Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
Transparency and promotion of the CDM
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
JI Governance – review of JI Guidelines
UNFCCC secretariat Enhanced Interactions and Direct Communication – Policy matters First SDM Joint Coordination Workshop Bonn, Germany, March 2012.
CDM Regional Distribution Ensuring Broader Participation in the CDM Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
Wrap-up session : Global and Local Stakeholder Consultation Process 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn.
Validation and verification report templates
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Enhancing Interaction between the DNA Forum and the Executive Board Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Eva Filzmoser, CDM Watch First SDM Joint Coordination Workshop March 2012, Bonn Global and Local Stakeholder Consultation.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Presentation title Overview of measurement, reporting and verification (MRV) for developing country Parties under the Climate Change Convention Asia Pacific.
Reporting on SD co-benefits using the new CDFM SD Tool and opportunities for monitoring to enhance the profile of CDM projects and CER price: what the.
UNFCCC Roles and structure of Designated National Authorities (DNAs) Fabiana Rodrigues, UNFCCC secretariat Regional Workshop - Latin America and the Caribbean.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
1 Status of PSC recommendations (January December 2007) Portfolio Committee on Public Service and Administration 14 March 2008.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
Guidelines for non-Annex I National Communications Implications for Assessment of Impacts of, and Adaptation to Climate Change Asia-Pacific Regional Workshop.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 REVIEW AND FUTURE PLAN OF TASK.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
CDM: ISSUES FOR CMP 2 AND THEIR IMPLICATIONS TO LDCS Presentation made to the LDC Negotiators Workshop, Nairobi, 3 November, 2006 Richard Muyungi United.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Clean Development Mechanism
process and procedures for assessments
JISC – work accomplished and challenges ahead
11–12 April 2005 Wissenschaftszentrum, Bonn, Germany
Implementation Subprogramme
GEF & UNFCCC Cooperation: COP 17 Action Items
GEF & UNFCCC Cooperation: COP 17 Action Items
Setting Actuarial Standards
Presentation title Africa Carbon Forum 13 April, 2018 Nairobi
Q&A sessions at UNFCCC SB26
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Presentation transcript:

Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC secretariat Regional Workshop on CDM and NAMAs for Latin America and the Caribbean (31 Aug – 2 Sep, 2014) Bogotá, Colombia

2 Structure Requirements: CDM Local Stakeholder Consultations Boards Initial Views and Clarifications Status of work & actions – to improve local stakeholder consultations -Track 1: Mandates by CMP (Warsaw) -Track 2: Mandates by the CDM Executive Board -Track 3: Review of the CDM Modalities and Procedures Actions Taken by Board as of date (for all tracks)

3 Requirements of CDM Local stakeholder Consultation CDM Modalities & Procedures stipulates two consultation process during validation: -Local stakeholders – prior to publication of PDD -Global stakeholder consultation (GSC) – 30 days (45 days for A/R projects) during publication of PDD in the website Requirements of CDM Modalities & Procedures: “The DOE ……. shall review the PDD to confirm that the ……Comments by local stakeholders have been invited, a summary of the comments received has been provided by PP, and a report to the designated operational entity on how due account was taken of any comments has been received” [3/CMP.1, para 37 (b)] Board’s procedures (PS, VVS, PCP) provide further guidance on how these processes should be conducted and what actions should be undertaken by DOEs.

4 Status of work & Actions – to improve local stakeholder consultations Work progressing under three parallel tracks: Track1: Mandates by CMP (Warsaw) -CMP at its 9 th session requested the CDM Executive Board, with the support of the secretariat, to collaborate with the Designated National Authorities Forum on collecting and making available, on the UNFCCC clean development mechanism website, information on practices conducted for local stakeholder consultations, and to provide technical assistance to designated national authorities, upon their request, for the development of guidelines for local stakeholder consultation in their countries Track 2: Mandates by the CDM Executive Board -Revision of PS, VVS, PCP as per work-plan of Board Work to improve LSC as mandated by EB70 (para 92-94) Track 3: Review of the CDM M&P -Recommendation of the Board to SBI on possible changes to the CDM M&P -Technical paper by the secretariat based on Parties views and submission on possible changes to the CDM M&P

5 Updates on status of work under Track 1: Mandates by CMP (Warsaw) EB78 agreed on the work-plan 2014, to deliver the CMP mandate. The Board set up project 227 and the project aims to: a)Collaborate with the DNA Forum on collecting and making available, on the UNFCCC CDM website, to facilitate sharing experience among parties, information on the practices conducted for LSC; and b)Provide technical assistance to DNAs, upon their request, for the development of guidelines for LSC in their countries.

6 Updates on status of work under Track 1: Mandates by CMP (Warsaw) Action Taken by Board as of date: Developed and launched website in 1 st week of May 2014 Communication sent to all DNAs. As on date only one DNA expressed interest to receive technical assistance to develop guidelines. EB 70 requested secretariat to create more awareness among DNAs including at this event. DNA of Brazil shared their practices for LSC. Board shall consider a concept note defining work plan to assist DNAs when a request from an eligible DNA is received.

7

8 Updates on status of work under Track 2: Mandates by the CDM Executive Board Action Taken by Board as of date: At EB69 (Annex 22) and EB70 (para 91-93), the Board considered a “Concept note on improving the stakeholder consultation process” taking into account inputs received from stakeholders: - call for public inputs launched in th CDM Round Table (10 August 2012 in Bonn) - other inputs The Board : For global stakeholder consultations: agreed to improve the process by expanding the type documents required to be published to improve transparency, by defining the scope of comments to be submitted and analyze the feasibility to submit them in the official language of the host country and by providing guidance to the DOEs on the treatment of the comments received

9 Updates on status of work under Track 2: Mandates by the CDM Executive Board Action Taken by Board as of date: If significant changes have occurred in the project design after the initial local stakeholder consultation (LSC), the DOE, as part of its validation process, shall assess whether the LSC is still adequate. Agreed to establish a grievance mechanism for stakeholders to channel their complaints to the DNA of the host country in case they are not satisfied on how their comments have been addressed by the PPs. Those amendments and improvements of the LSC and GSC have been integrated in the new revision of the PS, VVS and PCP adopted by the Board at its 80 th. Requested the secretariat to further work on improving the process of LSC through, among others, defining the minimum groups of stakeholders that should be consulted, the means of consultations. Requested the secretariat to come-up with proposals to deal with stakeholders comments received after the registration of the project that are delinked of the verification process but nevertheless constitute a formal process for dealing with those concerns. EB 81 in Lima will consider a new proposal from the secretariat.

10 Updates on status of work under Track 3: Review of the CDM M&P Actions taken by Board as of date: The Board made recommendations to SBI 38. Recommendation on stakeholders consultations consisted on : - Strengthening the requirement in paragraph 37 (chapeau and (b)) to require the DOE to validate that the local stakeholder consultation was carried out in accordance with host Party laws and regulations, and to evaluate how the content of the comments was duly taken into account. Possible changes in the technical paper submitted to SBI 40 consisted on: based on parties views consisted: - DNAs make publicly available and maintain up-to-date information relating to the applicable rules relating to local stakeholder consultation; - Include a provision allowing the Board or the secretariat to receive information on complaints regarding issues that are not related to the emission reductions or removal enhancements of a registered CDM project activity or PoA for forwarding to the relevant DNA for investigation and assessment and the outcome of such investigation.

11 Updates on status of work under Track 3: Review of the CDM M&P - Introduce a GSC process at the verification stage, allowing comments to be related to any aspects of the PDD and requiring the DOE that conducts the verification to forward the comments on the issues that are not related to emission reductions or removal enhancements to the relevant DNA for investigation and assessment and transfer of the outcome of such investigation to the Board.

Thank you