Lakes Creek Road Waste Transfer Station Construction highlights
Site layout
Floor plan
Last segment of 3
Splice and ply packers
Average 29.5m
Used packers
Test pile with gauges
Vehicle mounted test rig
Rubbish in weigh bridge area excavation
Broken pile
Fan blowing into weigh bridge excavation
Site December 2013
Site January 2014
February rain rain rain
Site February 2014
Site March 2014
Site April 2014
Relieving slab
Suspended slab – office and amenities
Suspended slab – education centre
Tip bin - safety gate
Tip bin lifting
Tip bin tipping
Scabbling push pit floor
Scabble finish
Bobcat scabbler
Site May 2014
Push pit edge topping steel plate
Site June 2014
Fog system- dust suppression
Fog delivery line
20000 litre tank- fog and toilets
Push pit ready for topping
Finishing tipping floor topping
Site July 2014
Weigh bridge ready for steel floor
Grab arm control panel
Grab arm
Grab
Placing asphalt
Guard rail post installer
Site August 2014
Bio-retention drain
Site September 2014
Continuous flight auger drill rig and reo cages
Grout agitator and pump
Lifting reo cages
General view of new sewer alignment
450 sewer under by pass while new manhole and MSCL pipe are constructed
750 MSCL pipe supported on concrete beam