2 nd Workshop MFG, 2003-06-10, Bucharest The current status on the Market Design of the SEE REM and the way forward.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Bosnia and Herzegovina
1 European Commission DG TREN / C: Conventional Energy The Regional Electricity Market in South East Europe: Mechanisms and Aims in Unified.
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
4 th Athens Forum Athens, June 3-4, 2004 Towards a Standard Market Design for the South- East European Electricity Market Prof. P. Capros chairman of RAE.
Position Paper Standard Market Design of the SE Europe Electricity Market 3 rd Athens Process Forum Sofia, October 2003.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Guidelines for Good Practice on Information Management and Transparency EuroPEX Comments and Suggestions Brussels, 6 th of July 2006.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
4th PRS Western Balkans Forum, Athens, June 27 Regional co-operation in the energy sector: Perspectives for the Western Balkans and the European Union.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Prof. Valeria Termini AEEGSI Commissioner CEER Vice-President CEER DSO WG co-Chair The Future Role of European DSOs 1.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Energy Agency of the Republic of Serbia
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
1 SPANISH HUB DEVELOPMENT 17 th IG meeting 2 nd November 2011.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
European Commission views on intra-day and balancing markets
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
DRAFT Discussion Paper on the Options for the Transition Phase of the ECSEE Regional Energy Market Donors meeting Vienna, 13 July 2004.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
IV Athens Forum 3-4 June 2004 Towards a GAS market in the South East Europe Fabio Tambone – Sergio Ascari WG CEER SEEER.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Energy Community Secretariat Needed Reforms in Electricity High-Level Forum on Security of Supply in Kosovo Andreas Pointvogl, Energy Community Secretariat.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Workshop for West-African Telecommunication Regulators Abuja (Nigeria), September 21-22, 2000.
2nd Mini-Forum for Central West Electricity REM
The 3rd package for the internal energy market
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Gas Transmission Europe
ERGEG GRI South South East – , Maribor
STATE ENERGY AND WATER REGULATORY COMMISSION
International Conference
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Internet Interconnection
Powering Towards Clean Energy in Europe
progress of the water reform in bulgaria
The work of European energy regulators on generation adequacy
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward

2 SEE Market Design: Brief History 2 nd Athens Process Forum in Rome: CEER presented a working paper on possible strategies for building the regional electricity market: Besides putting in place a minimum common set of basic rules, such as Regulator, TSO, unbundling, Cross-border trade, congestion management Define a Standard Market Design model for the regional market to establish a common trading and market arrangement in a wider area than a single-country. CEER argued about benefits from applying a standard market design in the early stages of the process, in terms of investment attraction, development of competition and market integration. does not meanall countries everything in common This does not mean either that all countries will have everything in common or that all national market arrangements will be the same in each country

3 SEE Market Design: Current Status All participants of the Forum accepted the view of a Standard Market Design and mandated the EC to coordinate the market design in cooperation with regulators and the consultation of the MoU signatory parties. Thus, CEER WG is working on a proposal for a Standard Market Design for SEE. This proposal will provide the Regulators input for the discussions with the EC, ETSO, UCTE, the Countries and other stakeholders on the development of the SEE REM. CEER counts on Market Facilitation Group (SEETEC) to provide valuable support on all issues related to the implementation of the Market Design: Technical work of high value: Analysis and simulation, Experience from other markets Training for improving the skills of local market participants Final decisions will be made by the signatory parties (PHLG, Ministerial etc.). The next Forum will discuss the draft design.

4 SEE Market Design: Two set of issues to harmonize First set of issues: minimum common requirements of the EC directive Independent institutions (Regulator, TSO, DSO) and unbundling Regulated third-party access Opening in terms of eligibility of customers Uniform network access, Cross Border Trade system, congestion management, transparency and interoperability Level playing field (state-aid, environment) Second set of issues (standard market design): needed for a regional common market licensing of market players balancing market mechanisms integrated wholesale markets implicit auction systems for transmission congestion uniform application of competition rules This is essential to obtain real market integration.

5 SEE Market Design: The Principles Introduce the appropriate Trading and Market Arrangements for wholesale trading, scheduling, balancing, transmission use and ancillary services in order to: Develop efficient competition in the electricity market for the benefit of SEE consumers, subject to regulation and control of institutions operating at a country level Make a transparent and liquid market and network to allow any customer to access any generator or supplier in equal terms in the whole region Assure fair and open access to all new entrants (e.g. generators, suppliers) that would directly operate in a broad integrated market (and not in a fragmented one) Finally develop a REM which will be readily incorporated in the EU Internal Market.

6 Which SEE Market Design for which Objectives? Among the different possible designs, select a market model that in particular for the SEE region will deliver the following: 1. Attract new investments, both in generation and transmission 2. Ensure smooth transition for the customers, the existing business and infrastructure: Avoiding jeopardizing the viability of existing national entities (e.g. distribution companies, old capital-intensive plants) and Maximizing acceptance for the social welfare of the consumers (affordability) Avoiding recourse to market distorting mechanisms (stranded cost recovery, excessive public service obligations fees, etc.) 3. Ensure compatibility and consistency between technical operation and the functioning of new financial/commercial mechanisms 4. Ensure, in the early stages, a critical volume and liquidity for the new wholesale market places so as to develop.

7 SEE Market Design: The Approach Starting Point: Develop common market mechanisms across the region for Wholesale trading and Balancing Implementation: Allow Regional or national variation in market design to accommodate legitimate differences in local conditions, but Prevent the creation of market distortions due to regional/national variation, e.g. transportation costs Incorporate national functional institutions but set the framework for their efficient cooperation Dont focus on details but on flexible and adaptable rules Identify and retain efficient rules already existing

8 Market Participants Producers Producers: Licensed generators. Suppliers Suppliers: SEE-Wide licensed Customers Customers Tariff regimes Tariff regimes Balancing Providers Balancing Providers Transmission Providers Transmission Providers

9 Main Issues (1) 1. Single Price Zones: Geographical areas where real time electricity balancing operates rather free of serious or systematic transmission constraints Allows the formation of a single price clearing of transactions at real time within the Zone The definition is subject to agreement of the countries of the region after the thorough investigation of the technical constraints of the regional network Zones may change over time (as more transmission is built). The aim is the whole SEE region to become a Single Price Zone

10 Main Issues (2) 2. Transmission Networks: full control and responsibility National TSOs retain full control and responsibility Third Party Access to all authorized regional market participants Regional Planning Expansion and Operation coordinated between TSOs Tariff Structure according to common principles allowing long-term transmission capacity adequacy 3. Combined Bilateral Contracts / Day Ahead Provide stability and flexibility to customer categories at a national and regional level Physical Delivery On a national or zonal/regional level or a combination of both

11 Main Issues (3) 4. Balancing Regime Improve economic efficiency of the regional system Regional/ Zonal or National Market Based as long as sufficient mechanisms are in place to protect the final consumer from extremely high prices 5. Adequacy of Generation Capacity Encourage investment for generating capacity by clear recovery mechanism Through the Market Explicit Capacity Payments or tradable certificates Capacity Obligations

12 Main Issues (4) 6. Fixed – Free Tariff Regime Temporary mechanism to allow smooth transition from existing regime to liberalized market Regulated price for Fixed tariff Regime, Protect consumer categories from price variation, but Provide consumers with the choice of their own risk management 7. Hydro Power Plants Important Role for the electricity market of the region: Large capacity in the region Connected to low energy prices Specific role in balancing and ancillary services Available to all end users

13 Main Issues (5) 8. Power Exchange(s) Increase the liquidity, supplementary to the wholesale market Financial Products Hedging and Risk Management 9. Market Operation Zonal/Regional coordinated operation at least for the Day-Ahead market Harmonized Rules Monitoring 10. Institutional Issues Requires Agreement between the countries National bodies will be retained Where regional institutions are necessary, they will be created by agreement/consensus of the national bodies

14 Conclusions The CEER WG is working on an SMD for the SEE region, along the lines described above with the active participation of all Regulatory Authorities of the region The country-specific circumstances are carefully investigated, including financial, social and operational aspects of national electricity markets The work of the Donors community is highly appreciated and taken into account Ongoing developments on a Pan-European and Regional level have to be addressed (new Directives, Strategy paper, PHLG decisions etc.) The outcome of this work will be circulated to all Forum participants and the EC The aim is to reach a common decision of all participants in the next Forum