© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#76 Meeting Arrangement 24 - 28 Aug, 2015 Beijing, China Tuomo Säynäjäkangas.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1196r1 Submission Data Rate and Spectrum Requirements for IEEE aj (45 GHz) Date: Authors: Haiming Wang (SEU)Slide.
Advertisements

Way forward for LTE DL 4Rx AP SI on RF
Way Forward Proposals for Inter-band CA Consisting of B41
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#73 UE RF AH Meeting Arrangement Jan, 2015 Oulu, Finland Tuomo.
Doc.: IEEE /0272r0 Submission February 2011 Ron Porat, Broadcom Outdoor Path Loss Models for ah Date: Authors: Slide 1.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#75 Meeting Arrangement May, 2015 Fukuoka, Japan Tuomo Säynäjäkangas.
Doc.: IEEE r1 Submission May Vertical Application TAG May 2015 Meeting Tim Godfrey, EPRISlide 1.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
Doc.: IEEE 802.RR-01/017-r1 Submission November 2001 Vic Hayes, Agere SystemsSlide 1 Opening report Radio Regulations to Radio Working Groups November.
WF on BS MMSE-IRC receiver
All Rights Reserved, Copyright©2008, FUJITSU LIMITED. and FUJITSU LABORATORIES LIMITED. REV Technology Considerations for LTE-Advanced 3GPP TSG.
Doc.: IEEE /0251r0 Submission February 2011 Ron Porat, Broadcom Outdoor Channel Models for ah Date: Authors: Slide 1.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
Doc.: IEEE /0398r0 Submission March 2012 Slide 1 Date: Authors: CWPAN Response to IEEE China MM-Wave (CMMW) Study Group.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
Questions about LAA deployment scenarios DocumentIEEE Submitted Source Roger B. Marks BaiCells capable.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#77 Meeting Arrangement Nov, 2015 Anaheim, CA, US Tuomo Säynäjäkangas.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 © 3GPP 2015 RP-15xxxx What Tuomo and his team achieved 1 3GPP TSG RAN Meeting #70 Sitges,
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Doc.: IEEE /0024r0 Submission Feedback on 3GPP CRs: LAA Multi-Channel Access and Energy Detect (ED) Coexistence Slide 1 Date: Authors:
Doc.: IEEE /129r0 Submission May 2000 Vic Hayes, Lucent TechnologiesSlide 1 Report from the Regulatory ad-hoc meeting doc 00/124 Vic Hayes.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel (ECSG Chair)
Submission doc.: IEEE /0156r0 January 2016 Joseph LEVY (InterDigital)Slide 1 IMT-2020 Discussion Review and Straw Polls Date: Authors:
Submission doc.: IEEE /0455r1 March 2016 Joseph Levy (InterDigital)Slide 1 Report on 802 EC 5G SC activities for Date: Authors:
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement May, 2016 Nanjing, China Xutao Zhou.
Meeting arrangement Two parallel sessions from Tuesday to Thursday
Offline discussion on remaining details on RRM measurements
1210 MHz of harmonised spectrum (ECC framework)
Way Forward on UE measurement definition and capability
WF on UL Transmission for Difficult Band Combinations in LTE-NR DC
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
WF on single switched TX UL
CWPAN Response to IEEE China MM-Wave (CMMW) Study Group
Initial workplan on NR spectrum
WF on single switched TX UL
September 2015 Opening Report
WF on single Tx switched UL
Single Tx switched UL Qualcomm, Intel DRAFT RP GPP RAN #77
WF on measurement capability and measurement gap for NR
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
R : SRS Enhancements for LTE-A
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
3GPP RAN WG1 Chairman Matthew Baker
RAN5#57 RF Group Timetable – v1
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
Nakamura, Takaharu / Fujitsu Issam Toufik/ MCC technical support
Nakamura, Takaharu / Fujitsu
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on UE mandatory channel bandwidth for NR bands
WF on scenarios and evaluation assumptions for flexible duplex
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
WF on LTE-NR DC with UL coexistence
3GPP RAN4#79AH Meeting Arrangement
EXECUTIVE SUMMARY CA combinations are divided into intra-band (contiguous and non-contiguous) and inter-band. Aggregated carriers can be adjacent or non-adjacent.
Scoping Out CA CA(Carrier Aggregation) is a technique used to combine multiple Long ‐ Term Evolution (LTE) component carriers (CCs) across the available.
Antennas Topologies Directly connecting two duplexers together can affect each other’s filter characteristic, thereby losing the isolation that is needed.
LTE-Advanced New UE Categories[4] LTE-Advanced New UE Categories[4]
Mobile Synchronization Trends 4G to 4.5G to 5G
“Predictive Mobile Networks”
5G Micro Cell Deployment in Coexistence with Fixed Service
WF on LTE-NR Coexistence
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
EURECOM 5G Experimental Site
Current Status of submission about EUHT
Performance Evaluation of Channel Access Mechanisms in 6 GHz Spectrum
Presentation transcript:

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#76 Meeting Arrangement Aug, 2015 Beijing, China Tuomo Säynäjäkangas RAN4 Chairman

SLIDE 1 Meeting arrangement Common session Mon morning and Fri afternoon (Conference Hall C) RF and frequency bands Mon - Fri (Conference Hall C) RRM and demodulation Mon – Fri (Function Room 2) Slide 1

SLIDE 2 Tdoc request guideline 3GU tool will be used for both Tdoc number request and submission Note the separate deadlines for Tdoc request and submission! Deadline for Tdoc number request is 10:59 pm UTC on Thu 13 Aug 2015 In case of problems secretary will allocate CR numbers and provide Tdoc list by 10:59 pm UTC on Fri 14 Aug 2015 Deadline for Tdoc submission is 10:59 pm UTC on Mon 17 Aug 2015 NOTE: The deadlines are hard deadlines Tdoc requests received after deadline will be considered as late Documents missing the submission limit will be considered as late Slide 2

SLIDE 3 Document handling guideline Documents missing Tdoc submission deadline 10:59 pm UTC on Mon, 17 Aug will be marked as late and won’t be treated Please pay attention to presentation time => brief summaries Chairmen will distribute meeting minutes daily Revisions / new tdoc numbers allocated only by the judgment of the chairmen During meeting the deadline for tdoc request is Thu, 27 Aug, end of the meeting session During meeting the deadline for tdoc submission is Fri, 28 May, 2:00 pm Note: Inbox will be closed at 2:00 pm Please pay attention when you use the reflector to circulate draft documents. If the attachment name matches the pattern ‘R4-14xxxx.zip’, it will be automatically uploaded to the 3gpp ftp server as an official document Only official Tdocs (with proper number) from the inbox/documents folder are formally discussed in the meeting Slide 3

SLIDE 4 Monday, 24 Aug, 2015 Slide 4 Venue Time Conference Hall CFunction Room 2 9:00-10:301. Opening of the meeting 2. Approval of the agenda & elections (1) 3. Letters / reports from other groups / meetings (23) LTE 4DL RX / Rel ind (2) 7.13 LAA to unlicensed spectrum (1) 7.14 LTE CAEnh beyond 5 carriers (2) 13. Any other business (4) 11:00-13: E-UTRA UE RF (core / EMC) (10) E-UTRA UE-UE co-existence (2) E-UTRA UE CA requirements (13) E-UTRA UE Other corrections (4) E-UTRA UE Other specifications / Rel ind (5) 4. BS spec improvements (1) UTRA BS RF (core/conformance/EMC) (16) LTE TDD eIMTA general (2) LTE TDD eIMTA / Demod (4) LTE D2D Proximity services / RRM (9) LTE D2D Proximity services / Demod&CSI (20) 14:00-16: E-UTRA BS RF (core/conformance/EMC) (42) MSR BS RF (core/conformance/EMC) (17) 5.2 BS RF (core/conformance/EMC) (2) BS RF E-UTRA (3) UE-UE co-ex (15) UE CA requirements (13/22) LTE D2D Proximity services / Demod&CSI (cont) 6.3 NAICS for LTE (7) NAICS UE demodulation (11) NAICS UE CSI (7) 16:30-18: UE CA requirements (continue) Other requirements (11) Pcell mandatory support (13) 5.7 Operating bands (6) 6.3 NAICS (continue) FE LTE MTC UE RRM (21) 18:30-21:00 (ad-hoc) AAS (Chair: Richard Kybett) D2D RRM / demod (Chair: Valentin Gheorghiu)

SLIDE 5 Tuesday, 25 Aug, 2015 Slide 5 Venue Time Conference Hall CFunction Room 2 8:30-10: LTE UE TRP &TRS General (3) LTE UE TRP &TRS Hand phantom (8) LTE UE TRP &TRS LEE (2) 7.3 LTE MIMO OTA intro (23) 7.4.1&2 UE UL 64QAM general (5) 9.1 FS LTE 1980_2170 Korea (10) 8.1 / 2GHz LTE band for Region1 (6/11) Dual connectivity Enh for LTE / RRM (26) 11:00-13:008.1 / 2GHz LTE band for Region1 (continue) 8.2 AWS Ext band for LTE (5) MHz LTE band for Arab region (5) MHz band for China (4) LAA to unlicensed spectrum / general (2/16) 7.5 CRS IM for LTE / UE demod&CSI (18) 9.4 High speed scenario (78) 14:00-16: LAA to unlicensed spectrum / general (continue) LAA to unlicensed spectrum / UE RF (10) LAA to unlicensed spectrum / BS RF (11) 7.15 LTE Intra Band C CA in Band 5 (4) 7.16 LTE Intra Band C CA in Band 8 (16) 7.17 LTE Intra Band C CA in Band 42, 4DL (11) 7.18 LTE Intra Band NC CA in Band 4 (3) 9.4 High speed scenario (continue) LTE DL 4RX / RRM (10) LTE DL 4RX / Demod (7) 16:30-18: LTE Intra Band NC CA in Band 5 (4) 7.20 LTE Intra Band NC CA in Band 41, 4DL (3) 7.21 LTE Intra Band NC CA in Band 41, 4DL (2) 7.22 Inter Band Carrier Aggregation: Big CRs (8) Inter Band CA: Class A1-A4 (9) FS on LTE CA B20+B28 (2) 7.28 LTE CA 700EU+B20 (13) LTE 2UL inter-band CA (4) LTE DL 4RX / Demod of PDSCH (10) LTE DL 4RX / Demod of control channels (15) LTE DL 4RX / CSI (3) 18:30-20:30 (ad-hoc) LTE MIMO OTA (Chair: Anatoliy Ioffe) NAICS (Chair: Craig Burnet)

SLIDE 6 Wednesday, 26 Aug, 2015 Slide 6 Venue Time Conference Hall CFunction Room 2 8:30-10:30 (Steven Chen chair RF) 7.2 Active Antenna Array System (5) General OTA (3) EIRP accuracy and beam declaration (15) OTA sensitivity requirements (14) 7.10 Multiflow enhancements / Demod (5) LTE D2D enhancements / RRM (13) 11:00-13:00 (Steven Chen chair RF) Conducted TX requirements (25) Conducted RX requirements (4) Specification organisation and reqs (3) Testing requirements (13) 7.12 MC load distribution for LTE / RRM (15) LAA to unlicensed spectrum / RRM (11) 14:00-16: LTE 2UL inter-band CA FDD-TDD / Big CRs (4) 7.35 LTE 3DL/2UL inter-band CA (11) 7.36 LTE 3DL/2UL mixed intra/inter-band CA (3) 7.37 HSPA 2UL / UE RF (6) LTE 3-Band CA General / Big CRs (14) Inter-band 2DL combinations (2) Inter-band 3DL combinations (6/10) 9.5 Measurement gap enhancement (19) 16:30-18: Inter-band 3DL combinations (continue) LTE 4-Band CA general / Big CR (8) LTE 4-Band CA 4DL combinations (10) LTE TDD-FDD CA 2DL intra (1) LTE TDD-FDD CA 2DL inter (16/23) LTE CAE beyond 5 carriers/ RRM&DM (6) LTE CAEnh beyond 5 carriers / RRM (10) 18:00-20:30 (ad-hoc) LAA RF (Chair: Chris Callender) UE CA RF / Pcell support (Chair: Hiromasa Umeda) LTE MIMO OTA in parallel as informal discussions High speed scenario (Chair: Xizeng Dai)

SLIDE 7 Thursday, 27 Aug, 2015 Slide 7 Venue Time Conference Hall CFunction Room 2 8:30-10: LTE TDD-FDD CA 2DL inter (continue) LTE TDD-FDD CA 3DL combinations (15) LTE TDD-FDD CA 4DL combinations (9) 7.41 WF on MSD calculation for CA (5/10) 9.3 B41 HPUE for +26 dBm (7) B41 HPUE impacts on other bands (1) B41 HPUE impacts on RF reqs (4) FE LTE MTC UE max power (2/5) LTE Intra Band C CA in Band 42 for 4DL / RRM (3) LTE Intra Band NC CA in Band 41 for 4DL RRM (1) 7.22 Inter Band Carrier Aggregation: Big CR UE demod (1) 7.34 LTE 2UL inter-band CA FDD-TDD / RRM (2) 7.6 MMSE-IRC for LTE BS (17) 11:00-13: FE LTE MTC UE max power (continue) FE LTE MTC UE re-tuning (5) FE LTE MTC UE RF (1) LTE 4DL RX general / bands (2) LTE 4DL RX UE RF (3) LTE 3DL/2UL CA RRM (1) HSPA 2UL CA RRM (2) LTE 3-Band CA RRM (2) LTE 4- Band CA RRM (3) LTE 4-Band CA UE demod (2) LTE TDD-FDD CA RRM/demod (4)7.6 cont Indoor positioning enh for UTRA and LTE (2) 14:00-16: LTE D2D enhancements / General (5) LTE D2D enhancements / UE RF (3) Pcell mandatory support (after AH) LAA to unlicensed spectrum (after AH) 7.3 LTE MIMO OTA agreements (after AH) 11. Revision of the work plan (2) E-UTRA Essential Correction / RRM (6) E-UTRA / UE demod (24) 5.3 Rel-12 corrections and TEI / RRM (50) 5.4 Rel-12 corrections and TEI / UE demod (37) 16:30-18: Indoor positioning enh for UTRA and LTE (9) RF, 2nd Round Remaining 1 st round document 18:00-20:30 (ad-hoc) UE CA RF / MSD (Chair: Gene Fong) 2 GHz LTE band (Chair: Edgar Fernandes) 4RX RRM / demod (Chair: Chris Callender) MMSE-IRC for LTE BS (Chair: Xizeng Dai)

SLIDE 8 Friday, 28 Aug, 2015 Slide 8 Venue Time Conference Hall CFunction Room 2 8:30- 10:30 RF, 2nd Round 5.3 Rel-12 corrections and TEI / RRM (continue) 5.4 Rel-12 corrections and TEI / UE demod (37) 11:00- 13:00 RF, 2nd Round RRM / demod, 2nd round 14:00- 15:30 RF, 3rd RoundRRM / demod, 3rd round 15:30- 17: Liaison and output to other groups (1) 11. Revision of the work plan (23) 12. Future meetings (0) 13. Any other business (4) 14. Close of the meeting