and deposit (and partly go through) the second inline filter The second clogged filter cannot be replaced (have to disassembly the experiment) and causes: less flow pressure drop The liquid heats up to room temperature along the path to the detector (~40 meters) – this was not a problem, if alone The combination of the last two causes: less flow in the single line  worse performance in the sector bubbling before the capillaries  local and occasional loss of performance 18

+ ‘’Upgrades’’ 1.Installation of a 1 μ m at the plant (in 2008) 2.Installation of new liquid-side pipes dedicated path of new lines, more straight (less elbows), shorter inox SS316L, 6/4 o/i diameter (same as before) no insulation (useless) 3.Additional heat exchangers to cool the fluid close to the detector 10 HX’s (one per line), redundat exchange factor (more than 5 times) use leakless system with water cooled down at 7.5 °C 4.Flushing each line counter-flow wise drain particles clogging the filters outside the line redundant protection against overpressure: 2 safety valves (mechanical) + pressure switch (electronic) 2 filters, stainless steel, 1 μ m grid, on the “washing machine” 1 to 4 days washing cycle per each sector 19

+ Optimization of consumption From the lab to ‘real life’: Three main parameters to tune: thresholds charge-preamplifier current reference I-V 20 Typical distribution during run nominal power/stave nominal power/stave › power consumption  reduced by cutting charge- preamplifier current: efficiency is conserved, a couple of “compromises” at low current

+ Thermal contact Could thermal contact be another issue? Performed with AOS thermal grease real K measured (slightly less than promised) mechanical stress tested Long term performance? Thermal/mechanical stress? It is a minor issue (by now): good sectors do not show a worse performance 21

+ ‘’What are you doing/planning?’’ Essential for any intervention of this kind: first, try in the lab! We build a test bench to reproduce the issue and test any possible of solution We have a spare sector for most critical tests and two dummies (same hydraulics but fake detectors) to ‘’play’’ with. Be open-minded: solution can come from whatever technology …e.g. ultrasounds… or drill… 22

+ Evidences from the test bench A test bench has been installed in DSF same fluid and pressure/flow conditions as in the system installed in ALICE plant build by EN/CV/DC, test section by INFN-Padova + CERN Two lines feed a dummy sector (same hydraulics as real detector, dummy heat load) and a test hydraulics Thermal bath and real pipe length (~40 m) to reproduce different liquid input conditions Many pressure/temperature pick-up points and transparent pipe sections for visual inspection 23 Loss of flow-rate due to filter clogging Local inefficiencies due to impedance non-perfect equalization Bubbling in the pipe section before the detector caused by a combination of pressure drop (due to filter clogging) and heating of the fluid (thermal contact with environment and slow translation)

+ Plant + dummy 24

+ Ultrasounds ‘’+wire’’ solution Generate the ultrasounds close to the filter with piezoceramics: tubes with size 6×2.2x1.0 (LxODxID), transversal oscillation, ν R ~3.8 MHz Material is PIC 181, a modified lead zirconate lead titanate Complementary with mechanical tapping of the filter by a stainless steel twisted wire (‘’bike’s brake wire’’) 25

+ Ultrasounds ‘’+wire’’ application 26 cleaning machine TO PP1 pulser amplificator Likely to operate the following way: fill the pipe with C 6 F 14 by the cleaning machine flow C 6 F 14 in the line while tapping the filters with a 5 m long stainless steel wire flow C 6 F 14 and power the ‘’piezo’’ wait time X (determined during tests) clean the line from C 6 F 14 and restart the cooling

+ ‘’What have you learned from this (hard) lesson?’’ I’m not going to do it again In hindsight, it’s easy to blame some choices, but at that very moment: safety of the detector is the priority – had to protect it from accidental pollution time was tight, no chance to perform many tests, nor to modify the design the system was designed robust enough to cool down more than two detectors like ours… Biphase systems are much more sensitive than expected thermodynamical conditions have to be under control wherever in your system Going from a clean room to the cavern wasn’t just a translation… same object in a different place…is a different object! 27

+ ‘’What would you do different if you had to do it again?’’ I’m not going to do it again Schedule shrinking was an issue – but what kind? A cooling system is (can be?) a tricky game – need to treat it like a detector (disclaimer: personal comment, not endorsed blah, blah…) manpower and coordination have to be at the same level of complexity of the detector – no excuses Technical issues are secondary to the previous – while not negligible more long-term tests needed ? accessibility ? 28

+ Thanks for the attention! 29

+ Backups 30

+ Test bench scheme 31

32

33

+ (2) Target point The pipe is in yellow The access point (1) is ~4.5 m away from the target point (2). The pipe is not fixed but laying in the aluminium box (below the yellow pipe in the exploded view) The pipe will be filled with liquid (C 6 F 14 ) or flushed at low pressure (0.5 bar) with the same liquid (1) Access point Layout of the circuit 34

+ ‘Ice age’ test We installed an ‘intercooler’ on the freon line in PP4 (close to SPD) 8 m of plastic pipe in a bucket filled with ice (many thanks to CERN Restaurant #1!) freon reached ~8 °C in PP4 Test done on 2 sectors (#6 and #5) Observed: increase of flow in one case ( ∼ 50%) clear improvement of performance in both cases 6/7 half-staves recovered ! 35

+ Measurement of flow Very low flow rate in sectors 7 and 9; Reynold’s number vs. pressure

Pipes New routing (Symmetric inlet) View from A side (front) side ‘I’ side ‘O’ 5HX5HX 10 New pipes ~ 10 ˚C ~ 20 ˚C ~ 10 ˚C 5 pipes Flow ~ 16 g/s 37 5HX5HX