Cost Effective GIS Implementation for Municipalities “Wisconsin Land Information Association Annual Conference – Applications Track” February 13, 2003.

Slides:



Advertisements
Similar presentations
KEYS TO SUCCESS DATA PREPARATION AND ORGANIZATION
Advertisements

Building a Working Organizational GIS Central Coast Joint Data Committee GIS Basics Workshop March 26, 2003.
Cost Estimation System Tool
GIS in Connecticut Education and Training Working Group.
Asset Management and Sewer Engineering Using GIS Integrated with Document Management in San Francisco Greg Braswell - City & County of San Francisco, Bureau.
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
Seth Clark Principle GeoData Analytics, LLC GIS For Asset Management & GASB 34 Pavement Management Our mission To enable both public and private organizations.
June 11, 2008West Virginia GIS Conference 2008 Integration of Mobile GIS Technologies in the West Virginia Department of Environmental Protection Bond.
GIS for Environmental Science
Facility Profiler North Dakota Department of Health- Environmental Health Section Gary Haberstroh
 Background\History  GIS Manager Roles  Projects  Game Plan.
Visions of a Truly Green Eugene GIS 248 Final Project By: Lindsey Mendell.
Presented By: By: By: Web Address: Topic Number: Topic Number: Date: Date:
Building a GIS with Limited Resources VILLAGE OF LOMBARD Daniel Price, GIS Technician David Dratnol, Village Engineer.
GIS On A Budget: Simple Applications for Real World Solutions Marty Scholl Calaveras County Environmental Health 10 th Annual LEA/CIWMB Conference October.
Westchester County GIS Overview Westchester County Municipal Administrators Association Luncheon November 14, 2001.
GIS for Asset Management at United Arab Emirates University
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
Esri UC 2014 | Technical Workshop | Data Alignment and Management in ArcMap Lisa Stanners, Sean Jones.
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
Developing & Maintaining Utilities in GIS Kendis Scharenbroich Pro-West & Associates.
Introduction to ArcGIS for Environmental Sciences Day 2 – Fundamentals Module 8 Creating & Editing Data Creating Metadata.
GROUP 4 FATIN NUR HAFIZAH MULLAI J.DHANNIYA FARAH AN-NUR MOHAMAD AZUWAN LAU WAN YEE.
March 14, 2007 First Steps For Starting Your Parcel Database: Aurora Case Study Indiana GIS Conference Dearborn County GIS Ileana Abot.
Ref: Geographic Information System and Science, By Hoeung Rathsokha, MSCIM GIS and Remote Sensing WHAT.
Parcel Data Models for the Geodatabase
September 18-19, 2006 – Denver, Colorado Sponsored by the U.S. Department of Housing and Urban Development Using Geographic Information Systems (GIS) as.
George Washington Birthplace NM: Geodatabase Development for Resource Management and Planning Bill Slocumb GIS Specialist and Research Associate North.
How does a community maintain a storm
Indianapolis/Marion County GIS & DigSmart Ryan R. Johnson March 8, 2006.
GIS Implementation Planning WLIA Workshop Agenda Introductions Overview of the GIS Implementation Process Break Waukesha Case Study Wrap up.
Practical Applications for Highway Infrastructure and Asset Management Prepared by: Steven J. Hook, Noble County GIS Coordinator 101 N Orange St. Courthouse,
Introduction In ArcGIS, there are three basic data structures:
Copyright 2010, The World Bank Group. All Rights Reserved. COVERAGE, FRAMES & GIS, Part 2 Quality assurance for census 1.
Enterprise GIS A Multi User System Jefferson County, Illinois.
GIS Business Case and Geodatabase Review Solid Waste Authority April 2, 2008.
An Address Mapping Application An Example of City & County Cooperation by the Middleton Fire District & Dane County Land Information Office.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
[Milwaukee County Enterprise GIS Migration Project] presented by: Kevin White, GIS Supervisor – Milwaukee County Scott Stocking, Systems Analyst – GeoAnalytics.
Page 1 Integrated Base Mapping Management at the City of Calgary Presented by : Leanne James ALS P.Eng. Supervisor of Cadastral Mapping, Land Information.
How do we represent the world in a GIS database?
The 2000 Decennial Census School District Project: Using Census Data for the School District Mapping System **** Development and Implementation Tai A.
Utility Applications Sabeshan Srinivasan SIE 510 GIS Applications February 3, 2004.
Utilizing Handheld GIS Technology Wisconsin Land Information Association Annual Conference.
Welcome to Sewers 101. Providing Sanitary Sewer Collection and Treatment since 1945 Johnson County Wastewater Your friends in the Sewer Business For More.
Wausau Department of Public Works - GIS Division Application of GIS Technology to Municipal Utility Operations Developing a Digital Inventory for Water,
Steve Gay - GIS Manager Mid America Regional Council Kansas City, MO.
Cost Effective Addressing With ArcPAD 6. Green County, WI Mostly Rural County- Population 34,000 Approximately 24,000 parcels 576 square miles.
Wisconsin Land Information Association Annual Conference Handheld - Mobile GIS Application.
Monroe County Health Department Septic Inspection Using ArcPad and Trimble GeoXT Monroe County, Indiana Population:110,000 + Square Miles: 418 Land Parcels:
112 East Main Street Frankfort, Kentucky tel Fax
Weighing the Costs and Benefits of Parcel Mapping Presenters: Annette Theroux Pro-West & Assoc., Inc. WLIA Annual Conference 2002.
Pro-West & Associates Utilities On The Move Kendis Scharenbroich GIS Consultant Pro-West & Associates.
INTRODUCTION TO GIS  Used to describe computer facilities which are used to handle data referenced to the spatial domain.  Has the ability to inter-
City of Woodcreek, TX Project Proposal GEO 4427 Advanced GIS II.
DATA Spatial Data – where things are Non Spatial Data or Attribute Data – What things are Data in a computer database are managed and accessed through.
Susan Blake – Infrastructure Information Coordinator, City of Sarasota Utilities Department Cameron Amrine – GIS Analyst, Stantec November 5, 2015 Creating.
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
Jason Mirtl Monroe County Surveyor’s Office Health Services Building 119 West 7 th Street Bloomington, IN Room 201 Phone:
“It’s Not a Sprint – It’s a Marathon” GIS 101 For Local Government ICIT Midyear Conference June 17, 2010 Jeff Miller, Dubuque County Matt Boeck, Story.
Introduction to Geodatabases
GIS CONSULTANT SERVICES · RFP# · JUNE 18, 2015
McCracken and Paducah Geographic Information System
GIS Basic Training June 7, 2007 – ICIT Midyear Conference
INTRODUCTION TO GEOGRAPHICAL INFORMATION SYSTEM
For the San Diego County Region September 2007
GIS On A Budget: Simple Applications for Real World Solutions
Asset Management Journey
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

Cost Effective GIS Implementation for Municipalities “Wisconsin Land Information Association Annual Conference – Applications Track” February 13, 2003

Presentation Outline w Discussion –Typical GIS Uses for Municipalities –Implementation Strategies –Challenges –Software/Innovations –Cost Saving Measures w Implementation Examples –City of Chetek –Village of Albany –City of Barron

Typical GIS Uses w Mapping –Parcel –Utilities (water, sanitary, storm, electric) –Buildings –Facilities –Environmental Areas –Assets (vehicular, personnel, aerial,etc.) w Facilities management –All mapping elements –Inventory control –Asset management

Typical GIS Uses w Environmental/Safety –Management/monitoring –Modeling –Spill/Hazardous Materials Incidents –Emergency Response w Map production w Applications

Process for GIS Implementation w Needs assessment w Implementation plan w Acquire technology w Pilot project w Mapping w Final GIS system w Documentation – user and system manuals w Continually maintaining, updating, and adding

Implementation Questions? How much budget do you have? What tasks can you complete? What data exists? Who owns the data? ?? How do I acquire it? What software is needed? Can your system handle it? Data accuracy and coordinate system?

Implementation Strategies  Phased  Complete  Internal  External  Integrated – Multiple Departments  Cooperative – Multiple Agencies

Implementation Strategies  Needs drive projects  Zoning Map  Utility Needs  Infill/Infiltration Issues  GASB34  State reporting  HazMat Response

Challenges of Implementation

Other Typical Challenges... w Identification of barriers – technical and institutional w An implementation plan should be a living document w Funding w Systems administration, IT systems, training and data architecture

Cooperation is KEY

Software/Applications Bring It All Together Soils Parks/Historical Zoning Watersheds Utilities D O Q / Photo School Districts Village Boundary Land Use Wetlands/NWI Roads Base Map Geodetic Reference

Several Options Exists For GIS Software and Use  ArcExplorer  DataView  ArcView  Arc Editor  ArcInfo  Other GIS Software Packages  Internet/Intranet Applications

Future of GIS w Simple/easy to access information w Palm computers w Cellular w Handheld GPS w Geodatabases w SDE

Internet/Intranet GIS

Case Studies City of Chetek Village of Albany City of Barron

Case Studies City of Chetek

Chetek Project Objective w Develop a GIS (Geographic Information System) for managing the City of Chetek w Introduce the City of Chetek to software that links information so individuals can: –Locate parcels for notification –Locate utility items easily –Map additional items –Easily incorporate information from other studies –Buffer Hazardous Spills –Emergency Management w Budget Constraints - $5,000.00

Project Development Steps in Completing Project w Planning/Needs Analysis Meeting w Review of existing data w Acquisition of data layers from other entities w Convert system layers to Baron County Coordinate System. w Create Other Layers w Develop a database (attribute tables) pertinent to the system’s characteristics in Microsoft Access w Convert utility cad information to shapefile format

Existing Data w CAD Data –Water Distribution System –Sanitary Sewer System –Storm Sewer System w GIS Layers –Parcel information from Barron County –Zoning information from Regional Planning Commission –Orthophotography from Barron County

Nomenclature w The City of Chetek had no systematic numbering system for features within their water distribution system or sanitary sewer system. w The city divided their boundaries into quarters for numbering and locational purposes. w City staff redlined large plots with numbering/naming schemes for each data layer.

Data Layers w Parcels w Lots w Subdivisions (boundaries and text) w Right-of-Ways w Hydrologic Features w Water Distribution System w Sanitary Sewer System w Storm Sewer System w Zoning

Water Data Layer Attributes

Storm and Sanitary Sewer Data Layer Attributes

Parcel Data Layer Attributes

Locating New Features w The city plans to purchase the ESRI/Trimble GeoXT/ArcPad bundle for locating new features and creating new data layers w City staff want to do a large part of the work for new data layer creation

Software Database SoftwareGIS Software  Microsoft Access  Ease of use  Easy to learn  Compatibility with ESRI products  Interface with water billing software  Allows for custom reporting  DataView ®  Easy to Implement  Easy to learn/No Formal Training Needs  ESRI product (Map Objects)  Connectivity to Microsoft Access

Software DataView ®

Attribute Tables w Each layer contains an attribute table (dbf file associated with shapefiles) w Each layer also contains a table in Microsoft Access for storing additional information

Future Plans w Chetek completed a Downtown Transportation Study –Sidewalk Locations –Parking Locations –Accidents –Traffic w Water system flow information w Additional Layer Creation

Continuing The Implementation w The Needs Assessment identified more data layers w The City has performed a prioritization and budgeting schedule for a multi-year implementation w The City intends to purchase ArcView to expand their GIS capabilities. w The City staff have already been working within the application daily in the Public Works, Building Inspection, City Clerk, Police and Fire Departments, with the intent on increasing this until staff are using the system several times daily.

Case Studies Village of Albany

Albany Project Objective w Initial need was a paper zoning map w Develop a simple GIS (Geographic Information System) – The Village previously aquired AutoCad Map, which they found too complicated for their purposes. w Integrate existing cad files that were scanned and converted to vectors from hard copy mapping w The Village wanted a software that links information so individuals can: –Locate parcels for notification –Locate utility items easily –Map/integrate police call information w Budget Constraints - $3,000.00

Project Development Steps in Completing Project w Review of existing data w Acquisition of data layers from other entities w Convert system layers to Green County Coordinate System w Link county assessment data to the parcel map w Develop a database in Microsoft Access for attribute information w Allow for editing/input of zoning codes into the database easily w Convert utility cad information to shapefile format

Existing Data w GIS Layers –Green County Parcel Information –Green County Orthophotography w CAD Data –Water Distribution System –Sanitary Sewer System

Nomenclature w The Village had a systematic numbering system for features within their water distribution system and sanitary sewer system. w The Village had divided their boundary in half (based on the river location that splits the village) for numbering and locational purposes previously.

Data Layers w Parcels w Hydrologic Features w Water System w Sanitary Sewer System w Zoning

Water Data Layer Attributes

Sanitary Sewer Data Layer Attributes

Parcel Data Layer Attributes

Locating New Features w The Village does not have capabilities of locating new or additional features accurately with gps or surveying technology. w The Village will use a consultant to update the mapping from asbuilt construction plans.

Software Database SoftwareGIS Software  Microsoft Access  Ease of use  Easy to learn  Compatibility with ESRI products  Interface with County tax assessment listing  Allows for custom reporting  DataView ®  Easy to Implement  Easy to learn/No Formal Training Needs  Uses ESRI shape file format  Connectivity to Microsoft Access

Software DataView ®

Attribute Tables w Each layer contained an attribute table (dbf file associated with shapefiles) w Each layer also contains a table in Microsoft Access for storing additional information

Future Plans w DataView is meeting the Village’s needs. w The Village is planning to add an updated zoning layer.

Case Studies City of Barron

Barron Project Objective w Locate and view utility information readily w Develop a GIS (Geographic Information System) for managing the City of Barron w Introduce the City of Barron to software that links information so individuals can: –Locate parcels for notification –Locate utility items easily –Map additional items –Easily incorporate information from other studies –Complete locates in the field easily w Budget Constraints - $25,000.00

Project Development Steps in Completing Project w Planning/Needs Analysis Meeting - Informal w Review of existing data w Acquisition of data layers from other entities w Locate manholes, hydrants and valves using GPS w Convert system layers to Baron County Coordinate System w Develop a database (attribute tables) in Microsoft Access w Convert utility information from wall maps to digital format

Existing Data w No CAD Data w GIS Layers –Parcel information from Baron County –Zoning information from Regional Planning Commission –Orthophotography from Baron County w Stick-pin maps on wall at the electrical utility building

Nomenclature w The City of Barron had a systematic numbering system for features within their water distribution, sanitary sewer and electrical distribution systems. w City staff redlined large plots with numbering/naming schemes for each data layer where new/unnamed items were located.

Data Layers w Parcels w Hydrologic Features w Water System w Sanitary Sewer System w Electrical Distribution System w Zoning

Locating New Features w The City doesn’t have the capability of locating new or additional features with gps or survey. w The City will use a consultant to update the mapping using construction asbuilts.

Software Database SoftwareGIS Software  Microsoft Access  Ease of use  Easy to learn  Compatibility with ESRI products  Interface with water billing software  Allows for custom reporting  DataView ®  Easy to Implement  Easy to learn/No Formal Training Needs  Uses ESRI shapefile format  Connectivity to Microsoft Access

Attribute Tables w Each layer contained an attribute table (dbf file associated with shapefiles) w Each layer also contains a table in Microsoft Access for storing additional information

Future Plans w This technology is new to Barron and they will require time to get it integrated into their day to day use.

Summary w A GIS implementation is more than a software purchase w A GIS should be designed to fit your needs w You don’t need to do it all at once w An effective approach to GIS implementation will reduce the project’s cost w You can implement a GIS on your budget

Cost Effective GIS Implementation for Municipalities For more information contact: Jon Schwichtenberg or Glen Ausse or or