Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.

Slides:



Advertisements
Similar presentations
16 October th International Workshop on Laser Ranging 1 Implementing the Consolidated laser Ranging Data (CRD) Format throughout the ILRS Network.
Advertisements

Aquarius Status Salinity Retrieval and Applications D. M. Le Vine NASA/GSFC, Greenbelt, MD E. P. Dinnat, G. Lagerloef, P. de Matthaeis, H. Kao, F.
Sea water dielectric constant, temperature and remote sensing of Sea Surface Salinity E. P. Dinnat 1,2, D. M. Le Vine 1, J. Boutin 3, X. Yin 3, 1 Cryospheric.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Aquarius/SAC-D Mission Error Validation and Early Orbit Corrections Gary Lagerloef 6 th Science Meeting; Seattle, WA, USA July 2010.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
Aquarius Command and Control System pre-CDR
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
15 Copyright © 2005, Oracle. All rights reserved. Performing Database Backups.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
John T. Gunn, AVDS Manager Earth & Space Research 1910 Fairview Ave. E., Suite 210 Seattle, WA Ph: ; 1 st Joint GOSUD/SAMOS.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
1 SpaceOps 2002 Autonomous Operations For The Swift Mission T3-47 John Ong/Swift Software Systems Manager NASA/GSFC Code 582/ Mike Rackley/Swift.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
1 of XX February 8-10, 2010 Section 09 – Aquarius Command and Control System Mission Operations Review Aquarius Instrument Operations Aquarius/SAC-D Mission.
MOWG 2 Sept 15-16,1999 David Hancock1 KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member.
Patrick Coronado - DRL. Driving Force Behind DRL Technology Development Utility and transportability of Earth science data Modularity, scalability, portability.
2015 GLM Annual Science Team Meeting: Cal/Val Tools Developers Forum 9-11 September, 2015 DATA MANAGEMENT For GLM Cal/Val Activities Helen Conover Information.
3/30/04 16:14 1 Lessons Learned CERES Data Management Presented to GIST 21 “If the 3 laws of climate are calibrate, calibrate, calibrate, then the 3 laws.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
22 March 2007 Science Simulator Overview and Status ICDS Susie Kennison.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
2014 Aquarius / SACD Science Team Meeting Agenda and Objectives Summarize the completion of NASA’s Aquarius 3-year prime salinity measurement mission (November.
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
August 2003 At A Glance The IRC is a platform independent, extensible, and adaptive framework that provides robust, interactive, and distributed control.
National Aeronautics and Space Administration Aquarius Validation Data System Overview and Status Algorithm Workshop March 21-22, 2007 John Gunn Earth.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
LANCE Processing at the AMSR-E SIPS Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
Aquarius Simulation Studies Gary Lagerloef Aquarius Principal Investigator Algorithm Workshop 9-11 March 2010.
ADPS Science Software Development Bryan Franz NASA Ocean Biology Processing Group Aquarius Data Processing Workshop, NASA/GSFC, March 2007.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Aquarius Algorithm Workshop March 9-11, 2010 Santa Rosa, CA Aquarius Data Processing System (ADPS) Overview and Status Fred Patt.
Aquarius Level 0-to-1A Processing Rule #1: save everything from the Level 0 data. Rule #2: never forget Rule #1! The objective is to ensure that the Level.
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
Mission Operations Review 08 – 10 February 2009 Falda del Carmen, Córdoba, ARGENTINA SECTION 16 Aquarius Launch and Commissioning Operations Ron Boain,
Mission Operations Review February 08-10, 2010 Falda del Carmen, Córdoba, ARGENTINA DAY 2 SECTION 08 Aquarius Data Processing System (ADPS) Gene Carl Feldman.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Transition of Science Algorithms into Enterprise Product Generation Operations 2016 AMS Annual Meeting Dylan Powell, Ph.D. Lockheed Martin ESPDS Science.
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
I&T&C Organization Chart
GLAST Large Area Telescope:
MODIS SST Processing and Support for GHRSST at OBPG
GSICS Data Management and Availability to Users
Launch and On-orbit Checkout
Integration & Test Instrument Operations Coordination
Presentation transcript:

Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012

Aquarius Daily Sea Surface Salinity

Mean composite global image of Aquarius salinity measurements averaged from all data, 25 Aug – 6 April Aquarius Mission-long Sea Surface Salinity 25 August 2011 – 6 April 2012

Aquarius Project Status AQ project management transferred to GSFC for Phase E operations on Dec 1, 2011 after a successful NASA Aquarius PLAR and with centers/program/HQ concurrence. –GSFC assumed full project management and fiscal responsibility –GSFC operates the Aquarius Ground System and provides radiometer and Deputy P.I. support –JPL maintains roles in science team, instrument engineering support, and official NASA science data archive/access throughout Phase E –JPL to complete remaining Phase D activities including support of SAC-D PLAR –SAC-D PLAR is planned for May 15, 2012 AQ flight and ground systems all nominal; AQ science cal/val team has made great progress since first light and V1.3 data products are now in the operational forward stream and viewable online at:

Aquarius Ground System Interfaces CONAE DataMission RF Archive Operations Services Command Center Aquarius Command Schedules And Reports S-Band X-Band Wallops Svalbard Alaska McMurdo NASA Ground Network Science Team and Algorithm Providers S-Band Algorithms & Science Code Evaluation Products Ancillary Data Sources Commands Real-Time Telemetry & Coordination Schedule Confirmation And Reports AVDS Aquarius Validation Data System PO.DAAC Level 0, 1, 2, 3 Aquarius Data Documentation & Software Data Users and Science Team Aquarius L1, 2, 3 Data Ancillary Data Feedback SeaDAS Software X-Band ASI Matera Cordoba Principal Investigator and Science Planning Team Calibration & Instrument Configuration Change Requests Instrument Engineering Team Aquarius Instrument Test bed Flight Software Updates ASI Malindi 1- SAC-D Ground System to Aquarius Ground System ICD 2- SAC-D / NASA PSLA, Network Requirements Document & Scheduling Interface 3- SD - Observatory Ground IF Specification Document 4- Aquarius Science Team to Aquarius Ground System ICD 5- AQ - Aquarius Ground System – Aquarius Instrument Team Anomaly ICD and Aquarius Test bed User Manual 6- Aquarius Data Product User Guide (PO.DAAC) & Format Specification (ADPS) 7- Ocean Data Processing System Data and Software Management Plan, ATBD’s and Software User’s Guides 8- A V D S to A D P S ICD 9- Aquarius Ground System to PO.DAAC ICD Insitu Data Bias Adjustments Aquarius Match-up Data Aquarius Data, SAC-D Telemetry and Orbit Products CUSS CODS Anomaly Reports Recovery Procedure and Timelines ADPS ACCS Aquarius Data Command & Processing Control System

The Aquarius Ground System at NASA/GSFC consists of: Aquarius Data Processing System (ADPS) and the Aquarius Command and Control System (ACCS) The ADPS supports the: – Acquisition and ingest of Aquarius/SAC-D data from CONAE. – Acquisition of dynamic ancillary required to support the science processing. – Processing of Aquarius data to standard and evaluation product levels using algorithms provided by the Science Team. – Quality control of data products using methods specified by the Science Team. – Match-up of Aquarius data with in situ salinity measurements and provide to AVDS. – Archive and distribution of all data products during the active life of the mission. – Delivery of ALL Aquarius data products to the PO.DAAC regardless of validation status. Aquarius Ground System Responsibilities 1/2

The ACCS supports: Aquarius Routine Command Planning - Science Data X-band Downlinks - Schedule Cold Sky Calibrations Aquarius Offline State-of-health Analysis - Receipt of Aquarius/SAC-D science and housekeeping data from the ADPS. - Receipt of Aquarius/SAC-D pass prediction files, acquired by the ADPS from CONAE. - Processing of Aquarius/SAC-D housekeeping and Aquarius science data for the purpose of monitoring instrument trends and state-of-health. -Publishing of telemetry trends and alarms to Web-based tools to enable off-site health checks. Anomaly Detection and Notification - Support Aquarius Instrument Operations Team in anomaly resolution Both the ADPS and ACCS are be supported within the existing infrastructure of the GSFC Ocean Biology Processing Group (OBPG). Aquarius Ground System Responsibilities 2/2

Summary I would like to express my thanks to all of our colleagues from CONAE for their dedication, incredibly hard work and long hours, technical skills and most importantly, for being the most incredible team mates that I have ever had the privilege of working with. Con todo mi corazón, gracias