Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 6 Integration Management “Bringing it all together”

Slides:



Advertisements
Similar presentations
Chapter 4: Project Integration Management
Advertisements

Project Integration Management
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
Copyright 2009  Develop the project charter: working with stakeholders to create the document that formally authorizes a project—the charter  Develop.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Project Scope Management
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Dr. L. K. Gaafar The American University in Cairo
Chapter 4: Project Integration Management
Chapter 5: Project Scope Management
Project Integration Management
Project Management CIS 486 Fall 2005 Week 3 Lecture Dr. David Gadish
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Course Technology Chapter 3: Project Integration Management.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Chapter 4: Project Integration Management
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Learning Objectives Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life.
Project Scope Management
Project management INTRODUCTION. Information Technology Project Management, Fourth Edition 2 IT projects have a terrible track record. A 1995 Standish.
Lecture 2_3: Project Integration Management
Prof. Ahmed Sameh 1 Week 4 Project Integration Management.
Copyright Course Technology 1999
PMP® Exam Preparation Course
Software Project Management
Project Integration Management Chapter 4. Copyright 2014 The Key to Overall Project Success: Good Project Integration Management Project managers must.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Chapter 4: Project Integration Management
Project Scope Management Process
Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 Topic 4 Requirements Specification Integration Management.
Chapter 5: Project Scope Management Information Technology Project Management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Chapter 4: Project Integration Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
P ROJECT I NTEGRATION M ANAGEMENT. It involves coordinating all the other project management knowledge areas throughout a project’s life cycle This integration.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Copyright Course Technology Chapter 3: Project Integration Management.
Project Initiation and Integration
Slide 1ICT 327 Management of IT ProjectsSemester 2, 2004 Topic 11 Executing & Controlling Projects.
Project Management Basics
Chapter 4: Project Integration Management Information Technology Project Management, Fourth Edition.
IF 308 Manajemen Proyek Perangkat Lunak. The Key to Overall Project Success: Good Project Integration Management  Project managers must coordinate all.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Information Technology Project Management, Seventh Edition.
Chapter 4: Project Integration Management Information Technology Project Management, Fourth Edition.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
The Project Management Process Groups
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Chapter 4: Project Integration Management Information Technology Project Management, Fourth Edition.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Chapter 3: Project Integration Management Doddy Prayogo, Ph.D.
Software Project Management
Project Management PTM721S
Chapter 4: Project Integration Management
Project Integration Management
Project Management Process Groups
Requirements Specification Integration Management
Chapter 4: Project Integration Management
Chapter 3: Project Integration Management
Chapter 4: Project Integration Management
Presentation transcript:

Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 6 Integration Management “Bringing it all together”

Slide 2ICT 327 Management of IT ProjectsSemester 1, 2005 Reading Essential Schwalbe Chapter 4 Recommended PMBOK Chapter 4

Slide 3ICT 327 Management of IT ProjectsSemester 1, 2005 Learning Objectives At the end of this topic, you should be able to: Describe an overall framework for project integration management as it relates to the other project management knowledge areas and the project life cycle Describe project plan development, including project plan content, using guidelines and templates for developing plans, and performing a stakeholder analysis to help manage relationships Explain project plan execution, its relationship to project planning, the factors related to successful results, and tools and techniques to assist in project plan execution

Slide 4ICT 327 Management of IT ProjectsSemester 1, 2005 Learning Objectives At the end of this topic, you should be able to: Understand the integrated change control process, planning for and managing changes on information technology projects, and developing and using a change control system Describe how software can assist in project integration management

Slide 5ICT 327 Management of IT ProjectsSemester 1, 2005 Definition Integration “Combining parts into a whole” Oxford English Dictionary

Slide 6ICT 327 Management of IT ProjectsSemester 1, 2005 Question What are the tools and activities a project manager uses to bring a project together?

Slide 7ICT 327 Management of IT ProjectsSemester 1, 2005 Example Rock concert Catering & facilities Stage management (act, lighting, sound) Ticketing Crowd control & security How are these different areas brought together for the event?

Slide 8ICT 327 Management of IT ProjectsSemester 1, 2005 The Key to Overall Project Success Good Project Integration Management Project managers must coordinate all of the other knowledge areas throughout a project’s life cycle Many new project managers have trouble looking at the “big picture” and want to focus on too many details Project integration management is not the same thing as software integration

Slide 9ICT 327 Management of IT ProjectsSemester 1, 2005 Question What is project integration? What is software integration?

Slide 10ICT 327 Management of IT ProjectsSemester 1, 2005 Project Integration Management Processes Project Plan Development: taking the results of other planning processes and putting them into a consistent, coherent document—the project plan Project Plan Execution: carrying out the project plan Integrated Change Control: coordinating changes across the entire project

Slide 11ICT 327 Management of IT ProjectsSemester 1, 2005 Project Integration Management Overview Note: The PMBOK® Guide 2000 includes similar charts for each knowledge area.

Slide 12ICT 327 Management of IT ProjectsSemester 1, 2005 Framework for Project Integration Management Focus on pulling everything together to reach project success!

Slide 13ICT 327 Management of IT ProjectsSemester 1, 2005 Project Plan Development A project plan is a document used to coordinate all project planning documents Its main purpose is to guide project execution Project plans assist the project manager in leading the project team and assessing project status Project performance should be measured against a baseline plan

Slide 14ICT 327 Management of IT ProjectsSemester 1, 2005 Question How do you determine where you are up to in the semester for this unit? What do you use as indicators of progress? What do you use to integrate the different aspects?

Slide 15ICT 327 Management of IT ProjectsSemester 1, 2005 Attributes of Project Plans Just as projects are unique, so are project plans Plans should be: Dynamic Flexible Updated as changes occur Plans should first and foremost guide project execution

Slide 16ICT 327 Management of IT ProjectsSemester 1, 2005 Common Elements of a Project Plan Introduction or overview of the project Description of how the project is organized Management and technical processes used on the project Work to be done, schedule, and budget information

Slide 17ICT 327 Management of IT ProjectsSemester 1, 2005 Sample Outline for a Software Project Management Plan (SPMP)

Slide 18ICT 327 Management of IT ProjectsSemester 1, 2005 What the Winners Do "The winners clearly spell out what needs to be done in a project, by whom, when, and how. For this they use an integrated toolbox, including PM tools, methods, and techniques…If a scheduling template is developed and used over and over, it becomes a repeatable action that leads to higher productivity and lower uncertainty. Sure, using scheduling templates is neither a breakthrough nor a feat. But laggards exhibited almost no use of the templates. Rather, in constructing schedules their project managers started with a clean sheet, a clear waste of time." * Milosevic, Dragan and And Ozbay. “Delivering Projects: What the Winners Do.” Proceedings of the Project Management Institute Annual Seminars & Symposium (November 2001)

Slide 19ICT 327 Management of IT ProjectsSemester 1, 2005 Stakeholder Analysis A stakeholder analysis documents important (often sensitive) information about stakeholders such as stakeholders’ names and organizations roles on the project unique facts about stakeholders level of influence and interest in the project suggestions for managing relationships

Sample Stakeholder Analysis “likes Mexican food” “Suggestions on Managing relationship ”

Slide 21ICT 327 Management of IT ProjectsSemester 1, 2005 Question How would you be best managed? What motivates you? What keeps you happy? How could this information be useful for your Project Manager?

Slide 22ICT 327 Management of IT ProjectsSemester 1, 2005 Project Plan Execution Project plan execution involves managing and performing the work described in the project plan The majority of time and money is usually spent on execution The application area of the project directly affects project execution because the products of the project are produced during execution

Slide 23ICT 327 Management of IT ProjectsSemester 1, 2005 What Went Wrong? Many people have a poor view of plans based on past experiences. Senior managers often require a plan, but then no one follows up on whether the plan was followed. For example, one project manager said he would meet with each project team leader within two months to review their plans. The project manager created a detailed schedule for these reviews. He cancelled the first meeting due to another business commitment. He rescheduled the next meeting for unexplained personal reasons. Two months later, the project manager had still not met with over half of the project team leaders. Why should project members feel obligated to follow their own plans when the project manager obviously did not follow his?

Slide 24ICT 327 Management of IT ProjectsSemester 1, 2005 Important Skills for Project Execution General management skills like leadership, communication, and political skills Product skills and knowledge (see example of “What Went Right?” on p. 120) Use of specialized tools and techniques

Slide 25ICT 327 Management of IT ProjectsSemester 1, 2005 Tools and Techniques for Project Execution Work Authorization System: a method for ensuring that qualified people do work at the right time and in the proper sequence Status Review Meetings: regularly scheduled meetings used to exchange project information Project Management Software: special software to assist in managing projects

Slide 26ICT 327 Management of IT ProjectsSemester 1, 2005 Question The best way to handle change? Where do changes come from?

Slide 27ICT 327 Management of IT ProjectsSemester 1, 2005 Integrated Change Control Integrated change control involves identifying, evaluating, and managing changes throughout the project life cycle Three main objectives of change control: 1.Influence the factors that create changes to ensure they are beneficial 2.Determine that a change has occurred 3.Manage actual changes when and as they occur

Slide 28ICT 327 Management of IT ProjectsSemester 1, 2005 Integrated Change Control Process

Slide 29ICT 327 Management of IT ProjectsSemester 1, 2005 Change Control on IT Projects Former view: The project team should strive to do exactly what was planned on time and within budget Problem: Stakeholders rarely agreed up-front on the project scope, and time and cost estimates were inaccurate Modern view: Project management is a process of constant communication and negotiation Solution: Changes are often beneficial, and the project team should plan for them

Slide 30ICT 327 Management of IT ProjectsSemester 1, 2005 Change Control System A formal, documented process that describes when and how official project documents and work may be changed Describes who is authorized to make changes and how to make them Often includes a change control board (CCB), configuration management, and a process for communicating changes

Slide 31ICT 327 Management of IT ProjectsSemester 1, 2005 Change Control Boards (CCBs) A formal group of people responsible for approving or rejecting changes on a project CCBs provide guidelines for preparing change requests, evaluate change requests, and manage the implementation of approved changes Includes stakeholders from the entire organization

Slide 32ICT 327 Management of IT ProjectsSemester 1, 2005 Making Timely Changes Some CCBs only meet occasionally, so it may take too long for changes to occur Some organizations have policies in place for time-sensitive changes “48-hour policy” allows project team members to make decisions, then they have 48 hours to reverse the decision pending senior management approval Delegate changes to the lowest level possible, but keep everyone informed of changes

Slide 33ICT 327 Management of IT ProjectsSemester 1, 2005 Freezes It may be necessary to freeze other projects For example, an intranet may require a content ‘freeze’ while the underlying platform is changed. If one project is dependent on another, it may be necessary to freeze the dependent project.

Slide 34ICT 327 Management of IT ProjectsSemester 1, 2005 Configuration Management Ensures that the products and their descriptions are correct and complete Concentrates on the management of technology by identifying and controlling the functional and physical design characteristics of products Configuration management specialists identify and document configuration requirements, control changes, record and report changes, and audit the products to verify conformance to requirements

Slide 35ICT 327 Management of IT ProjectsSemester 1, 2005 Managing Integrated Change Control Suggestions: View project management as a process of constant communications and negotiations Plan for change Establish a formal change control system, including a Change Control Board (CCB) Use good configuration management Define procedures for making timely decisions on smaller changes Use written and oral performance reports to help identify and manage change Use project management and other software to help manage and communicate changes

Slide 36ICT 327 Management of IT ProjectsSemester 1, 2005 Software in Project Integration Management Several types of software can be used to assist in project integration management Word processing: Documents production (templates) Presentations: with presentation software Spreadsheets or databases: Tracking (activities, time) , websites and groupware: For communication Project management software: can pull everything together and show detailed and summarized information (see Appendix A for details)

Slide 37ICT 327 Management of IT ProjectsSemester 1, 2005 Example Summary Gantt Chart