TYNDP 2013-2022 SJWS #1 Infrastructure Projects -- Supply & Demand TYNDP 2013-2022 -- 1 st SJWS 24 January 2012 ENTSOG offices -- Brussels.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Market Integration & SoS Updated proposals for SJWS #6 ENTSOG offices – Brussels Stakeholder Joint Working Session – 26 April 2012.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, November 2008.
XVI European Electricity Regulatory Forum, Florence, June 2009 Tahir Kapetanovic (E-Control) ERGEG Security of Supply: System Adequacy Forecast &
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
TYNDP concept SJWS #7 – conclusion on TYNDP concept TYNDP Stakeholder Joint Working Session – 29 May 2012.
TYNDP SJWS #5 Demand & Supply – Infrastructure Projects TYNDP – 5 th SJWS 20 April 2012 ENTSOG offices -- Brussels.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Cost-Benefit Analysis Economic Performance Indicators TYNDP/CBA SJWS 6 – 13 May 2014.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
European Developments Transmission Workgroup 1 st December 2011.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
International Association of Oil and Gas Producers Europe’s Indigenous Oil and Gas Production GSE Workshop Brussels – 24th May 2007.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
How the PCIs are developed Céline Heidrecheid System Development Business Area Manager TYNDP perspective on project progress Copenhagen – 24 June 2016.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
South Region Second Edition
40th IG meeting 29th November 2016
Gas Regional Investment Plans
Gas Regional Initiative
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
40th IG meeting 29th November 2016
Monitoring of the 3rd PCI list in view of the PCI selection
The establishment of the 2nd list of Projects of common interest
Projects of Common Interest
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Projects of Common Interest
Presentation transcript:

TYNDP SJWS #1 Infrastructure Projects -- Supply & Demand TYNDP st SJWS 24 January 2012 ENTSOG offices -- Brussels

SJWS concept applied to TYNDP Get a better understanding of stakeholders’ expectation > Overall targets of TYNDP provided by Regulation Supply adequacy assessment Investment gap identification Identification of barriers to investments closing the gap > Methodology needs to be enhanced according to stakeholders’ feedback in order to meet their expectations in the most appropriate way Ensure access to knowledge beyond TSOs’ remit > As TYNDP scope exceeds demand and transmission capacity direct input from other stakeholders are required to face TYNDP target > Accuracy of the final report always reflects the lowest quality input, this implies that methodological improvements can be implemented only if the related data are provided to ENTSOG 2

SJWS process Build robust common understanding > TYNDP is a thick report encompassing many topics making it difficult for non specialist to extract the entire added-value > Continuous interaction with stakeholders during the process is key to ensure a good readability, involvement process thus needs to be further improved > First part of the SJWS is to ensure a common understanding of previous report and received feedback Analyze ENTSOG initial proposals > Once common understanding will be reached, ENTSOG will release an initial proposal for each topic to be discussed with stakeholders Final definition of methodology and inputs > Based on the information and expectations coming from the SJWS, ENTSOG will define the methodology and data to be used in TYNDP > Conclusions will be presented during June WS for final feedback prior to drafting process 3

Infrastructure projects - General TYNDP scope > Current report covers: All types of infrastructures: transmission, LNG and UGS Both TSOs and third-parties’ projects (regulated or not) > To be included, project information had to be submitted through a standard questionnaire (following a public call for information) Public call rationale > As project inclusion in TYNDP is a sensitive issue (that could increase with EIP), transparency and non-discrimination standards are of the highest importance > Standard compliance are key when collecting data on a voluntary basis Project clustering for modelling 4 > Regarding the wide range of projects included in TYNDP and the difference in investment process within Europe (see EIP discussion), FID is perceived by ENTSOG and many stakeholders as the most relevant, transparent and non- discriminatory criteria for clustering

Infrastructure projects - What is in the TYNDP Annex A > Most comprehensive and detailed list of gas infrastructure projects across Europe > Reference document built on project sponsors’ questionnaires Main report: gap and remedy identification > Under each of the 67 simulations, gaps have been identified if the country remaining flexibility was below 5% (or 1% in case of a disruption) > If a project being part of Annex A mitigates the gap, it will be mentioned along with the gap (most of the time more than one project reduced the gap) Annex E > As either all FID or all FID plus non-FID projects have been clustered (including competing ones), the modeled load factor of projects in each scenario is lower than the one that could result having less projects coming on stream > Nevertheless load factor of each individual project may be estimated using the remaining flexibility provided for projects in Annex E for most scenarios 5

Submitted projects per category 6 PipesFIDNon-FID Projects6297 UGSFIDNon-FID Projects2622 LNGFIDNon-FID Projects1120 TotalFIDNon-FID Projects99139

Infrastructure project questionnaire 7 Nearly the same questionnaire for TSOs’ and 3rd Parties’ projects

Information provided within the report 8 Ukrainian disruption (additional investment gaps to the Reference Case) BG<1%Reg. Cong. Global improvement due to AT & SK > HU <1% HR<1%Reg. Cong.<1% FY<1%Reg. Cong.<1% GR<1%BG & TK > GR<1% HU<1%AT & SK > HU<1% RO<1%Reg. Cong.<1% RS<1%Reg. Cong.<1% Total High Daily demand for the region defined by all above countries is covered by 70% with existing infrastructure plus FID and by 75% with addition of non-FID projects. Individual country’s supply demand balance cannot be assessed in this TYNDP due to the current lack of criteria. With non-FID projects (AT to HU capacity increase) remaining flexibility for Austria is inferior to one per cent but still enable to cover the whole demand. Numerical information within main body and non-FID project load factor within Annex E

Infrastructure projects - Feedback 9 Data collection & processing > Collecting process to be improved in order to ease submission by project sponsors > Cost estimation should be provided on a voluntary basis > Cost information should remain aggregated at report level > Only the information needed for modelling purpose should be mandatory > ENTSOG should have published detailed cost estimation as provided by project sponsors > More promotion in order to have more projects committed > Monitoring chapter on project progress should be added > Explanation of differences between nTYNDP and GRIPs > Interaction between TYNDP and PCI process should be explored Project clustering > FID is a relevant and objective criteria and any additional one should be easily verifiable > Additional status could be “under construction”, “agreed but non-FID” Existing infrastructures > More detailed information should be provided

Demand - General TYNDP scope > Current report covers: Demand scenario coming from TSOs (best estimates) An Average Daily Demand A High Daily Demand (1-in-20 in most countries) Annual demand scenarios coming from Eurogas, IEA and Primes An Average Daily Demand > Only TSOs and Primes scenarios provide data on a country basis Methodology rationales > TSOs scenario has been factored in network modelling under both Average Daily Demand (proxy for yearly demand) and High Daily Demand 10 > As demand is used in modelling for gap identification, daily figures for each country were required

Demand – What is in the TYNDP Annex C > Quantitative analysis and comparison of demand scenarios at European (and national level when possible) Main report: overall supply adequacy to demand > Comparison of TSOs demand scenario (yearly/average day picture) with potential supply at European level > High Daily Demand comparison requires modelling as investment gaps could prevent available supply to move to demand centres Resilience test > Security of Supply resilience has been assessed under High Daily Demand as being the most stressful in case of disruption or low UGS deliverability > Market integration resilience has been assessed under Average Daily Demand as competition is measured under business-as-usual conditions 11

Demand - Feedback 12 Climatic criteria and alternatives > Seasonal scenarios are more meaningful than yearly ones > Additional top-down scenarios considering macro-economic indicators (population, GDP) the implementation of environmental and energy policy and alternative fuel mixes > Impact of intermittent renewable power generation on gas demand > Inclusion of third-countries as Norway and Turkey > Higher transparency on the (individual) TSO’s underlying assumptions > Consistent TSOs’ underlying assumptions Comparative approach with other outlooks > Coordination with ENTSO-E needs to be ensured > Other outlooks could be also used in the modelled scenarios > Analysis would have to be developed in order to check the consistency with renewable energy on a country-specific basis

Supply - General TYNDP scope > Supply sources included in TYNDP were: Algeria (pipe) & Libya (pipe) from McDermott study for Commission LNG (all sources together) from a GLE study National Production from TSOs Norway and Russia from national Ministries > Gathered information was potential supply on a yearly basis Methodology rationales > For each demand case (Average and High Daily) a supply case has to be defined to build a Reference Case > In every resilience test scenario, supply has been kept as close as possible to the Reference Case while minimizing potential demand curtailment or investment gap and staying within the supply potential range of each source 13 > Supply mix in Reference Case is then used only to produce a reasonable scenario but has no influence on gap identification

Supply – What is in the TYNDP Annex C > Comparison of yearly potential supply for every source Supply under Average Daily Demand > National production is set at maximum possible level > 2011 import shares are based on 2008 and 2009 average (BP Review) > Starting in 2012, import shares are increased according to net demand (national demand less national production) until they reach their maximum potential > In such case missing quantity is replaced by other sources Supply under High Daily Demand > National production is set at maximum possible level > 2011 import (except LNG) are based on 2008 and 2009 daily maximum flows > Peak factor for 2011 has been defined for each import (except LNG) as the ratio between the share on the average day and the one of the High Daily Demand day > Starting in 2012, such ratios have been applied for every source average share > UGS and LNG have been used as last resort supply to balance the demand 14

Supply - Feedback 15 General consideration on supply approach > Consideration of supply limitation makes scenarios more realistic > Ministerial sources could be too optimistic > Non-conventional gas should be considered > Dialogue with producers should be maintained and enhanced > Consideration of ramp-up phases > Focus should be on existing (contracted) supply and ones associated with committed projects Supply modelling > A 10 to 15-year average could be more relevant than 2008 & 2009 when defining supply shares for the Reference Case > Methodology to define Reference Case supply is appropriate > The arrival of a new supply source should reduce the shares of the existing ones > Supply contractual constraints should be factored in the scenarios > More supply scenarios should be investigated

Average daily supply share – Reference Case 16 GWh/d Demand National Production Potential Actual share Net Demand (+36%)1200 (+26%) Supply APotential Actual share / 646 Supply BPotential Actual share / 461 Supply C (hypothetic) Potential000 / 100 Actual share000 / 93

High daily supply share – Reference Case 17 GWh/d Demand National Production Potential Actual share Net Demand Supply AAverage Daily High Daily share Supply BAverage Daily High Daily share To be covered by UGS and LNG at same load factor GWh/dMax 2008/2009Average daily shareHigh Daily Ratio Supply A Supply B

Supply by import route 18 Load factor of import routes coming from other supply sources are not impacted by the new Route 3

19 Thank You for Your Attention ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels T: WWW: