PRAGUEBRATISLAVA ENEF WG RISKS sWG WASTE STATUS REPORT January 2012 Hans Codée Brussels, 23 January 2012.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Unit of Measurement Day 1 9/23/2013 Day 2 9/24/2013 Day 3 9/25/2013 Day 4 9/26/2013 Day 5 9/27/2013 MeanMedianMode Max Temperature Precipitation Air.
Doc.: IEEE 802 EC-12/0007r0 Submission March 2012 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items March 2012 Date: Authors:
1 Progress report on Expert Groups on micro and macro household statistics WPNA meeting October 2011 Maryse FESSEAU (OECD – Statistic Directorate, National.
UNITED NATIONS Shipment Details Report – January 2006.
NIIFs Report to the NANC on Issue #0173, Toll Free Record Application Performance Guidelines by David H. Bench, NIIF Moderator.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
State of play of National Action Plans in the EU Member States and PAN Europe activities « Sick of Pesticides » Workshop Tuesday, 30 November 2010, Brussels.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
European Union Strategy for the Baltic Sea Region Flagship Project 14.3 (EUSBSR FP 14.3) Dr Christer Pursiainen Kick off meeting.
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
The Managing Authority –Keystone of the Control System
Regional Policy Cohesion Policy Legal Package State of play Porto, 29th April 2013 Vicente RODRIGUEZ SAEZ Deputy Head of Unit DG REGIO.D.1 Transnational.
Sif Johansson Marine unit, DG Environment
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
Regional Policy Draft Guidance on ex-ante conditionalities Ad hoc expert meeting 20 September
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
With LMG Secretariat LMG Forum October 2010 Christopher Croft, LMGS Rob Gillies, LMA Tim Carroll, Chaucer.
 The 2nd Ecodesign Working Plan (2012 – 2014)
Richmond House, Liverpool (1) 26 th January 2004.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
EU Developments Transmission Workgroup 3rd November 2011.
© 2012 National Heart Foundation of Australia. Slide 2.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
1 Task Force (TF) on Inter-Modal Transport Statistics (IMTS) presentation for ETIS+ Seminar 27 May 2011, Brussels Giuliano AMERINI (Eurostat)
25 seconds left…...
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
EU Developments Transmission Workgroup 6th October 2011.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
Januar MDMDFSSMDMDFSSS
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Aims Develop a methodology to study the impacts of low consequences/high probability events Apply this methodology to the implications of a 5-6 metre.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
STATUS REPORT SWG SO by PLN HAPUA MEETING WORKING GROUP 2 – TRANSMISSION SUB WORKING GROUP– SYSTEM OPERATION 6th Oct 2010, Kuala Lumpur - Malaysia.
EU Institutional Developments in the Nuclear Field Richard Ivens Senior Manager, Institutional Affairs, FORATOM BULATOM International Nuclear Forum Varna.
Common Implementation Strategy for the Water Framework Directive Planning of a Workshop CLIMATE CHANGE IMPACTS ON THE WATER CYCLE, RESOURCES AND QUALITY.
1 st Workshop on issues and trends arising from the European IRRS missions Objectives of the workshop A.Munuera Brussels, 22 nd and 23 rd January 2014.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
SPI activity ( ) – Final phase (Avril to June 2012)
GIS Technical Guidance
TG-DATA Forthcoming work
Informal document GRPE-78-23
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Current state & Prospects of implementation
Marine Environment and Water Industry Unit
Presentation transcript:

PRAGUEBRATISLAVA ENEF WG RISKS sWG WASTE STATUS REPORT January 2012 Hans Codée Brussels, 23 January 2012

Contents. Work Programme Recent Activities

Working programme Adopted WG Risk 27 September Develop guidelines for national programme (NP). Develop benchmarks for review NP. Set up task group. Workshop September 2012 (to be organised by EC). Recommendation on waste data management systems. Methodology cost estimates disposal facilities

Recent Activities. Task Group formed: NAPRO. NAPRO meetings: November January sWG meeting 24 November 2011 cancelled

Task Group NAPRO. 15 members. Waste Management Organisations: ANDRA, COVRA, ENRESA, NDA, NIROND, NNF, SKB, SOGIN. Other organisations: AREVA, CEZ, DG ENER, FORATOM, GNS,JRC Karlsruhe, TVO

Guidelines NP content. Introduction. Objectives. Programme, Policies, Framework. Quality expectations report. Structure NP. Details (art 8 and 12). List of items. Lead document

Guidelines NP. 1st draft discussed November nd draft discussed January rd draft to be discussed March End version available Bratislava meeting May Workshop September 2012 in Brussels. Final report available March 2013