Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.

Slides:



Advertisements
Similar presentations
Transportation Day at the Capitol Jon Chiglo, Director of Engineering Services Minnesota Department of Transportation February 23, 2012.
Advertisements

Minnesotas Congestion Pricing Program Road User Charging Conference January, 2009 By Bernie Arseneau Minnesota (USA) Department of Transportation.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
Urban Partnership Agreement Summary Metropolitan Council Meeting September 12, 2007.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
Kenneth R. Buckeye, AICP Minnesota Department of Transportation.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration Department of Transportation Enabling Congestion Pricing in the.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Jeffrey F. Paniati Executive Director Federal Highway Administration US Department of Transportation Washington, DC Reducing Congestion Tools of.
Tolling and Congestion Pricing Patrick DeCorla-Souza Office of Innovative Program Delivery Federal Highway Administration Presentation to Transportation.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Part 2: Congestion Pricing Policy Development
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
University of Minnesota FUSING PUBLIC AND PRIVATE TRUCK DATA TO SUPPORT REGIONAL FREIGHT PLANNING AND MODELING Chen-Fu Liao Minnesota Traffic Observatory.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Urban Partnership Agreement Summary August 27, 2007.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
The Transit “T” Craig Lamothe UPA Transit Project Manager City of Minneapolis City of Lakes Innovative Choices for Congestion Relief.
TRB Transportation Applications Conference Congestion-Free Freeways US Department of Transportation Establishing a Metropolitan.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
High-Occupancy Toll (HOT) Lanes Recent Developments Planning and Operations Committee September 9, 2005.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Mn/DOT Metro District 20- Year Highway Investment Plan Update: (Adopted: December 21, 2011) FHWA and Georgia Operations Summit and Planning for.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
FAST Lanes Program Transportation and General Government Policy Committee Association of Metropolitan Municipalities August 16, 2004 Minnesota Department.
Brian Kary Minnesota Department of Transportation.
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
MnPASS I-394 High Occupancy Toll (HOT) Lanes Case Study 7 group: Brendon Slotterback Chris Romansky Feng Xie Gabe Gubash
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
US DOT Congestion Initiative Urban Partnership Agreements NTOC Summer Meeting September 7, 2007 Washington, DC Jeffrey F. Paniati Associate Administrator,
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Minneapolis Regional Chamber of Commerce, Critical Issues Forum Charlie Zelle, Commissioner Minnesota Department of Transportation.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
1 December 12, 2007 I-35W Bridge Response Plan Update.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Regional Transportation Management Center Shared Operations Center – Mn/DOT Traffic Operations – Mn/DOT Maintenance Dispatch – State Patrol Dispatch 400.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Travel Reliability – Reliable traffic flow is more important than reducing congestion – traffic congestion is often a sign of an area’s economic vitality.
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Brian Kary Minnesota Department of Transportation.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
Brian Kary Freeway Operations Engineer. Active Traffic Management.
AASHTO – SCOPM Palm Desert, California October 23, 2009 Mn/DOT Performance Management - Setting our Direction.
Transportation Revenue Sources Presentation to the Discovery Institute October 6, 2004 Amy Arnis Deputy Director Strategic Planning and Programming Washington.
Beyond Oil Transforming Transportation: A National Demonstration Project Breakout Session: A New Paradigm - Future of Transportation, Funding, and Climate.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Integrating Transit and Highway Solutions In High Volume Corridors
Charlotte Region Fast Lanes Study
Nick Wood, P.E. Texas A&M Transportation Institute
Using iPeMS Performance Management Data
Presentation transcript:

Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012

Overview Minnesota / Twin Cities Metro Area Innovations in Planning Innovations in Traffic Management and Safety MnPASS Active Traffic Management Lower cost solutions Toward Zero Deaths Summary

Twin Cities

Background As the region grows, increased travel demand on our aging infrastructure will continue to create additional transportation challenges – Preservation- pavement and bridges – Safety – Congestion

Funding constraints Increased need for pavement and bridge funding Adding capacity to fully eliminate congestion would cost more than $40 billion over next 20 years If used alone, state gas tax would need more than $2 per gallon increase for mobility

State Road Construction Program

Innovations in Planning Investment Strategies for Mobility – Managed Lanes (MnPASS) – Active Management (ATM) System-wide – Lower Cost/High-Benefit Improvements – Strategic Capacity Expansion

Regional Transportation Management Center Backbone for Managed Lanes system and ATM Shared Operations Center – Mn/DOT Traffic Operations – Mn/DOT Maintenance Dispatch – State Patrol Dispatch 400 miles of freeway management system

MnPASS System

Congestion Pricing in Minnesota Congestion pricing brand name Opened 11 mile High Occupancy Toll (HOT) lane on I- 394 in 2005 Opened 16 mile HOT lane in two phases in on I-35W as part of the Minnesota UPA project Future I35E segment planned 2016

MnPASS operates only during peak rush hours – Peaks are defined as 6 to 10 AM and 2 to 7 PM M-F – Off peak and weekend lanes are free and open to all Buses, carpools(2+) and motorcycles use for free during peak rush hours How does MnPASS work?

Solo drivers can choose to use for a fee – Fees range from.25¢ to $8.00 – Fees average between $1.25 and $1.50 Lane use is enforced by State Patrol Free flow speeds (50-55mph) are maintained through dynamic pricing How does MnPASS work? cont.

MnPASS Dynamic Pricing Price based on congestion in MnPASS lane- real time data from pavement loop detectors Number of vehicles in lane Speed of the vehicles Rate of change of traffic conditions Dynamic pricing provides reliability Pricing is set to produce reliability, not to maximize revenue

MnPASS I-394 Lane Design

I 35W- Priced Dynamic Shoulder Lane (PDSL): Segment 3: 3 miles Priced Dynamic Shoulder Lane North of 42 nd St on NB 35W Maintains existing 4 lanes with an added PDSL Lane Effectively extends the MnPASS lane to downtown Minneapolis using existing road space

Innovative Use of Technology and Infrastructure Managed Lanes And Priced Dynamic Shoulder Lane (PDSL)

I-35W MnPASS: Active Traffic Management

I-35W: The 21 ST Century Highway Integrated & Innovative –I-35W MnPASS System –Priced Dynamic Shoulder Lane –Smart Lanes –Bus Rapid Transit and Stations –Integrated Park and Rides –Low cost/high benefit capacity Results in Sustainable Congestion-Free Choices for Travelers

Low Cost/High Benefit Example I-94 at McKnight Road Congestion and crash problems in 4-lane segment between two 6- lane segments Converted to 6-lane freeway section within existing R/W for under $10M 4/1 Benefit/cost based on congestion savings alone

Toward Zero Deaths Minnesota’s primary traffic safety initiative Partnership between the Departments of Transportation, Public Safety and Health; local traffic safety partners; and the University of Minnesota, led by the University’s Center for Transportation Studies

TOWARD ZERO DEATHS

Summary Innovation in planning, management of transportation through MnPASS, active traffic management Challenges- changes in attitude How can we learn from others’ experience?

Pat Bursaw, Minnesota DOT