Power Curve Working Group Update New Orleans 15 th September 2015.

Slides:



Advertisements
Similar presentations
9 November 2007 Cecilia de la Rosa Head of the Internal Quality Unit How to prepare for an external review Current trends in the European Quality Assurance.
Advertisements

Urban Transport Benchmarking Year Three Urban Transport Benchmarking Initiative The Year Ahead Directorate-General for Energy and Transport EUROPEAN COMMISSION.
Guidelines for good project management An output of the RE-ACT project under Interact Ronan Gingles for AER, Strasbourg, 14 June 2007.
EU Developments Transmission Workgroup 6th October 2011.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
PCWG 9 th Meeting: 12 December Glasgow Introduction, Agenda and Review of Actions.
Principles of Project Management Case Study - Programme Management: Developing a Blueprint Graham Collins University College London (UCL)
INVESTMENT APPRAISAL: NET PRESENT VALUE A2 Business Studies.
INTEGRATING BENEFICIARY FEEDBACK INTO EVALUATION- A STRUCTURED APPROACH Presentation to UKES Conference May 2015 Theme: Theory and practice of inclusion.
Parameterised turbine performance Power Curve Working Group – Glasgow, 16 December 2014 Stuart Baylis, Matthew Colls, Przemek Marek, Alex Head.
Power Curve Working Group Overview
1 PCWG Peter Stuart 02 September Agenda (1) 2 Morning Session: 10am-1pm – “Welcome” Peter Stuart (RES) – “Review of Actions.
PCWG 9 th Meeting: 12 December Glasgow Proposed PCWG Data Sharing Initiative.
LiDAR analysis at a site with simple terrain Alex Clerc, Lee Cameron Tuesday 2 nd September
ISO 9001:2015 Revision overview - General users
Lean Supply Chain Action Learning Program September 2007.
High-Level Meeting of Regional Energy Regulatory Associations of Emerging Markets Sergey Novikov Head of the Federal Tariff Service (FTS of Russia) April.
ISO 9001:2015 Revision overview - General users
Wind Power Analysis Using Non-Standard Statistical Models
3D Power Deviation Matrix PCWG Meeting – New Orleans, LA. September 14, 2015 Alex Head.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Independent Monitoring & Evaluation for Accountability Presented to Health Sector Steering Committee, 21 st July 2009.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
1 EU Emissions Trading Scheme – New System to allocate free Allowances from 2013 onwards IFIEC Energy Forum Brussels, 9 June 2011 Hans Bergman DG Climate.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
QAA Summative Review Staff Briefing Leeds College of Art 8 September 2010.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
Supporting Industry Change Planning: Risk, Issue & Milestone Assessment Process Clarifications 04/08/2014.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Power Curve Working Group Update Roskilde 26 th June 2015.
IRG/ERG Gabrielle Gauthey Member of the Board of ART.
Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.
A New Theoretical Basis for Describing Low Turbulence Wind Turbine Performance Peter Stuart PCWG Meeting – 26 June 2015.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Federal Software Asset Management Initiative Concept of Operations Report to the Executive Steering Committee March 8, 2004 Implementing the President’s.
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Ambition in Action. Ambition in Action SUPPORT FOR TEACHERS: ASQA Compliance Preparation /Educational Risk Group /Consultant: Assessing high risk areas.
PCWG 15 th Meeting December 2015 – Kings Langley PCWG 2016 Roadmap: Detailed Survey Results.
STESEG taskforce on timeliness and benchmarkingJune The Short-term economic statistics: STES Timeliness Framework Richard McKenzie OECD.
PCWG-Share-01 Initial Results PCWG Meeting Kings Langley 9 th December 2015 Peter Stuart (RES), Lee Cameron (RES), Alex Clerc (RES) & Andy Clifton (NREL),
Employment Social Impact Bonds. Our partnership Numbers4Good and the Centre for Economic and Social Inclusion (Inclusion) are launching a new partnership.
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
8th October Aarhus PCWG-Share-01 Introduction.
Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.
© 2013 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. The Value Review.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
PCWG-Share-01 Current Status PCWG Meeting Hamburg 10 th March 2016 Peter Stuart (RES) and Andy Clifton (NREL), on behalf of the Power Curve Working Group.
PCWG Intelligence Sharing Initiative 10 August 2016 NREL, Colorado, US.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
PCWG 2016 Update 20th May 2016 Peter Stuart.
IEC FDIS 2016 Consensus Analysis Project
PCWG 2016 Update Wednesday, 13 December 2016 Glasgow, Scotland
IEC FDIS 2016 Worked Examples Ellie Weyer, AWS True Power
PCWG Intelligence Sharing Initiative Update
PCWG Intelligence Sharing Initiative Update 13 December 2016
PCWG 2016 Roadmap & Meeting Overview
PCWG Intelligence Sharing Initiative
August ICA Agenda Time Topic 8:00 – 8:15
August LNBA Agenda Time Topic 1:00 – 1:15
TG-DATA meeting. 7-8 June 2017, Copenhagen
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Exit Capacity Substitution and Revision
Work plan and next steps – RDE-LDV working group
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Presentation transcript:

Power Curve Working Group Update New Orleans 15 th September 2015

The Power Curve Working Group The PCWG aims to further refine the accuracy energy yield predictions to improve investor confidence. The PCWG has over 200 members across 80 organisations. Turbulence Intensity [%] Wind Speed [m/s] Colour = % Power Deviation The PCWG is focused on accurately predicting wind turbine performance in ‘non-standard’ (outer range) atmospheric conditions e.g. low/high shear/veer, low/high turbulence, inflow etc.

Impact of Investment Risk on Project Economics Examine impact of cost reduction and discount rate on NPV (illustrative numbers only) Investors quantify risk using a discount rate (also called a hurdle rate). The discount rate expresses an expectation of return for a given level of risk. Net present value (NPV) can be interpreted as the money left over after an investor’s expectation if return has been satisfied. Define cost reduction factor r Reducing of investment risk and reducing of costs has similar impact on project economics Increasing Cost Increasing Risk Cost Discount Rate

Openness is a key principle, all historic proceedings are available online at PCWG 2015 Roadmap Themes PCWG Open Source Analysis Tool Open Source Excel Benchmarks Intelligence Sharing Initiative Harmonised Stakeholder Communication

Download PCWG 2015 Roadmap from

Download PCWG 2015 Roadmap from Intelligence Sharing Initiative Turbine Performance Information Pack

PCWG Intelligence Sharing Initiative A key focus of the PCWG during 2015 is the 1 st PCWG Intelligence Sharing Initiative (PCWG-Share-01). Propose TestAggregate Decide on methods to be tested Evaluate performance of trial methods on each individual dataset Combine performance metrics of all datasets Disseminate Publically disseminate results The initiative aims to aggregate information across organization boundaries in order to deliver a step change in industry understanding of turbine performance. The existence of Open Source Excel Benchmarks has been defined as a prerequisite for the inclusion of a method in PCWG-Share-X.

The proposed structure of PCWG- Share-01 has been captured in a “definition document” which has now been finalised and circulated to PCWG members. Final definition document is available at PCWG Intelligence Sharing Initiative

Proprietary Dataset D Analysis Definition Y Organization D Proprietary Dataset A Organization A Proprietary Dataset B Organization B Proprietary Dataset C Organization C Aggregator (Academic Institution ) Combination Analysis Aggregated Hypothesis Performance Metrics Hypothesis Performance Metrics Analysis Definition Y Hypothesis/Trial Methodology How well did the trial method perform? PCWG-Share-01: Data Flow

Time June Finalise Definition Doc Finalise Analysis Tool July PCWG Participants work to set up their proprietary datasets Aug Roskilde PCWG Meeting Sep US PCWG Meeting Aggregate Initial results + Present Oct Aarhus PCWG Meeting Nov EWEA Paris Dec London PCWG Meeting AWEA New Orleans PCWG Participants perform further analysis Aggregate final results + Present Agree Conclusions PCWG-Share-01: Timeline

Open Source Excel Benchmarks Excel Consensus Analysis for IEC Turbulence Correction and Associated Documentation All methods examined by PCWG-Share-01 will have a publically available Benchmark.

PCWG Analysis Tool Excel Benchmark and PCWG Analysis Tool Comparison

PCWG Screen Cast Demo A step by step demo of setting up a dataset in the Analysis Tool has been published on the PCWG website:

Another key action of the PCWG 2015 roadmap is the creation of a document to harmonise the communication of power curve information. The guidelines aim to ensure that all stakeholders can confidently: Harmonisation of Power Curve Communication o Understand the evidence base behind the documented turbine performance. o Understand what elements of the turbine performance data are warranted and what elements are purely informative. o Understand how to model turbine performance in Inner Range Conditions. o Understand how to model turbine performance in Outer Range Conditions.

A DRAFT document “Guidelines for Preparation of a Turbine Performance Information Pack” has been circulated to members and will be discussed at the September and October PCWG meetings. The current draft is available on DropBox: ‘DRAFT Guidelines for Preparation of a Turbine Performance Information Pack.docx’ Harmonisation of Power Curve Communication

15 th September 2015 Agenda Introduction: – Intelligence Sharing Initiative: – 13.00: o – Initiative Definition Discussion (Scope, Schedule, Roles & Responsibilities) o – Power Curve Working Group Analysis Tool  Quick Demo of setting up and analysing a dataset in the PCWG Analysis Tool  Discussion on readiness of Power Curve Working Group Analysis tool to support the data sharing initiative. o – Thoughts from PCWG-Share-01 Participants  Presentation: PCWG Intelligence Sharing (a participants view), EDF.  Discussion o – Candidate Methods for PCWG-Share-02  3D Power Deviation Matrix - Alex Head (Prevailing)  Production by Height – Dan Bernadette (AWS TruePower)  Machine Learning– Andy Clifton (NREL)

15 th September 2015 Agenda Lunch: – Afternoon Presentation Session: – 15.00: o – 14.20: Using turbine specific information to determine power performance a practical example - Taylor Geer (DNV GL) o – 14.40: The Potential to Use Mesoscale Models to Predict the Turbine Specific Frequency of Outer Range Conditions, Gil lizcano (Vortex) o – 15.00: A New Theoretical Basis for Describing Low Turbulence Wind Turbine Performance, Peter Stuart (RES) Coffee Break – Afternoon Discussion Session – 16.15: Discussion on draft turbine performance information pack guidelines document (harmonisation of communication action from roadmap). Meeting Wrap Up – Intelligence Sharing Initiative Informal Working Session – 18.30

Any other objectives for today? Objectives for 15 th September 2015 Gather US PCWG member feedback on the structure of PCWG-Share-01 Increase familiarity with the process of setting up datasets in the PCWG Analysis Tool Discuss power curve information harmonisation document (turbine performance information pack)