LSC General Meeting 2000.08.17LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 UWM Data Analysis Facility LSC General Meeting, August.

Slides:



Advertisements
Similar presentations
LIGO-G Z 23 October 2002NSF Review of LIGO Laboratory1 The Penn State LIGO Data Analysis Center Lee Samuel Finn Penn State.
Advertisements

LIGO- G W LIGO Update by Fred Raab Local Educators Network LIGO Hanford Observatory October 27, 2005.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO- GXXXXXX-XX-X Advanced LIGO Data & Computing Material for the breakout session NSF review of the Advanced LIGO proposal Albert Lazzarini Caltech,
Design considerations for the Indigo Data Analysis Centre. Anand Sengupta, University of Delhi Thanks to -Maria Alessandra Papa (AEI) -Stuart Anderson.
LIGO Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee LIGO-G Z SuperComputing 2003 grid-distributed wide-area.
Event 18 Dec Bruce Allen, UWM and AEI History and Status.
LIGO- G Z August 2001 LSC MeetingLIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Medusa: a LSC/UWM Data Analysis Facility.
LIGO- XXXX Oct 2001 GriPhyN All HandsLIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Medusa: a LIGO Scientific Collaboration Facility.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
PAC LIGO-G Z LIGO Scientific Collaboration -- UWM 1 University of Wisconsin-Milwaukee Proposal Bruce Allen, Patrick Brady, Jolien Creighton,
Patrick R Brady University of Wisconsin-Milwaukee
The University of Texas at San Antonio The Office of Information Technology Network Upgrade Overview.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
LIGO NSF Rev LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Upper Limits Groups: Status and Plans Alan Wiseman LSC Software.
LIGO- G Z E/O Meeting, March 1 (2002)LSC Member Institution (UT Brownsville) 1 Education & Outreach Activities of the GriPhyN & iVDGL projects.
G Z LSC Meeting 3/22/ ASIS Closeout Bruce Allen, UWM.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
LSC ASIS LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Astrophysical Source Identification and Signature.
Discussion Topics DOE Program Managers and OSG Executive Team 2 nd June 2011 Associate Executive Director Currently planning for FY12 XD XSEDE Starting.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
LIGO Z LIGO Scientific Collaboration -- UWM 1 LSC Data Analysis Alan G. Wiseman (LSC Software Coordinator) LIGO Scientific Collaboration.
LSC Meeting March 2006 LIGO-G Z 1 It’s Coming! A new DCC Document System Linda Turner Caltech.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
LIGO- GXXXXXX-XX-X GriPhyN Kickoff Meeting LSC Member Institution (UT Brownsville) 1 GriPhyN Outreach Program.
LSC at LHO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Data Analysis Summary Alan Wiseman G040xxxx-zz.
CARRUTHERS LSC 3/20/06 1 LIGO-G M The View from NSF Tom Carruthers LIGO Program Officer National Science Foundation (703)
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO-G Z 1 LSC Council Meeting Peter Saulson.
LIGO- G Z GriPhyN All-Hands Meeting LSC Member Institution (UT Brownsville) 1 GriPhyN Education and Outreach Joe Romano University of.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO-G Z LIGO at the start of continuous observation Prospects and Challenges Albert Lazzarini LIGO Scientific Collaboration Presentation at NSF.
LSC - Hanford, WA 19–22 August 2002 The View from NSF GP Funding FY 2002 NSF Funding Prospects FY 2003 Funding Opportunities for GWP Some Areas of Special.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO Plans for OSG J. Kent Blackburn LIGO Laboratory California Institute of Technology Open Science Grid Technical Meeting UCSD December 15-17, 2004.
LIGO-G M Collaboration With Virgo Gary Sanders LSC Meeting Baton Rouge March, 2001.
State of LSC Data Analysis and Software LSC Meeting LIGO Hanford Observatory November 11 th, 2003 Kent Blackburn, Stuart Anderson, Albert Lazzarini LIGO.
Scott Koranda, UWM & NCSA 14 January 2016www.griphyn.org Lightweight Data Replicator Scott Koranda University of Wisconsin-Milwaukee & National Center.
US-CMS T2 Centers US-CMS Tier 2 Report Patricia McBride Fermilab GDB Meeting August 31, 2007 Triumf - Vancouver.
LSC Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Software Coordinator Report Alan Wiseman LIGO-G Z.
LSC Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 LSC Software and Other Things Alan Wiseman University of Wisconsin.
June 15, PMG Ruth Pordes Status Report US CMS PMG July 15th Tier-1 –LCG Service Challenge 3 (SC3) –FY05 hardware delivery –UAF support Grid Services.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Detector Characterization Issues -- S2 Analysis & S3 Planning.
LIGO-G Z LSC ASIS Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Update on November 2003 grid-distributed.
LAL: Status of Unmodeled Burst Search Algorithms LIGO Scientific Collaboration Patrick R Brady University of Wisconsin – Milwaukee LIGO-G Z.
Update on GIT Funding FY 14, FY 15 and Beyond Greg Allen EPA CBPO September 30, 2015.
LIGO-G E PAC9 Meeting LIGO Laboratory at Caltech 1 The LIGO I Science Run Data & Computing Group Operations Plan 9 th Meeting of the.
LIGO-G Z1 Using Condor for Large Scale Data Analysis within the LIGO Scientific Collaboration Duncan Brown California Institute of Technology.
LSC at LLO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Report from Executive Committee Meeting Alan Wiseman G Z.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
LSC Z000.0 LSC at LHO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Software Committee Report Alan Wiseman University.
LIGO- G Z GriPhyN All-Hands Meeting LSC Member Institution (UT Brownsville) 1 Education and Outreach Activities Manuela Campanelli,
LSC at LHO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Summary of LSC Data Analysis Activities: Alan Wiseman G Z.
Summary of OSG Activities by LIGO and LSC LIGO NSF Review November 9-11, 2005 Kent Blackburn LIGO Laboratory California Institute of Technology LIGO DCC:
LSC Z000.0 LSC at LLO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 LSC Software Coordinator Report Alan Wiseman University.
Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles.
VO Experiences with Open Science Grid Storage OSG Storage Forum | Wednesday September 22, 2010 (10:30am)
10-Feb-00 CERN HepCCC Grid Initiative ATLAS meeting – 16 February 2000 Les Robertson CERN/IT.
GEO600 Data Analysis Status
NSF/ LIGO Review Rainer Weiss Cambridge, Mass October 23, 2002
Jefferson Lab Overview
ASIS Status Report Bruce Allen LSC Meeting, LHO, August 16, 2001
Vanderbilt Tier 2 Project
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Scientific Computing At Jefferson Lab
NATA Foundation Building Blocks Process
University of Wisconsin-Milwaukee
Stan Whitcomb LSC meeting Livingston 21 March 2005
Summary of LSC Data Analysis Activities: Alan Wiseman
Presentation transcript:

LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 UWM Data Analysis Facility LSC General Meeting, August 2000 Bruce Allen, Patrick Brady, Alan Wiseman University of Wisconsin - Milwaukee LIGO-G D

LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 2 History January - March 1998: built 48-node beowulf system for binary inspiral search project. Proved valuable: inspiral search code required > 100 runs to “get it right”. System useful for users outside UWM Julien Sylvestre (MIT), Matt Evans (Caltech) R. Balasubramanian (Cardiff) Olliver Wehrens (AEI) Offered a UWM MRI slot (matching funds) in December 1999 to upgrade system before LIGO-I science run. Funded by NSF: July 2000.

LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 3 MRI Development Proposal $415k (NSF) + $177k (UWM). Baseline design: 128 nodes, 10 Tbytes disk, mix of channel-bonded 100 Mb/s and 1 Gb/s networking. Part-time technician to help with assembly, routine maintenance. System designed for data analysis prototyping and development work. Will also serve as GriPhyN testbed. NOT a 24x7 reliable system. No staging of data from tape needed. Disk failure/data loss tolerated. Representative data set on disk (hours all channel data, days of reduced data, weeks of very reduced data).

LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 4 LSC Involvement In addition to UWM users, proposed to make system available to other LSC members. Support 9 LSC users, chosen 3 times/year by committee: Allen, Brady, LIGO Lab director, LSC spokesman, software coordinator In early January (~2 weeks before submittal) proposal sent to LIGO Lab Director and LSC Spokesman for comments They wrote a letter of support to the NSF Asked that a committee should review final design before purchasing/procurement phase

LSC General Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 5 Design/Procurement Plan Proposal contains a complete baseline design, with detailed costing and quotes. Remainder 2000: benchmark and prototype different CPU, networking and disk options. Make final design Early 2001: assemble small committee of experts to review final design, and make recommendations about any remaining technical questions before purchasing. Committee: LSC members, plus an experienced beowulf expert from “outside” Purchase orders issued: early 2001; system assembly and commissioning: spring 2001.