TRAIN MANAGEMENT SYSTEM ON MUMBAI SUBURBAN SECTION OF CENTRAL RAILWAY

Slides:



Advertisements
Similar presentations
Chapter 3: Introduction to Data Communications and Networking
Advertisements

Slide 1 Orion Telecom Networks Inc Slide 1 XC 64 E1 Electronic Patch Panel xcvcxv Updated: Nov, 2010Orion Telecom Networks Inc XC 64 Port.
ITEC474 INTRODUCTION.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Load Management System
TagMaster Training 2013 GEN4 Software Applications
A new Network Concept for transporting and storing digital video…………
HCTE RACKS CONFIGURATION
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
DEPARTMENT OBJECTIVES 1. To Identify and deploy information technology to meet business objective at CKPL. 2.To Provide support to users for systems usage.
Project By:. 2 Agenda Introduction Problem Definition Proposed Solution Block Diagram Flowchart Technical Implementation Hardware & Software Requirements.
Chapter 19: Network Management Business Data Communications, 4e.
Application of Integrated Management Systems (IMS) in Hong Kong (HK) Presenter: Dr. Linda C.N. Fan Department of Building & Real Estate, The Hong Kong.
UPS H series introduction UPS training June 2006 Markus Schwab.
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Downtown Seattle Transit Tunnel (DSTT)
DATALOGGER Welcome to the Presentation on DATALOGGER.
Delta Confidential DES UPS introduction UPS training June 2006 Markus Schwab.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Technical solution presentation AVL System for Fire Brigades.
APTA, Kevin Hassett, September 24, APTA Passenger Information Systems.
Connecting LANs, Backbone Networks, and Virtual LANs
CREW MANAGEMENT SYSTEM
Ethernet Data Gateway EDG Enables Information Boundary-less Over Ethernet.
1 Freight Operations Information System COM/CCM’s Conference
IP Based Sound System for Rest House
Video Management Control-Bit Technologies video system manages various types of video inputs; analog or digital, originated in both analog & IP cameras,
Table Of Contents Introduction What is WAN? Point to Point Links Circuit Switching Packet Switching WAN Virtual Circuits WAN Dialup Services WAN Devices.
IT Projects with CAO/FOIS
Production visibility: KPI’s in Real-time BASF – The Chemical Company
Traffic Management System And Passenger Information System Western Railway Experience.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
Symposium on “Sharing Best Electoral Practices” Innovative Practices in Election Management Web-based software application for tabulation of counting H.
Presentation on Facilities / Assets Management by Satyam Computers Services Ltd.
‘Monitoring Solutions for 2001’ Rome, Italy Wednesday 31 st January, 2001.
TeNeT Group1IRSTE Seminar Information and Communication Technology (ICT) and Indian Railways Ashok Jhunjhunwala, TeNeT group, IIT Madras
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Nurse Call System for Healthcare Niyamas. GSM Modem Web Server Smart Call Server HW-INT Patient 1 Patient 2 Patient n Panel indicators Block diagram of.
JVVNL & Data Infocom LIMITED JVVNL & Data Infocom LIMITED Collaborating for Customer satisfaction.
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Sr. DFMs’ Conference in Board Office on12 th April 2013 South Central Railway Presentation by R. Lalith Mohan, Sr. DFM/SC Dr. K.V.V. Satyanarayana, Sr.
© 2012 Veritec Solutions Incorporated. All Rights Reserved. Potential Synergies from Positive Train Control Bruce Patty Vice President – Transportation.
Computer Emergency Notification System (CENS)
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
1 Version 3.1 Module 1 WANs and Routers. 2 Version 3.1 WANS WAN operates at the physical layer and the data link layer of the OSI reference model. Provide.
Centralised Traffic Control Working On Dhamra line of ECoR
Integra32 System - Training Course
SMS Software Distribution. Overview  Explaining How SMS Distributes Software  Managing Distribution Points  Configuring Software Distribution and the.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2004 Connecting Devices CORPORATE INSTITUTE OF SCIENCE & TECHNOLOGY, BHOPAL Department of Electronics and.
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
PAM Module PAM-Integration Amongst Systems COA NTES Train Running Data PAM COA Exceptional Information PRS Exceptions: Rescheduling Cancellation Origin.
NERC Lessons Learned Summary LLs Published in September 2015.
Charting Tool A tool for a computerised Master chart (developed for Mumbai Central Division, Western Railway) IIT Bombay, Western Railway Presentation.
Accurate Information … Informed Decisions Data from automated and manual sources in a central, secure repository providing easy regulatory and ad hoc reporting,
Maharishi Arvind INSTITUTE OF ENGINEERING & TECHNOLOGY JAIPUR.
P ASSENGER RAILWAY RESERVATION AND RAILNET Presented by : Anshu Sharma.
Employment of scada system in water purification and transmission system.
Online School Management System Supervisor Name: Ashraful Islam Juwel Lecturer of Asian University of Bangladesh Submitted By: Bikash Chandra SutrodhorID.
Avivim TA’s Mobility management system. Urban Mobility Management Concept Transportation objectives often conflict  Accessibility Vs. Mobility  Efficiency.
Metrô Rio & SuperVia March Location BRASIL Rio de Janeiro Rio Rio de Janeiro Metropolitan Region - Population: 11,6 million - Counties: %
0 Dept: Transport Marketing Execution Dept Huawei Urban Railway Success Story - Zhengzhou Metro.
Practical Training Presentation INDIAN RAILWAY By:- Manoj Saran Branch:- ECE.
WATER RESOURCES DEPARTMENT
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
PARKING AUTOMATION SYSTEM
LCD Network Monitor.
Presentation transcript:

TRAIN MANAGEMENT SYSTEM ON MUMBAI SUBURBAN SECTION OF CENTRAL RAILWAY Rajeev Kumar Dy.CSTE(C)Dadar Bhaskar Verma DSTE(C)Dadar

MUMBAI SUBURBAN SECTION Mumbai CST to Kalyan (54 Km) - 26 stations Handles about 803 suburban trains which carry 35 lakh passengers daily and 208 Mail Express & Miscellaneous movements Train movement is based on Automatic Signaling During peak hours trains are spaced at 3 minutes interval Sectional capacity is already over saturated

NEED FOR TMS The present system of train control does not match highly intensive traffic requirement of suburban section. Controllers have no visual display of train movements. Station staff has to manually keep record of each train movement. No real time information to passengers about expected arrival time of trains.

IMPLEMENTATION OF TMS IN MUMBAI SUBURBAN SECTION Contract for TMS awarded to M/s Bombardier Transportation on 12.06.2008. Cost of contract Rs 26.61 cr. The scope of work consisted of: Central Server and Control Room Equipment Rear View Projection Unit Station Equipment for 26 stations including Field Interface Unit, PA/PIS integration, Expected Arrival Time display, Video Display Unit for arrival time of next 2 trains. Maintenance period for 2 years TMS in CSTM- KYN section commissioned on 05.12.2013. System is under 2 year maintenance period as per contract.

FEATURES/ BENEFITS OF TMS

For Section Controller: Live monitoring of train running Live status of Signaling gears Online generation of Train Control Chart, Controllers Diary Online messaging facility to Station Masters Ease of decision making in case of emergencies, blocks, train cancellation/ modification.

B. For Station Masters/ Announcer: Live monitoring of trains running Expected arrival time of next 2 trains is available Automatic operation of PA and PIS Automatic recording of train timing Automatic update of time table

C. For Commuters: Expected arrival time indication at Platforms VDU for expected arrival of next 2 trains at FOB Accurate announcement and display of train information Status of train information is available through NTES on Real Time basis (due to integration of TMS with ICMS)

D. For Management: Integrated view of all trains and signaling gears of CSTM-KYN sections at Control Room Live train data to CRIS server for unified reporting No possibility of false reporting of train timing Generation of various MIS reports Quick update of Train Time Table and download at stations

TRAIN MANAGEMENT SYSTEM DISPLAY WALL CONTROLLER PRINTER PLOTTER CONTROLLER TERMINALS TRG & SIMULATION TERMINAL MAINTAINER TERMINAL ASM PC Mumbai CST DADAR Relay Room FIU KALYAN Omnibus2 E1 channels REAR VIDEO PROJECTION SYSTEM TRAIN MANAGEMENT SYSTEM CENTRAL RAILWAY APPLICATION SERVERS MAIN HOT STANDBY PIS SYSTEM VDU PA System Other Controller terminal INDICATOR PIS SYSTEM LOBBY/ CARSHED ETC Dual LAN FOR UNDERSTANDING PURPOSE ONLY Centralised Announcement System D/I MUX CST

CONTROL ROOM EQUIPMENT Application server in hot standby mode and a Training & simulation server (HP Itanium 64 bit servers, OS- RH Linux4.8, Oracle 10G for DB)‏ 40 KVA UPS with hot standby arrangement and 2hrs battery backup. Rear Video Projection Units (BARCO DLP Panel size 70 inches diagonal in 2 rows of 8 panels each) Workstations with 3 monitors for Section Controllers and workstations with 1 monitor for other Controllers A dual LAN connecting all workstations in Central Control (HP router & switches)‏ Line Interface Units for polling data coming from Field Interface Units

CENTRAL CONTROL LAN SCHEMATIC

REAR VIDEO PROJECTION UNIT

FIELD EQUIPMENT FIUs in relay rooms repeat the status of all panel indications such as signals, points, track circuits etc. to the Central Server. 1KVA single phase UPS with 1 hour battery backup for FIUs. Drop Insert Nokia MUX equipments installed at all OFC locations between CST-KYN and Terminal MUX at CST, BIRD, ABY and ABH. RAD ASM 31 modems (V.24) for connectivity between Relay room and OFC Workstation at train terminating and originating stations viz. CST, BY,MZN,DR, CLA, LTT, TNA, DW, DI & KYN in star connectivity with router at Central Control. ASM PC for operation of Indicator, EAIM and PA system. contn

SCHEMATIC OF INSTALLATION AT A STATION

ANNOUNCER ROOM INSTALLATION

NEED FOR INTEGRATION OF TMS WITH ICMS Scope of TMS is limited to CSTM – KYN section. However, local trains run beyond Kalyan up to Karjat and Kasara. As per contract TMS reports are limited to CSTM- KYN section. Division wanted unified report including section beyond Kalyan by linking TMS data of CSTM-KYN with CRIS server. A separate work was executed for integration of TMS with CRIS server (for CRIS applications of COA, ICMS and NTES). Work scope: Bombardier: Provided TMS real time data for CSTM-Kalyan without any delay on separate server machine in Oracle database.   CRIS: To install required software’s (JMS messenger) on separate machine to fetch the real time data from oracle database to CRIS server. Division: To provide WAN connectivity through railnet from TMS Server (Mumbai) to CRIS Server.  

CONCLUSION TMS has been commissioned successfully on 05.12.2013 in CSTM-KYN section and warranty period of two years has started form 06.12.2013.   Following operation / passenger benefits are being felt in day-to-day suburban rail operations on account of TMS: The section controllers are much relieved with automatic time stampings in Train Control Charts. This has enabled them to focus on management of train operations. Since live train movements are available both to Section Controllers and Cabin ASMs, the communication gap between them has been eliminated. Availability of live indications of signaling gears and level crossing gates in the Control Center as well as with Cabin ASMs, is very useful in planning traffic movement. Availability of live train movements is especially useful during Mega blocks / traffic disruption for planning train movements and diversions. Commuters are benefited with real time announcements of train arrivals, delay, display of countdown in minutes beside Train Indicators and display of information of next two trains expected in each platform in VDUs placed at station entrances and FOBs. TMS facilitates to get Online Information of the Status of Running of Trains through NTES.

THANK YOU