© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Chapter 18.

Slides:



Advertisements
Similar presentations
Implementing Quality Concepts
Advertisements

CHAPTER 20 USING ACCOUNTING FOR QUALITY AND COST MANAGEMENT 1st 1st.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
CHAPTER 6 Cost Management in an Automated Business Environment ABC, ABM, and TQM.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 1.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 5 Activity-Based Costing and Management.
Contrôle Interne Avancé-HEC Lausanne- 2007/ Thème 6 Pricing Decisions and Cost Management.
INTRODUCTION TO BUSINESS
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19.
Quality, Time, and the Theory of Constraints
Copyright © 2007 Prentice-Hall. All rights reserved 1 Activity-Based Costing and Other Cost Management Tools Chapter 24.
Chapter 6: Activity Based Management and the New Manufacturing Environment Identify the true costs of resources consumed in performing the organization’s.
Hilton Maher Selto 7 Managing Quality and Time to Create Value McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Managing Quality and Time to Create Value
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19 May.
1 Cost Analysis Control costs –Improve cost structure – problems show up Cost structure – relative proportion of each type of cost – fixed, variable, mixed.
Improving Productivity & Quality
Copyright © 2007 Prentice-Hall. All rights reserved 1 Activity-Based Costing and Other Cost Management Tools Chapter 5.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Cost Management in an Automated Business Environment (ABC, and TQM) Chapter 6.
Activity-based Cost Management
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Management Accounting in a Changing Environment Chapter Fourteen.
Management Accounting in a Changing Environment
Chapter Seven Activity-Based Costing and Management
Chapter 5 Activity-Based Management. 1. How can reasonably accurate product and service cost information be developed? 2. What are the differences among.
Managing Quality and Time to Create Value
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
© 2016 Pearson Education, Inc.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
CHAPTER 4 Strategic Management of Costs, Quality, and Time
1 CHAPTER 18 MODERN DEVELOPMENTS IN MANAGING OPERATIONS.
Value-Based Systems: ABM and Lean 22. Value-Based Systems and Management OBJECTIVE 1: Explain why managers use value-based systems and discuss their relationship.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 10/19/ Cost Management.
Chapter 7 Activity-Based Costing and Management
C Learning Objectives Power Notes 1.Just-in-Time Principles 2.Applying a Just-in-Time Approach 3.Accounting for Just-in-Time Operations 4.Accounting.
0 CHAPTER 15 The Strategic Use of Managerial Accounting Information © 2009 Cengage Learning.
Chapter 18 New Developments. Quality more important than ever! s ISO 9000 s TQM philosophy –Strives for 100% quality - no defects.
Use with Management and Cost Accounting 9e by Colin Drury ISBN © 2015 Colin Drury Part Five: Cost management and strategic performance management.
Copyright © 2013 Nelson Education Ltd.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
CHAPTER 6 TOTAL QUALITY MANAGEMENT. QUALITY AS A PHILOSOPHY As competitive weapon that must be produced efficiently : high performance design and consistency.
Chapter Ten An Introduction to Management Accounting © 2015 McGraw-Hill Education.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Allocating Overhead Chapter 16 … “Job Order Costing”: allocated overhead using Pred. Overhead Rate with Direct Labor as an allocation.
ACTG 4310 Chapter 10 – Fundamentals of Cost Management.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Lecture 19.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Activity-Based Costing and Management
Do you think that it is costly to convert from a traditional processing environment to a just-in-time processing environment? 1.Yes 2.No.
Chapter 16 Managing costs and quality
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 17. Develop activity-based costs (ABC)  Refines the way indirect costs are allocated to production  Focuses on costs incurred by each production.
The Strategic Use of Managerial Accounting Information
Copyright © 2003 McGraw-Hill Ryerson Limited, Canada 1-1 Management Accounting: A Value-added Discipline Chapter 1.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 9 1.
Table 1: Comparison of Management and Financial Accounting.
Chapter 12 Performance Evaluation Using the Balanced Scorecard.
© The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin.
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
CECE FICCI Quality Costs & Profit Chapter no.2 CECE FICCI Many people think that quality costs money and adversely effects profits. But these costs are.
Chapter 26 Managerial Accounting Concepts and Principles.
Chapter 27 Cost Management for Just-in-Time Environments
Fundamentals of Cost Management
Fundamentals of Cost Management
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Chapter 18

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin R & D and Design Suppliers and Production Distribution and Marketing Customer Service The value chain is the set of activities and resources necessary to create and deliver products and services valued by customers. The Value Chain—Focus on Core Operations

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Non-value-added activities add cost without additional desirability, and can be eliminated without reducing quality or performance. Value-added activities add to product or service desirability in customers’ eyes. IdentifyEliminate Non-value- added activities Value and Non-value-Added Activities

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Analysis and Classification Activities Value and Non-value-Added Activities Non-value- Added Activities Reduce or Eliminate Value- Added Activities Continually Evaluate and Improve

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Examples of non-value- added activities are: Storage of materials, work-in-process, or finished goods. Moving parts and materials in the factory. Waiting for work. Inspection. Get rid of them! Non-value-Added Activities

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin What’s the difference between activity-based costing and activity-based management? Activity-Based Management — Drive Out Costs

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Activity-based management focuses on managing activities to reduce costs. Activity-based costing establishes relationships between overhead costs and activities. Activity-Based Management — Drive Out Costs

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Analyze activities Collect benchmark information Determine cost per unit of activity Identify activity measures Create cost pools Identify activities Activity-based costing Activity-based management ABC: a Subset of Activity-Based Management

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  Chart activities needed to meet customer expectations.  Use ABC to determine cost of activities.  Classify all activities as value-added or non-value-added.  Improve value-added activities and eliminate non-value-added activities. Activity-Based Management and the Value Chain

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Let’s move along to a new topic. The Target Costing Process — Creating Customer Satisfaction

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Focused on design. Consideration given to the entire value chain. Focused simultaneously on profit and cost planning. Driven by the customer. Target costing is aimed at the earliest stages of new product and service development. The Target Costing Process — Creating Customer Satisfaction

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Concept development Planning and market analysis Production design and value engineering Production and continuous improvement Target price Profit margin Target cost Establishing the Target Price Attaining the Target Cost The Target Costing Process

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Price Major Influences on Target Pricing

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  Develop products that satisfy customer needs.  Set target price using competitors’ prices and customers’ perceived value for product.  Target price – Profit margin = Target cost  Use value engineering to find least costly combination of resources to meet customer needs. Developing target prices and target costs requires four steps: Components of the Target Costing Process

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Life- cycle costing  Research, design, and development  Production  Marketing  Product discontinued and customer support ends Life-Cycle Product Costing and Pricing

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Pricing must generate revenue to cover costs of all phases of product life cycle.  Research, design, and development  Production  Marketing  Product discontinued and customer support ends Life-Cycle Product Costing and Pricing

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  Involve entire value chain in reducing costs while satisfying customer needs.  An understanding of relationships between process components and costs is critical.  A product’s functional characteristics to the customer are emphasized.  A primary objective is reducing development time.  ABC is used to determine changes that will reduce costs. Characteristics of Target Costing Processes

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Let’s move along to another topic. Just-in-time (JIT) Inventory Procedures

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Complete products just in time to ship to customers. Complete parts just in time for assembly into products. Schedule production. Receive customer orders. Receive materials just in time for production. Just-In-Time (JIT) Inventory

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Less warehouse space needed Reduced inventory carrying costs Reduced risk of obsolete inventory With reduced inventories, quality must be emphasized to avoid production delays and late deliveries. Relationship Between JIT and Total Quality Management (TQM)

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin More rapid response to customer orders Greater customer satisfaction Higher quality products Less warehouse space needed Reduced inventory carrying costs Reduced risk of obsolete inventory Relationship Between JIT and Total Quality Management (TQM)

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  A limited number of suppliers who will make on-time deliveries of quality materials.  Quality that is “designed-in” and “manufactured-in” rather than “inspected-out”.  A well-trained flexible work force.  An efficient plant layout. Successful implementation of a JIT system requires: JIT, Supplier Relationships, and Product Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Manufacturing Cycle Time Process Time + Inspection Time + Storage and Waiting Time + Move Time ProductionS tarted Goods Shipped Only the process time is value-added time. Measures of Efficiency in a JIT System

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Manufacturing Cycle Time Process Time + Inspection Time + Storage and Waiting Time + Move Time ProductionS tarted Goods Shipped Manufacturing Efficiency Ratio Value-added time Manufacturing cycle time = Measures of Efficiency in a JIT System

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin If cycle time goes up, costs may go up, and service and quality may go down. Measures of Efficiency in a JIT System

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Let’s move to the last topic in the chapter. Total Quality Management and the Value Chain

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Greater customer satisfaction Quality products and services Increased business volume Why is Quality Important?

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  Prevention costs  Inspection of materials upon delivery  Inspection of production process  Equipment inspection  Employee training  Appraisal costs  Finished goods inspection  Field testing of products  Prevention costs  Inspection of materials upon delivery  Inspection of production process  Equipment inspection  Employee training  Appraisal costs  Finished goods inspection  Field testing of products Components of the Cost of Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  Internal failure costs – defects discovered before delivery to customers  Scrap materials  Rework  Reinspection of rework  Lost sales resulting from late deliveries  Internal failure costs – defects discovered before delivery to customers  Scrap materials  Rework  Reinspection of rework  Lost sales resulting from late deliveries Cost Report Components of the Cost of Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin  External failure costs – defects discovered after delivery to customers  Warranty repairs  Product liability  Marketing costs to improve product image  Lost sales due to poor product quality  External failure costs – defects discovered after delivery to customers  Warranty repairs  Product liability  Marketing costs to improve product image  Lost sales due to poor product quality Components of the Cost of Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Cost of prevention and appraisal Internal and external failure costs Components of the Cost of Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Cost of prevention and appraisal Internal and external failure costs Ultimate Objective: Zero defects while minimizing all four quality cost categories. Components of the Cost of Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Prevention and Appraisal External and Internal Failure Total Cost of Quality Low QualityHigh Quality Cost of Quality Direction of recent trend in industry. Components of the Cost of Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Traditional managerial accounting systems may emphasize production quotas and cost minimization. Managers often find that emphasis on quality also increases productivity. Productivity and Quality

© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin I’m managing some quality time in a value-added activity. End of Chapter 18