LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.

Slides:



Advertisements
Similar presentations
Eric Lécorché/ Epics meeting 21/10/ Setting the Spiral2 control system for the on-going commissioning.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Current Status of IFMIF
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Assessment of beam-target interaction of IFMIF A state of the art J. Knaster a, D. Bernardi b, A. García c, F. Groeschel h, R. Heidinger d, M. Ida e, A.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
Paul Chu FRIB Controls Group Leader (Acting)
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
IFMIF-LIPAc LLRF control system development based on EPICS Julio Calvo Ciemat Fall EPICS Collaboration Meeting This work has.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
EPICS Collaboration meeting Fall 2012, SDD status and plansPage 1 Self-Described Data - SDD status and plans Lana Abadie, ITER CODAC.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
12-CRS-0106 REVISED 8 FEB 2013 EPICS Collaboration Meeting 2013 CSS An integrated development and runtime environment for ITER plant system local controls.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
LEGNARO - LCS - LEGNARO - LCS - IFMIF/EVEDA – RFQ Legnaro Local Control System M. Montis INFN-LNL Monthly Collaboration Meeting - May 29, 2012.
IRFU COLLABORATION IN SPIRAL2 & LIPAC CONTROL SYSTEMS Françoise Gougnaud On behalf of D. Bogard, J-F. Denis, A. Gomes, J-F. Gournay (now retired), Y. Lussignol.
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Title of the slide Operation and commissioning of IFMIF LIPAc Injector and J-M Ayala A), B. Bolzon B), P. Cara C), N. Chauvin B), D. Chel B), D. Gex C),
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Scope and Project Plan of IFMIF/EVEDA Presented by Masayoshi SUGIMOTO (IFMIF/EVEDA Project Team, Deputy Leader/ JAEA) IAEA’s Technical Meeting on Nuclear.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
IFMIF/EVEDA Control System Basis J.F. Gournay CEA Saclay – Irfu/SIS.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
Connecting LabVIEW to EPICS network
CEA DSM Irfu - Pierre MATTEI SIS / LDISC -19/07/ Communication between EPICS and PLCs.
IFMIF RAMI analysis for an availability oriented design J. M. Arroyo 1, E. Bargalló 2, J. Abal 2, M. Weber 1, J. Mollá 1, A. Ibarra 1, C.Tapia 2, J. Dies.
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
The use of EPICS as a C&I tool for the RFQ accelerator facility at Necsa Mr M. Matabane.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Spring 2015 EPICS Collaboration Meeting, May 2015, FRIB East Lansing, MI, USA © 2015, ITER Organization Page 1 Disclaimer: The views and opinions.
ESS Integrated Control System Software Core Components S.Gysin
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Managed by UT-Battelle for the Department of Energy Experience on SNS Beam Instrumentation Collaborations Willem Blokland Beam Instrumentation Group Spallation.
“Implementation and Initial Commissioning of KSTAR Integrated Control System,” Mikyung Park NFRC, KOREA The 6 th IAEA Technical Meeting,
aIFMIF/EVEDA Project Team, Japan / bF4E / cJAEA
Combining safety and conventional interfaces for interlock PLCs
Study on IFMIF Beam-Target Interface
BEAM DYNAMICS STUDIES for IFMIF-EVEDA ACCELERATORS
Presented by Li Gang Accelerator Control Group
IFMIF/EVEDA – RFQ Legnaro Local Control System M. Giacchini INFN-LNL
SNS Status Report Karen S. White 10/15/08.
Overview and System Design for ESS LLRF Systems
LIPAc Control System Reliability improvements
Advanced-Fusion Neutron Source
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
COntrol, Data Access and Communication System for ITER
RF Local Protection System
EPICS: Experimental Physics and Industrial Control System
TS2 PSS Architecture, Concepts of Operations and Interfaces
Licensing requirements for Cryomodules
MPS commissioning at ESS
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
RF introduction Anders Sunesson RF group leader
IFMIF/DONES Project: opportunities for the industry
Presentation transcript:

LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control Systems family 36 m EPICS Fall Meeting 2014, Saclay

A. Marqueta EPICS Fall Meeting 2014, Saclay 2 Introduction to IFMIF/LIPAc LIPAc -> Linear IFMIF Particle Accelerator IFMIF -> International Fusion Materials Irradiation Facility (the fusion relevant neutron source)

A. Marqueta 3 EPICS Fall Meeting 2014, Saclay The first wall of the reactor vessel shall absorb neutrons energy and breed tritium ITER first wall will present <2 dpa at the end of its operational life In a Fusion power plant ~150 dpa within 5 years are expected Existing neutron sources do not provide the needed answers Neutrons in first wall Section of Vacuum Vessel of a Tokamak

A. Marqueta 4 EPICS Fall Meeting 2014, Saclay Deuterons at 40 MeV collide on a liquid Li screen flowing at 15 m/s IFMIF concept A flux of n·m -2 s -1 is stripped with a broad peak at 14 MeV EVEDA Phase: LIPAc

A. Marqueta 5 EPICS Fall Meeting 2014, Saclay Injector + LEBT CEA Saclay RFQ INFN JAEA Tokai MEBT CIEMAT Madrid SRF Linac CEA Saclay CIEMAT Madrid HEBT CIEMAT Madrid BD CIEMAT Madrid Diagnostics CEA Saclay CIEMAT Madrid RF Power CIEMAT Madrid CEA Saclay SCK Mol 36 m ★ Rokkasho Installed and commissioned in Rokkasho EVEDA phase: LIPAc Accelerator facility validation

A. Marqueta 6 EPICS Fall Meeting 2014, Saclay IFMIF/LIPAc Main Actors IFMIF/EVEDA A fruitful Japanese- European International collaboration (under the Broader Approach Agreement) LIPAc contributions: Japanese implementing agency European implementing agency (European coordinator) Central systems: -Network infrastructure -Central control system -Machine Protection system -Personnel Protection system -Timing system Local control systems: -Injector + LEBT -RFQ -LLRF -MEBT -+ (…) Beam Instrumentation

A. Marqueta 7 EPICS Fall Meeting 2014, Saclay Local Control Systems Injector + LEBT CEA Saclay RFQ INFN JAEA Tokai MEBT CIEMAT Madrid SRF Linac CEA Saclay CIEMAT Madrid HEBT CIEMAT Madrid BD CIEMAT Madrid Diagnostics CEA Saclay CIEMAT Madrid RF Power CIEMAT Madrid CEA Saclay Overview of LIPAc Control Systems Central Control System Injector RFQ MEBT SRF LINAC HEBT RF Power LLRF Beam Instrumentation MPS PPS Timing System EPICS Environment Hardwired Environment LAN

A. Marqueta 8 EPICS Fall Meeting 2014, Saclay LIPAc Control System: Main characteristics Modular design, following the architecture of the whole LIPAc, based on procurement ‘in-kind’: ₋independent subsystems with common interface. Based on EPICS and CSS for software applications (OPI, archiving, alarms…) ₋common standardized EPICS platform Around process variables managed globally ₋considered medium size facility MPS fastest response (beam shutdown, hardwired loop) of around 20us ₋But also has to manage slower PLC signals Overview of LIPAc Control Systems

A. Marqueta 9 EPICS Fall Meeting 2014, Saclay Local Control Systems Standard LCS architecture (standalone configuration) -European contribution, coordinated by CEA -EPICS standardization though guidelines, common EPICS/CSS platform -Delivered in local configuration to Rokkasho (to undergo acceptance tests before integration) EPICS Apps OPC Server PLC VME Field equipment (fast process) Field equipment (fast process) Field equipment (slow process) Field equipment (slow process) Profibus DP I/O signals S7 Protocol Channel Access Protocol Modbus TCP I/O signals

A. Marqueta EPICS Fall Meeting 2014, Saclay 10 LIPAc Schedule LIPAc Phase #1 Injector checkout Beam commissioning LIPAc Phase #2 RFQ Installation Phase #2 commissioning MEBT & D-plate Installation LIPAc Phase #3 HEBT & Bdump Installation Phase #3 commissioning SRF Linac Installation LIPAc Phase #4

A. Marqueta 11 EPICS Fall Meeting 2014, Saclay LIPAc Central Control System (Phase I): Overview of LIPAc Control Systems Courtesy of:

A. Marqueta EPICS Fall Meeting 2014, Saclay 12 Central Control System Outline CCS will consist of a number of services… CCS Local + Global OPIs, with key parameters from each LCS, global permits, etc. Centralized alarm manager, thus integration of all alarms from LCSs + actions Centralized archiving system, logging all EPICS variables (inc. MPS/PPS) Operator applications environment, still to be decided… + SVN manager Server for SNL execution + management of Operation States Server for SNL execution + management of Operation States

A. Marqueta 13 EPICS Fall Meeting 2014, Saclay EPICS integration: topIFMIF tree Application tree (Db, Gui, etc…) IOC tree All GUIs All database files (Db) Configuration files of topIFMIF

A. Marqueta 14 EPICS Fall Meeting 2014, Saclay Local Control Systems LCS Integration Process EPICS Apps OPC Server PLC VME Field equipment (fast process) Field equipment (fast process) Field equipment (slow process) Field equipment (slow process) Profibus DP I/O signals S7 Protocol Channel Access Protocol Modbus TCP I/O signals switch CCS EPICS Servers CCS EPICS Servers

A. Marqueta 15 EPICS Fall Meeting 2014, Saclay RFQ LCS Architecture

A. Marqueta 16 EPICS Fall Meeting 2014, Saclay Service: provisioning system

A. Marqueta 17 EPICS Fall Meeting 2014, Saclay EPICS GUIs

A. Marqueta 18 EPICS Fall Meeting 2014, Saclay Service: Surveillance

A. Marqueta 19 EPICS Fall Meeting 2014, Saclay Service: Monitoring  Possibility to check EPICS Variables Detailed Information Special thanks to Mauro Giacchini and his team…

A. Marqueta EPICS Fall Meeting 2014, Saclay 20 Thank you Thank you for your attention Follow us at wikipedia!