Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Progress with coupling FUI and CWE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Cross-regional roadmap for Long- Term Transmission Rights XXI Florence Forum Florence 5 December 2011.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
European Commission views on intra-day and balancing markets
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Cross-regional roadmap for Long-Term Transmission Rights
Status of Implementation of PCR for Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
Third package December,
NWE Day-Ahead Price Coupling
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Supported by: PCR Status report AESAG, September
Presentation transcript:

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011

2. Target model is a single European Price Coupling (EPC) by Purpose of cross-regional roadmaps: to identify key milestones, both at EU and regional level, and accountabilities to increase consistency between and across the regions and thus efficiently pave the way for the completion of the Internal Electricity Market by Draft cross-regional roadmap based on: regional consultation and contribution to the European energy work plan; Input from AESAG; Stakeholder comments to earlier drafts; Discussion at ACER coordination group for ERI; FG on CACM. Background

3. General approach: » focus on NWE price coupling implementation by 2012 » open to other borders if ready and if no delay for NWE project » Flexible parallel/stepwise process towards European Price Coupling (EPC). NWE project: NRAs from NWE (CWE, NE, GB) established Cross-Regional Coordination Committee (CRCC) to lead the NWE process. Lead regulators of all other regions, ACER and one NRA per additional market coupling project (e.g. CZ-SK-HU) have observer status. TSOs, PX, NRAs discussion on NWE price coupling advanced. Project initiation (TSOs/PX) ongoing with documents under negotiation (All Party Cooperation Agreement; Project Initiation Terms; Non- Disclosure Agreement). Resources already planned. Towards European Price Coupling by 2014

4. EU-wide level Coupling solution: PCR algorithm being developed by PXs with support of all Europex members (using COSMOS as starting point) and assessed by ENTSO-E. PCR to be available to all Europe. Approval process in every country coordinated by ACER. MS involvement insured by NRAs where appropriate and necessary. Governance: Governance Guideline under preparation. Implementation of EPC should start in parallel using interim governance solutions.. NWE and other Regions level Interim governance arrangements basis for launching NWE price coupling and other regional market coupling solutions; based on existing solutions in other regions/countries parallel/stepwise process towards EPC. Basic components of European Price Coupling (I)

5 Basic components of European Price Coupling (II) Governance Framework (contracts, regulations) Coupling Solution Pre/post Coupling Processes Governance Guideline EU-wide framework Local arrangements in line with Governance Guideline Regional frameworks (contracts, regulation) Supra-regional coordination frameworks (e.g. NWE) European solution (EPC) Regional solutions (currently different coupling solutions, e.g. CWE MC, ITVC) Regional/local solutions (progressive harmonisation possible)

6. Common information level necessary to ensure smooth integration of additional borders;. Adjacent borders may adopt PCR algorithm in parallel and/or join NWE price coupling from the beginning if this does not delay overall progress towards EPC;. For a smooth and efficient achievement of the target model the approaches of this cross-regional roadmap and the one for capacity calculation need to be in line. This will be ensured by NRAs and TSOs;. Existing/forthcoming bilateral market coupling initiatives need to be compatible; and should not delay implementation of the EPC day-ahead target model. Ensuring this will at least require the submission of a detailed action plan, explaining how coherence and consistency with the overall project and the 2014 target model can be achieved. Basic principles to avoid stumbling in progress (I)

7. Algorithm starting point (PCR) shall be the same for all borders.. Not all arrangements need to be the same throughout the coupled region In particular pre/post coupling and governance arrangements (TSO- TSO, TSO-PX, PX-PX) may differ. NWE shall concentrate on what is needed to implement NWE price coupling in 2012, be transparent, flexible and open to enlargement via arrangements/structures differing from NWE. Basic principles to avoid stumbling in progress (II)

8 Cross regional roadmap for day-ahead Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Procedural steps NWE price coupling (CWE, NE, GB borders) Integration of SWE borders * Integration of CEE borders * Integration of remaining Baltic borders Integration of CSE borders Integration of remaining FUI borders ** Single European Price Coupling (EPC) Integration of SEEIntegration of SEE not later than 2015 * MIBEL, Hungary, Slovakia, and Czech Republic are willing and committed to join EPC by end of 2012 ** SEM may provide for transitional arrangements which are defined in section 1.2 of FG CACM.

9 ACER requested NWE (TSOs and PXs) to define a very concrete proposal on flexible high- level interim governance arrangements for the NWE project incl. description for which borders differences in approaches may be appropriate ENTSO-E to validate PCR algorithm starting point and to agree with Europex on one single algorithm Europex to demonstrate the efficiency, manageability and reliability of the system design ENTSO-E and Europex to propose cost-sharing between NWE and non- NWE countries for the costs associated to the PCR algorithm development NWE NRAs requested TSOs and PXs to prepare a detailed proposal regarding the cost recovery for NWE costs Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Procedural steps

10 ENTSO-E sends algorithm-requirements to Europex and assesses starting point PCR algorithm Europex demonstrates the efficiency, manageability and reliability of the system design to ACER and NRAs ENTSO-E and Europex propose cost-sharing between NWE and non-NWE countries Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Procedural steps

11 ENTSO-E and Europex consult market participants on starting point PCR algorithm as validated by ENTSO-E and report outcome to ACER and NRAs NWE (TSOs and PXs) submit to ACER/NWE NRAs for review/validation: flexible high-level interim governance arrangements for the NWE project cost-recovery proposal for the NWE costs ACER coordinates NRAs endorsement (e.g. through letter of comfort) of: starting point of the PCR algorithm cost-sharing between NWE and non-NWE countries for the costs associated to the PCR algorithm development flexible high-level interim governance arrangements for the NWE project Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Procedural steps

12 All NRAs agree on common, coordinated approval/review process for the algorithm involve MS where appropriate and necessary start national review processes (possibly consultation) in parallel NWE NRAs approve cost recovery proposal regarding NWE costs Once the Commission adopts Governance Guideline interim governance arrangements may need to be revised (date still unclear) TSOs/PXs ask NRAs for national approval/review of national specificities to the final algorithm; starting in NWE and regions formally committed to join in 2012, this step is repeated for every additional border amongst respective NRA/TSO/PX TSOs and PXs regularly inform all NRAs and stakeholders on implementation steps Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Procedural steps

13 Project milestones NWE comprises CWE, NE (+SwePol and Estlink) and GB (IFA, BritNed); Already today there exists a market coupling covering this area except IFA; Swiss TSO announced interest in joining CWE Market Coupling by mid 2012; this must not delay the start of the NWE price coupling; Final implementation of price coupling planned for Q4 2012; To coordinate this process NRAs organise NWE CRCC meetings and NWE implementation group meetings (NRAs, TSOs and PXs) on a regular basis; Inclusion of other borders via bilateral agreements between PXs, TSOs and NRAs possible. Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 NWE price coupling (CWE, NE, GB borders)

14 Project milestones Iberian Peninsula already coupled via MIBEL; Start of testing phase (operational changes) foreseen for Q1 2012; Preparation of regulatory changes start in Q3 2011; Planning for adoption of PCR algorithm and harmonisation of organisational process, start in 2012; * MIBEL is willing and committed to join EPC by end of 2012; this must not not delay the start of the NWE price coupling. Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Integration of SWE borders *

15 Market coupling projects in CEE countries: Czech Republic and Slovakia coupled since 09/2009; Hungary plans to couple with Czech Republic and Slovakia in the first half of 2012; * These project partners are willing and committed to join EPC by end of 2012; this must not delay the start of the NWE price coupling; CEE NRAs and ACER will evaluate and decide on implementation path beginning 2012; Final implementation of price coupling covering the entire region foreseen for end Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Integration of CEE borders *

16 Currently two different PXs operate the separated markets of Estonia (part of NPS Nordic Elspot) and Lithuania (Baltpool); A common electricity market, based on NPS will be introduced in the Baltic countries; Implementation of price coupling in the Baltic region at the latest in Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Integration of remaining Baltic borders

17 The CSE region starts discussion on potential implementation paths for market coupling in Q4 2011; Gradual adoption of PCR algorithm; adaptation of market features to comply with coupling needs 2012/2013; Implementation of price coupling within the CSE region Q Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Integration of CSE borders

18 GB (IFA, BritNed) will already be part of the NWE price coupling end of 2012; In order to start Market Coupling between SEM (Single Electricity Market in the Republic of Ireland and Northern Ireland) and GB certain changes in the SEM market design are needed; Implementation of price coupling between SEM and GB (i.e. participation in EPC) is foreseen by end of 2014; * * SEM may (as part of FUI) provide for transitional arrangements for day ahead which are defined in section 1.2 of FG CACM. Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Integration of remaining FUI borders **

19 The SEE region foresees the implementation of price coupling not later than 2015; Romania and Bulgaria need to implement the price coupling before end of 2014; Bulgarian TSO, Romanian TSO and Romanian PX coordinated a roadmap for implementation of market coupling on their border with the target date – Q The Romanian TSO, PX and NRA expressed their willingness to join the Czech Republic, Slovakia, Hungary – market coupling project that means to respect the deadline and compatibility with CWE/NW solutions. Project milestones Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Integration of SEE borders Integration of SEE Region not later than 2015

20 Disclaimer ACER and the Electricity Regional Initiative coordination group have completed the elaboration of a European Energy Workplan The European Energy Workplan consists of four cross-regional roadmaps which identify milestones and responsibilities for implementation of a common European approach to cross-border electricity trading by To agree the four cross-regional roadmaps, the seven electricity regions developed a regional input to the European Energy Workplan. The seven regional inputs were developed in discussion with TSOs and member states and consulted on with regional stakeholders. The regional inputs explain each regions contribution to completing the internal electricity market. The four cross-regional roadmaps have been developed and agreed on the basis of the regional inputs. As a result of this process the cross-regional roadmaps and regional inputs may not be completely consistent. However, ACER and the National Regulatory Authorities have agreed that the European Energy Workplan consists of only the four cross- regional roadmaps. This means that, if any inconsistency remains between the seven regional inputs and the four cross-regional roadmaps, stakeholders should consider that the cross-regional roadmaps prevail.

21 Thank you for your attention