Product Manager Clothing Individual Equipment Personnel Airdrop Systems Team Takis Blanas Clothing and Individual Equipment www.peosoldier.army.mil 12.

Slides:



Advertisements
Similar presentations
Formulation, planning, budget information provided by Department of Planning & Evaluation Analysis and Preparation of Funding Resolution Approval of the.
Advertisements

PM Soldier and Individual Equipment (PM SCIE) Personnel Airdrop Team
Jim Rezich A&P, I.A. ATP DAR Introduction to Ejection Seat ownership.
VistA Imaging Modernazation Project December 11, 2007 Project Overview.
1 Case Title: Training for Contractor Personnel Interacting with Detainees (DFARS Case 2005-D007)  Type:Final Rule Published 9/8/06 -Received one response.
Cargo Airdrop Overview Parachute Industry Association Meeting
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Product Manager Clothing and Individual Equipment Personnel Airdrop Overview Parachute Industry Association 25 August 2006 MAJ Shawn Lucas APM, Personnel.
Dean Cox Naval Undersea Warfare Center, Keyport Capability maturity model integration CMMI FOR Washington state university 16 September 2009.
End User Training Materials
Product Manager Clothing and Individual Equipment Update 18 October 2007 LTC John Lemondes Product Manager Clothing and Individual Equipment
“SERVING SOLDIERS WHERE SOLDIERS SERVE”
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Transforming Army Management of Individual Chemical Protective Equipment Mobility Inventory Control and Accountability System Used in Individual Protective.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Technical Security VTC 15 December 2010
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Product Manager Clothing Individual Equipment Personnel Airdrop Systems Team Takis Blanas APM PM CIE Personnel Airdrop Systems
The Soldier: America’s Most Deployed Combat System Product Manager Clothing and Individual Equipment Industrial Base Liaison Overview Brief 23 March 2006.
Product Manager Clothing Individual Equipment Personnel Airdrop Systems Team PROGRAM STATUS UPDATE TO PIA February 2008 The Soldier: America’s Most Deployed.
UNITED NATIONS STAND-BY ARRANGEMENTS SYSTEM (UNSAS)
Montgomery County, Maryland DTS CMMI Approach & Implementation Mike Knuppel 03/20/2006.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
1 Doc # USAMC LOGSA--Supporting Warfighters Globally U.S. Army MaterielCommand US AMC LOGSA Parts Management Plan Builder 29 April 2008.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
Product Manager Clothing Individual Equipment Personnel Airdrop Overview APBI MAY 2007 The Soldier: America’s Most Deployed Combat System MAJ TJ.
2003 USSOCOM SOF CBRN CONFERENCE DECONTAMINATION UPDATE
POC: ESO, (703) (DSN: 221) 1 Evaluation Systems Office Evaluation Timeliness Report As of: 13 Feb 2007 Purpose: Let S1 and senior raters know.
Life Cycle Logistics.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
1 Amy Williams, Senior Procurement Analyst March 25, 2008 Defense Acquisition Regulations System
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
1 United States Joint Forces Command United States Joint Forces Command Joint Concept Development and Experimentation (JCD&E) Interagency and Multinational.
Accident Investigation SGRP CD Slide # Meeting 1 Northern Ontario Safety Group.
Army Physical Fitness Uniform (APFU) Update
Expense School/ Unit Representative Group Meeting
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
Life Cycle Logistics.
Parts Management Plan Builder 26 July 07
ISA 201 Intermediate Information Systems Acquisition
Program Shutdown Update
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
Test and Evaluation Considerations
41st Annual Targets, UAVs & Range Operations Symposium & Exhibition
2018 Safety Group 1 – 5 Year Program Timeline Guide
Mission Command Center Excellence Directorate of Training
Mission Command Center Excellence Directorate of Training
2017 Safety Group 1 – 5 Year Program Timeline Guide
Office of Emergency Communications
Mission Command Digital Master Gunner Course (MCDMG)
Yearly Maintenance Process (for existing messages)
ctclink Steering Committee
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
2019 Safety Group 1 – 5 Year Program Timeline Guide
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
Ctclink executive leadership committee May 31, 2018
2016 Safety Group 1 – 5 Year Program Timeline Guide
Type: Final Rule Published 9/8/06
Executive Project Kickoff
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Mr. Chris Reynolds: BPS & Mentorship
Presentation transcript:

Product Manager Clothing Individual Equipment Personnel Airdrop Systems Team Takis Blanas Clothing and Individual Equipment 12 September 2008 PROGRAM STATUS UPDATE TO PIA

Agenda  Purpose  Acquisition Process  Advanced Tactical Parachute System  Berry Amendment Issue  Military Free Fall Products  QA for Personnel Airdrop Items

Purpose To provide members of the PIA an update on the status of PM CIE Personnel Airdrop Team’s product development efforts

 Requirements are developed by proponent  PM-CIE receives requirements and initiates programs  Acquisition strategy is developed based upon: -Requirements -Technology maturity -Life Cycle Costs and Joint Interoperability  Requirements are addressed through: -Modified Commercial-Off-The-Shelf (COTS) products -Developmental programs -Technology Insertion/Product Upgrades Acquisition Process

T-11 Operational Testing  Feb – Oct 08 at Ft. Bragg, NC  3,289 total Jumps will be conducted during OT to meet the required reliability of.9993 at 90% confidence -2,241 OT jumps completed to date (956 with combat equipment) -Currently at.9990 at 90% confidence  One 3-ship C-17 mission successfully completed -No interactions or issues with C-17 Vortices -Results from model show lower C-17 Wing Vortex encounter rate than T-10 -Completes C-17 multi-ship testing  Two Multi-ship C-130 missions successfully completed  High Altitude jumps completed

T-11 Demonstrated Reliability 3289 JUMPS TO DATE

T-11 Acquisition  LRIP: Approved 8 JUL 08 -LRIP option in current T-11 contract exercised on 18 JUL 08 for 5,200 systems -LRIP systems will be used for initial fielding  FRP Decision: 2QFY09 -Contingent upon successful OT completion and supporting documentation - OT Report, Safety Confirmation (DTC), and Safety Evaluation Report (AEC)  Fielding -FUE: 3QFY09  3 BTN 75 th RGR RGT - Fort Benning, GA -PM-SEQ NET Team trained and ready to support

T-11 QPL Process  Quality Products List (QPL) -Sources Sought Synopsis updated Jul 08  TDP Update to interested offerors sent on 4 Apr 08 -Interested manufacturers must request TDP and sign NDAs -Manufacturers submit sample on their own initiative  Approved MC-6 contractors need only submit T-11 Main Assembly  Acceptance based upon contractors’ written proposal and approval of QPL sample  First come, first served for evaluation -QPL to support forecasted contract award in Apr 09  Pre-Production Review -First session held in Feb 07 -Second session held in Jun 08

 MC-6 Fielding  Fielding to resume in 2QFY09 - Depends on resolution of Berry Amendment Issue  MC-6 MWO  MWO Instructions have been published by TACOM  MWO application initiated at Ft. Lewis  Delivery of MWO kits on time to support schedule  MWO on track to be completed by DEC 08 MC-6 Acquisition

Berry Amendment Issue  25 JUL – Primes notify the Sec Army and request Domestic Non-Availability Determination for anti- inversion netting  18 AUG – PM begins staffing DNAD packet and submits impact statement  25 AUG – Initial packet endorsed by NSC members and sent to Belvoir for staffing  4 SEP – Packet at PEO Soldier for review  5 SEP – Packet sent to PARC Aberdeen for review & concurrence

 12 SEP - Domestic Non-Availability Determination (DNAD) packet awaiting PEO signature  ?? SEP – DNAD will be sent to Secretary of the Army for approval; expect signature w/i 5 working days  DNAD will be posted to FedBizOps for 7 days after approval  Gov’t & Primes to begin negotiations for considerations after approval  DNAD will expire JAN 2010 Berry Amendment Issue

T-11FY08FY09FY10FY11FY12FY13FY14FY15 Milestones1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q DT OT LRIP FRP Decision Contract Awd ATPS Fielding MC-6FY08FY09FY010FY11FY12FY13FY14FY15 Milestones1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q ECP/Contract Mod MWO Implementation MC-6 Fielding ATPS Timeline

 System Requirements -Commercial Off The Shelf system -Provide increased jumper exit weight up to 450Lbs -Static Line and MFF capable -Reduced opening shock at exit altitude -EAAD compatible using 1500ft model -Fully adjustable Harness fits the 5 to 95 th percentile  Program initiated MAY 08  Synopsis published AUG 08 MFF Advanced Ram Air Parachute System (ARAPS)

Electronic Automatic Activation Device (EAAD)  Fielded EAADs 1100 systems  Modification at DDPS continues for fielded systems and Depot assets to include Class IX  Full Operational Capability Mar 09

Parachutist Oxygen Mask (POM) The POM will: Replace current MBU-12P mask Provide the MFF parachutist with a safer, more dependable method of receiving supplemental oxygen up to 35,000-ft Use a low profile mask with replaceable regulator side-mounted hose with quick disconnect fittings Be compatible with ASFS and PHAOS legacy bailout bottles & consoles Developmental Testing  Started 29 May 08; test was stopped due to jumper illness.  Ensuing investigation and testing (Altitude chamber to 35K-ft, Vertical Wind tunnel, live jump testing) of affected masks showed no evidence that masks were responsible.  DT re-start 8-19 Sep 08 Operational Testing  OTRR II conducted  Scheduled to start 27 Oct 08 and continue through Jan 09 MS C Apr 08 FUE 1Q10

Military Freefall Navigation Aid (NAVAID)  System Description/Requirements  GPS-based Navigation System  Options include both Helmet and Chest mounted systems  Reliable and easy to use, integrated with JPADS (Joint Precision Aerial Delivery System) for Mission Planning  Military SAASM GPS (Fielding Requirement)  Lightweight, Clear Display (Screen or Goggle- Mounted) with no interference to User  Current Program Status (September 08)  Waiting for CDD Approval - Requirements Finalization and USASOC Staffing - MS B scheduled for 3Q FY09 - Technology Assessment FY08 and 1QFY09  Test Activities - Design Validation: 1Q- 3Q FY10 - DT/OT: 3Q FY10 – 4Q FY11  FUE by 1Q FY 13

Future MFF Programs  New connector links for MFF school  Improved D-Bags for the MC-4  ACH with oxygen  Digital Altimeters  Plug and play altimeter chambers  EAAD calibration station  Increased pressure Bailout Bottles systems  High Glide Parachute  Tandem system  Small Business Research Initiatives (SBRI) -night vision enhancement, -modeling simulation for MFF -canopy flight simulator

QA for Personnel Airdrop Items  Dealing with life supporting systems  QA is an integral part of the process  Continue visits to facilities during production -ISO audits have begun -Conduct Product and Process Reviews -Require Supporting Documentation  Assist in Problem Solving -Keep lines of communication open  Bottom line: safe, Berry Compliant, quality products for the airborne Soldier

POC List Product Manager - Clothing & Individual Equipment Beach Road (Bldg 325T) Fort Belvoir, VA LTC Michael Sloane – PM CIE Comm (508) , DSN Mr. Fred Coppola – Deputy PM CIE Comm (703) , DSN Project Manager - Soldier Equipment Beach Road (Bldg 325) Fort Belvoir, VA COL John McGuiness – PM SEQ Comm (703) , DSN Mr. Al Dassonville – Deputy PM SEQ Comm (703) , DSN Mr. Takis Blanas – APM Personnel Airdrop Comm (508) , DSN Product Manager - Clothing & Individual Equipment Personnel Airdrop Team 15 Kansas St (Bldg 3, R-235) Natick, MA 01760