Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.

Slides:



Advertisements
Similar presentations
(c) 2001 Contemporary Engineering Economics 1 Chapter 15 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis.
Advertisements

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©
Chapter 9: Replacement Analysis
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Replacement.
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 7-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Engineering Economic Analysis Canadian Edition
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Chapter 11: Cash Flows & Other Topics in Capital Budgeting  2000, Prentice Hall, Inc.
Chapter 11 Replacement Decisions
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Contemporary Engineering Economics, 4 th edition, © 2007 Corporate Income Taxes Lecture No. 35 Chapter 9 Contemporary Engineering Economics Copyright ©
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
CHAPTER 9 Replacement Analysis.
Unit 3 - Cash Flow Forecasting
Contemporary Engineering Economics, 4 th edition, © 2007 Tax Treatment of Gains or Losses on Depreciable Assets Lecture No. 36 Chapter 9 Contemporary Engineering.
© 2012 by McGraw-Hill All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 11 Replacement.
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Methods of Financing Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Annual Equivalent Worth Criterion.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculations with Effective.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Design Economics Lecture No. 22 Chapter.
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
MAKING INVESTMENT DECISIONS WITH THE NET PRESENT VALUE RULE
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas (Gradient Series)
Interest Formulas for Single Cash Flows
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Corporate Income Taxes
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Copyright  2004 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 3e Ross, Thompson, Christensen, Westerfield and Jordan Slides.
Engineering Economic Analysis Canadian Edition
Cash Flows and Other Topics in Capital Budgeting
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Effects of Inflation on Project Cash Flows
Replacement Analysis Lecture No. 46 Chapter 14
Applying Annual Worth Analysis
Engineering Economy: Replacement Study
Project Cash Flow Analysis
Chapter 9: Replacement Analysis
REPLACEMENT DECISIONS
Applying Annual Worth Analysis
Presentation transcript:

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration Lecture No. 48 Chapter 14 Contemporary Engineering Economics Copyright © 2016

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration When computing the net proceeds from sale of the old asset, any gains or losses must be identified to determine the correct amount of the opportunity cost. (Example 14.6) Whenever possible, replacement decisions should be based on the cash flows after taxes. (Example 14.7) All basic replacement decision rules including the way of computing economic service life remain unchanged. (Examples 14.8 and 14.9)

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 14.6: Net Proceeds from the Disposal of an Old Machine  Given: Depreciation schedule, tax rate = 40%, and market value = $10,000  Find: Market value to be used in replacement analysis

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 14.7: Replacement Analysis Using the Opportunity Cost Approach  Given: o Depreciation schedule o Tax rate = 40% o Discount rate = 10% o All other financial information as given in Example 14.2  Find: Whether or not to replace the defender now AEC D = $7,524 AEC C = $6,723

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Excel Worksheet (Example 14.7) DefenderChallenger

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 14.8: Economic Service Life of a Lift Truck on After-Tax Basis  Given: Financial data as given in Example 14.3, depreciation schedule, tax rate = 40%, and discount rate = 9%  Find: Economic service life  Forecasted Operating Costs and Net Proceeds from Sale as a Function of Holding Period

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Service Life Based on After-Tax Cash Flows

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Service Life

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 14.9: Replacement Analysis under the Infinite Planning Horizon DefenderChallenger

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Summary of Economic Service Lives  Defender: o N D* = 2 years o AEC D* = $3,030  Challenger: o N C* = 5 years o AEC C* = $3,541

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalent Annual Cash Flow Streams  PW for an infinite cash flow stream when the Defender is Kept for n Years followed by Infinitely Repeated Purchases of the Challenger Every 4 Years

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Summary o In replacement analysis, the defender is an existing asset; the challenger is the best available replacement candidate. o The current market value is the value to use in preparing a defender’s economic analysis. Sunk costs—past costs that cannot be changed by any future investment decision—should not be considered in a defender’s economic analysis.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved o The opportunity cost approach views the net proceeds from sale of the defender as an opportunity cost of keeping the defender. This approach works in all situations of replacement problems. o Economic service life is the remaining useful life of a defender, or a challenger, that results in the minimum equivalent annual cost or maximum annual equivalent revenue. o We should use the respective economic service lives of the defender and the challenger when conducting a replacement analysis.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved o Ultimately, in replacement analysis, the question is not whether to replace the defender, but when to do so. o The AEC method provides a marginal basis on which to make a year-by-year decision about the best time to replace the defender. o As a general decision criterion, the PW method provides a more direct solution to a variety of replacement problems, with either an infinite or a finite planning horizon, or a technological change in a future challenger. o The role of technological change in asset improvement should be weighed in making long-term replacement plans. o Whenever possible, all replacement decisions should be based on the cash flows after taxes.