Heavy Photon Search experiment in Hall-B slides/ideas borrowed/stolen from talks of S. Stepanyan, J. Jaros, T. Nelson Special thanks to S. Stepanyan M.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

B. List, ETH Zürich Page 1 Report from H1: PRC Open Session, H1: Status and Prospects Benno List Institute for Particle Physics, ETH Zürich.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
1 Measurement of f D + via D +   + Sheldon Stone, Syracuse University  D o D o, D o  K -  + K-K- K+K+ ++  K-K- K+K+ “I charm you, by my once-commended.
Study of two pion channel from photoproduction on the deuteron Lewis Graham Proposal Phys 745 Class May 6, 2009.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
An Overview of the Heavy Photon Search Project John Jaros HPS Collaboration Meeting Jefferson Lab May 26, 2011.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
Dark Photons Stepan Stepanyan JLAB JLAB User GROUP Meeting May 29-31, 2013.
HPS: proposed run plan, cost and schedule Meetign at DOE, February
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
HPS – ECal Detector - TECHNICAL PARAMETERS The experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for precise momentum.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
Jornadas LIP 2008 – Pedro Ramalhete. 17 m hadron absorber vertex region 8 MWPCs 4 trigger hodoscopes toroidal magnet dipole magnet hadron absorber targets.
Draft HPS Run Plan March 30, Next Steps Beamline Setup Trigger Commissioning Beam Stability Studies SVT Commissioning Data Taking Checking the.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
HPS – ECal Detector - TECHNICAL PARAMETERS The experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for precise momentum.
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
 Motivation for the Heavy Photon (A’)  A’ Production and kinematics  HPS Experimental Setup  Simulation and Analysis Software.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
LHCb VErtex LOcator & Displaced Vertex Trigger
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Karsten Büßer Instrumentation of the Forward Region of the TESLA Detector International Europhysics Conference on High Energy Physics Aachen, July 19th.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
May 31th, 2007 LCWS C. Gatto 1 Tracking Studies in the 4 th Concept On behalf of 4th Concept Software Group D. Barbareschi V. Di Benedetto E. Cavallo.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
John Jaros for the Heavy Photon Search Collaboration Dark Interactions June 11, 2014 HPS: The Heavy Photon Search Experiment at Jefferson Laboratory John.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
HPS Budget and Schedule Marco Oriunno, June 18, 2014.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
Abstract Several models of elementary particle physics beyond the Standard Model, predict the existence of neutral particles that can decay in jets of.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
First results from SND at VEPP-2000 S. Serednyakov On behalf of SND group VIII International Workshop on e + e - Collisions from Phi to Psi, PHIPSI11,
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
A New Upper Limit for the Tau-Neutrino Magnetic Moment Reinhard Schwienhorst      ee ee
E.C. AschenauerEIC INT Program, Seattle Week 81.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Stepan Stepanyan JLAB Intensity Frontier Workshop April 2013, ANL E XPERIMENT AT JLAB.
Searching for a New State of Matter: True Muonium Sarah K. Phillips The University of New Hampshire JSA Postdoctoral Research Grant Presentation June 4,
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Conditions at a potential location of a beam dump experiment at LCLS-II Clive Field, SLAC: 4/29/16.
Jin Huang Los Alamos National Lab
How to detect protons from exclusive processes
Beam Background and the SVT Protection Collimator
A. Gasparian NC A&T State University, Greensboro, NC
Preparation of the CLAS12 First Experiment Status and Time-Line
Parasitic Run Physics Simulations
Beam Dump Experiments with Photon and Electron Beams
GEANT Simulations and Track Reconstruction
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

Heavy Photon Search experiment in Hall-B slides/ideas borrowed/stolen from talks of S. Stepanyan, J. Jaros, T. Nelson Special thanks to S. Stepanyan M. Guidal, IPN Orsay

A heavy photon (A’) is a conjectured U(1) force particle, a massive (~100 MeV) vector boson with weak couplings to electrons. If it exists, it kinetically mix with our (SM) photon, inducing small couplings to electric charge.  is expected to be of order m is expected ~ 10–1000 MeV (Loops of heavy particles coupling both to A’ and  ) What is a “Heavy Photon”? aka “Dark Photon”, “Hidden Sector Photon”

Does Dark Matter Couple to Heavy Photons? N. Arkani-Hamed, D.P. Finkbeiner, T.R.Slayter, and N. Weiner, Phys. Rev.D79, (2009) M. Pospelov and A. Ritz, Phys. Lett. B671, 391 (2009) Observation of unexpected fluxes of e ± in the cosmic rays prompted explanations involving DM annihilation. Dark matter coupling to the A’ could explain DM annihilation into e + e – theory PAMELA e + /e - FERMI/HESS e Flux

Fixed Target Experiments are an Ideal Hunting Ground

Heavy Photon Signatures A heavy photon appears as a narrow e + e - resonance on a copious background of QED tridents. The A’ lifetime depends on mass and   c  ~ 0.8 cm (E 0 /10 GeV) (10 -4 /  ) 2 (100 MeV/m A’ ) 2 Displaced A’ decay vertices can be identified over much of the m-  parameter space, distinguishing them from QED tridents. Trident Background A’ Signal Decay Length c  Bump Hunt A’ Signal Trident Background ** 

HPS Design evolved from BEST Concept J.D. Bjorken, R. Essig, P.Schuster, and N. Toro, Phys. Rev. D80, 2009, A’ kinematics  forward coverage required: E A’  E beam  A’  0  decay = m A’ /E A’ Want  m/m ~ 1% for bump hunt Want  z ~ 1mm Vertexing A’ decays requires detectors close to the target. Bump hunting needs good momentum/mass resolution. Both need tracking and a magnet. Trigger with high rate Electromagnetic Calorimeter downstream of the magnet to distinguish e + and e -. Survive beam backgrounds by spreading them out maximally in time and avoiding multiple scattered and degraded electrons Need CEBAF 100% duty cycle Need very high rate DAQ Avoid “Wall of flame” e + and e - entering ECal

HPS Overview Forward, compact spectrometer/vertex detector identifies heavy photon candidates with invariant mass and decay length (1T analyzing magnet). EM Calorimeter provides fast trigger and electron ID. Small cross sections and high backgrounds demand large luminosities. HPS survives beam backgrounds by spreading them out maximally in time, capitalizing on 100% CEBAF duty cycle and employing high rate DAQ. Muon detector for alternate trigger, muon ID All detectors are split above and below the beam to avoid the “wall of flame” from multiple Coulomb scattered primaries, bremsstrahlung, & degraded electrons.

CEBAF Beam and HPS Beamline HPS sits behind CLAS in Hall B. CEBAF meets Beam Requirements E 2.2, 6.6 GeV  p/p I nA  I/I < 5%  x,y < 30 µm halo < Beam position stability (<30 µm) OK using exiting BPMs and Fast Feedback and corrector magnets. Mechanical Vibrations not a problem. Measured to be ± 2 µm on forward carriage. New optics/quads gives10 µm spots quads chicane dump Halo measured <10 -5 Expected at 12 GeV

MC Tracker Studies Radiation Damage in Layer 1 Charged Particle Occupancy ( e ± hits/cm 2 /month ) in Layer 1 Si  strip detector vs height above beam Large but manageable dose on innermost strips. They remain functional up to 6 x /cm 2 (6 mn). Occupancies are high, but manageable. Occupancy  1% beyond “dead zone” at Y = 1.5 mm (above electron beam). Dead Zone 400 nA on.25% X 0 target Sensitive Area ≥ 1.5 mm Need to confirm full GEANT4 and EGS5 Monte Carlo studies

MC Tracker Performance Stand-alone pattern recognition is 98% efficient in presence of realistic backgrounds. Only ~ 1 % of tracks have  1 miss-hits. Track, vertex quality, and trajectory cuts nearly eliminate vertex tails. Before quality cuts After quality cuts Tracks with miss-hits make tails Vertex Resolution along the beam direction, Z v

Vertex Search Trident rejection is all in the tails! Trident vertices originate in the target, Z v = 0. A’ decays can extend to large Z v. Count vertices beyond Z cut to minimize trident background. E beam = 5.5 GeV  ’/  =  ’/  = Vertex Distribution for m A’ = 200 MeV ± 1.25 

MC Trigger Performance Full GEANT4 simulations are used to study trigger occupancies and rates. Occupancies OK for 8ns window and 100 MeV threshold Cluster, Energy, and Geometry cuts yield a trigger rate < 30 kHz Trigger (6.6. GeV)  2 clusters 0.5 < E 1,2 < 5.0 GeV E1 + E2 < E beam  E < 4.0 GeV Co-planar Can the EM calorimeter efficiently trigger the experiment at <50kHz?

HPS Reach* 6.6 and 2.2 GeV Reach 2525 * Small changes since proposal: muons added at high masses, improving reach; low mass cut-off was about 18, now 25 MeV.

HPS Collaboration Jlab Hall B & Collaborators, SLAC Group, Fermilab, UCSC 16 Institutions, 58 and counting Physicists and Engineers

HPS Proposed Run Plan Stage I Test Run (6 GeV Era) 2 weeks installation 1 week commission 1 week data run 2.2 GeV nA 0.125% X x 10 6 s Stage II Data Runs (12 GeV Era) 1 month installation ½ month commission 2 x 3* month data runs 2.2 GeV 200 nA 0.125% X 0 9 x 10 6 s * assumes 100% efficiency 6.6 GeV 450 nA 0.25% X 0 9 x 10 6 s Install Spring 2012 before summer down for CEBAF 12 GeV Upgrade Install in CEBAF 12 GeV Era, late 2014 or Stage I Test Run approved PAC37 Approved Stage II Full HPS approved contingent on Test Run results

Staging a challenging experiment Key environmental questions: Can Si microstrip detectors be operated downstream of a target with manageable occupancies and without radiation damage in close proximity to an intense electron beam? Can the EM calorimeter trigger the experiment at an acceptable trigger rate (<50kHz)? Is detector performance in the presence of realistic backgrounds good enough for the physics? Two ways to answer these questions. We’ve done one. We need both! Extensive full GEANT4 and EGS5 Monte Carlo studies of trigger rates, tracker occupancies, tracker pattern recognition efficiencies and purities, and tracker and vertexing performance in the presence of backgrounds. Stage I Test Run (proposed for Spring 2012) to check MC calculations, measure occupancies and trigger rates, and exercise detector.

Stage I Develops HPS Hardware, DAQ, Beams HPS Hardware, DAQ, and beams are needed to answer critical environmental questions for Stage I, but are also an essential investment in full HPS. Use existing Hall B beamline and diagnostics ( Target % r.l. W-target (4mm), 3 wire beam profiler, additional calibration foil 0.25 r.l.). Build simplified si tracker system (20 vs 106 modules) (only stereo modules) Build new Ecal Enclosure for existing (~460) PbWO4 crystal modules. Ecal will serve for full HPS too ( Vacuum chamber between 2 parts of the ECal) Adapt existing SLAC (tracker) and Jlab (Ecal) architectures for readout and data acquisition.

Layout of HPS test setup in Hall B Standard electron beam line CLAS Vacuum chamber between 2 parts of the ECal Upstream flange with feedthroughs for target and SVT controls Vacuum chamber through the magnet Photon beam dump Off axis by ~4’’

Beam parameters and beam line configuration  Vacuum through out the system on a way of primary and scattered electrons, and bremsstrahlung photons  The target and the Si-tracker installed inside a vacuum enclosure  Beam profiler at the target location  Photon beam dump downstream of the chicane and adequate shielding  Adequate beam diagnostics for beam profile, position and current measurements and monitoring ParameterRequirementUnit E2200MeV δp/p< Current~ 200nA Current Instability< 5% σXσX < 300 (< 100)μm σYσY < 30 (< 100)μm Position Stability< 30μm Divergence< 100μrad Beam Halo (> 5σ)< Never was requested for any Hall B experiments Was not looked at this level

CEBAF Beam Parameters Beam current measured with using SLM ( from recent Hall B run ) Typical beam size measured in Hall B ( from 2.2 GeV run )  Most of requested beam parameters are routinely delivered to Hall B  CW beam, 1497 MHz bunch repetition 499 MHz/hall  Beam energy 0.8 – 6 GeV, energy spread < At any requested current, stability < ±5%  Smaller beam sizes (< 30  m) and/or very tight specs on beam position stability (< 30  m) never were requested  Beam position stability, from beam profile scans, is < 50  m for X position, and < 30  m for Y  X ≈50  m  Y ≈90  m

Optimization of beam optics Optics program “elegant” (ELEctron Generation ANd Tracking) is used to optimize Hall B beam line for 2.2 GeV (2 pass) beam at the HPS target Emittances  x =1x10 -9 m-rad and  y = 1x10 -9 m-rad are used as input Arne Freyberger One of the optimization runs was to get the smallest possible beam sizes in both X and Y. With the existing B-line optics, beam sizes of ~30  m is achievable Another optimization was run to get an asymmetric beam. Required beam profile  X ≈250  m and  Y ≈20  m is also achievable

Optimization of Hall B optics  Optics optimization was tested during TPE run with a 2.2 GeV (2 pass) electron beam  Parameters were set for a beam profile of  X ≈300  m and  Y ≈10  m at the Hall B ”tagger” beam profiler (~8 meters upstream of the proposed HPS target location)  Several beam profile scans with different speed of wire scanner and data readout were performed to check systematics The wire scan speed was 0.1mm/s, beam motion faster than 1Hz is included in the scan. Position stability (from Y-peak position measured in various scans) < 20  m (feedback system was not initiated)  X ≈280  m  Y ≈20  m

Beam line simulations  GEANT4 model of the HPS beam line is ready for optimization of beam line elements (vacuum tract, flanges, photon beam dump, shielding …)  Simulation is based on experience gained from TPE beam line optimization Maurizio Ungaro Exit of the last vacuum chamber Electron beam line continues in vacuum Photon beam exits to He bag to photon dump Photon beam dump

Resources and schedule  Engineering and design will be done mostly by HPS collaborators (SLAC and ORSAY)  Hall B engineering group will be involved in coordinating of design and engineering efforts from contributing institutions, and in integrating of various new elements into the beam line  Key personal for beam line design: at Jlab Arne Freyberger and Stepan Stepanyan, at SLAC Ken Moffeit, Marco Oriunno, Dieter Walz, and Clive Field, at Orsay Philippe Rosier and Emmanuel Rindel. For beam diagnostics and slow control: Nerses Gevorgyan (Yerevan) and Hovanes Egiyan (JLAB)

HPS Test Run Primary HPS Test Run Goal : measure occupancies in detector elements, Si-tracker layers and Ecal modules, positioned in close proximity to the beam plane. It requires beam transport in vacuum, working si sensors, working Ecal, and DAQ. In the process, we get valuable experience controlling beams and commissioning HPS hardware, and we get a start on HPS.

Secondary objectives depend on establishing useful running conditions, delivering a si system capable of track finding, and providing a fully functioning and integrated DAQ. This will let us demonstrate full HPS capability (tracker alignment, track finding efficiencies and purities,momentum and vertex resolution, trigger development,…) HPS Test Run

Primary HPS Test Run Goal : measure occupancies in detector elements, Si-tracker layers and Ecal modules, positioned in close proximity to the beam plane. It requires beam transport in vacuum, working si sensors, working Ecal, and DAQ. In the process, we get valuable experience controlling beams and commissioning HPS hardware, and we get a start on HPS. Secondary objectives depend on establishing useful running conditions, delivering a si system capable of track finding, and providing a fully functioning and integrated DAQ. This will let us demonstrate full HPS capability (tracker alignment, track finding efficiencies and purities,momentum and vertex resolution, trigger development,…) To run the HPS test experiment there is no need for any new major beam line instrumentation. Hall B beam line is adequately equipped for this experiment. Requested beam parameters are comparable to ones routinely delivered to Hall B. Some of critical beam optics parameters are simulated and already tested, and will satisfy needs of the HPS test run. Design of new beam line elements are in progress, critical parts have workable solution. HPS Test Run

Primary HPS Test Run Goal : measure occupancies in detector elements, Si-tracker layers and Ecal modules, positioned in close proximity to the beam plane. It requires beam transport in vacuum, working si sensors, working Ecal, and DAQ. In the process, we get valuable experience controlling beams and commissioning HPS hardware, and we get a start on HPS. Secondary objectives depend on establishing useful running conditions, delivering a si system capable of track finding, and providing a fully functioning and integrated DAQ. This will let us demonstrate full HPS capability (tracker alignment, track finding efficiencies and purities,momentum and vertex resolution, trigger development,…) To run the HPS test experiment there is no need for any new major beam line instrumentation. Hall B beam line is adequately equipped for this experiment. Requested beam parameters are comparable to ones routinely delivered to Hall B. Some of critical beam optics parameters are simulated and already tested, and will satisfy needs of the HPS test run. Design of new beam line elements are in progress, critical parts have workable solution. Fully Commissioned Test Run Apparatus can do physics. * Search for heavy photons in the parameter space domain favored by a “heavy photon” explanation of the muon g-2 anomaly. * Search in the “vertexing” domain. HPS Test Run

Backups

HPS test setup S. Stepanyan, HPS review, March 1 (2011)31 Analyzing magnet operated at 0.5 Tm Electromagnetic Calorimeter PbWO 4 modules with APD readout in a temperature controlled enclosure, 15mrad Vacuum chamber between 2 parts of the ECal Si tracker - 5 layers, 10 stereo readout planes positioned at 15mrad from the beam plane Target % r.l. W-target (4  m), 3 wire beam profiler, additional calibration foil 0.25 r.l. Two dipoles, operated at 0.25 Tm, to keep primary electron beam on the nominal beam axis

Present Limits and Region of Interest J.D. Bjorken, R. Essig, P.Schuster, and N. Toro, Phys. Rev. D80, 2009, (BEST) ’/  2’/  2 Both “naturalness” arguments and fits to astrophysical data suggest  ’/    2 ~ – m A’ ~ MeV - GeV Both resonance-bump and separated decay vertex signatures are needed to explore this region

HPS Test Run Goals Primary HPS Test Run Goal (measuring occupancies and trigger rates) requires beam transport in vacuum, working si sensors, working Ecal, and DAQ. In the process, we get valuable experience controlling beams and commissioning HPS hardware, and we get a start on HPS. Secondary objectives depend on establishing useful running conditions, delivering a si system capable of track finding, and providing a fully functioning and integrated DAQ. This will let us demonstrate full HPS capability. * Tracker alignment * Track finding efficiencies and purities * Momentum and vertex resolution * Trigger development Modest extra expense gives greatly expanded capability Fully Commissioned Test Run Apparatus can do physics. * Search for heavy photons in the parameter space domain favored by a “heavy photon” explanation of the muon g-2 anomaly. * Search in the “vertexing” domain.