Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.

Slides:



Advertisements
Similar presentations
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures OCC – Chapter 6.
Advertisements

The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures HBA – Chapter 6.
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Update on FHWA/FTA Proposed Rulemaking. MAP-21 Requirements Section 1318(a)(3) o Solicit requests from state DOTs, transit authorities, and MPOs, for.
Environmental Commitments Categorical Exclusion Training Class.
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Cultural Resources Categorical Exclusion Training Class.
The Lifecycle of Grants: Environmental Review November 7, 2012.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
1 CDBG and Environmental Review For Grant Administrators.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
ODOT – FHWA Environmental Performance Measures February 2012.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Project Prospectus and Design Acceptance Package ( and a little more) Alan Lively Project Delivery Specialist January 30, 2009.
2011 CDBG Recipients’ Workshop COMPLIANCE 9:30EnvironmentalRick 10:30BREAK 10:45Wage Rate ProvisionsMary Alice 11:00Uniform Acquisition Robert 11:15Conflict.
Presented to: Hershey Aviation Conference By: Ed Gabsewics, Charlie Campbell & Suki Gill Date: March 3, 2010 Federal Aviation Administration Environmental.
The National Environmental Policy Act (NEPA)
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
EPA!!!!.  One of the first laws ever created to protect the environment  Came into effect due to public concern about the deteriorating human environment.
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
MassDOT P3 Project Overview. MassDOT Project Mobility.
What does an Environmental Professional Do?
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Environmental Review Process for Responsible Entities 24 CFR Part 58.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
UNDERSTANDING TITLE VI RESPONSIBILITIES AND PITFALLS November 16, 2005.
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Community Context Audits And Public Involvement Plans Rickie Clark, INDOT Joyce Newland, FHWA Presenter Title, INDOT Event Date.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation May 2004.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
1 CDBG and Environmental Review For Local Officials.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
Section 4(f)/6(f) Categorical Exclusion Training Class.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Categorical Exclusion Training Class
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
National Environmental Policy Act Environmental Engineer US Army Garrison.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Section 4(f) Categorical Exclusion Training Class.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
FCC’s NEPA Process Overview of NEPA Overview of NEPA Overview of FCC’s NEPA rules and procedures Overview of FCC’s NEPA rules and procedures Nuts and bolts.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
National Environmental Policy Act and Endangered Species Act Compliance in the Bureau of Land Management.
Programmatic Agreements
FCC’s NEPA Process Overview of NEPA
ACA Conference - September 2017
Construction Management & Inspection
National Environmental Policy Act (NEPA)
22 CFR 216 A Brief Walk Through
Unit 6 NEPA.
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Cultural Resources Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Section 4(f) Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Environmental Requirements and planning grants
The National Environmental Policy Act (NEPA)
NEPA Assignment Program Overview
Presentation transcript:

Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout

NEPA Decision Documents Environmental Impact Statement :  Record of Decision (ROD) Environmental Assessment:  Finding of No Significant Impact (FONSI) Categorical Exclusion:  CE Closeout

Categorical Exclusions (CE) Start: Part 3 Environmental Surveys/Permits End: CE Closeout

Part 3 of the Prospectus Role  Project Classification (EIS, EA, CE)  Documentation Requirements Components  Narrative  Checklist Type of Projects  “c” and “d” list

Q: So, are we done with NEPA? A: Not even close!

CE Closeout Role:  Confirms Project Classification (EIS, EA, CE)  Includes Required Documentation  Verifies Type of CE (“c” or “d” list)  Signifies completion of NEPA process Should also include:  Changes in project scope  Avoidance and minimization measures  Environmental commitments

Programmatic CE No significant environmental impacts No unusual circumstances Does not involve:  More than minor amounts of R/W  Residential or commercial displacement  Adverse effect of historic resource  Coast Guard permit or individual Corps permit  Work encroaching on floodway or affecting 100-year flood elevation Does not involve:  Work in or adjacent to Wild and Scenic River  More than minor wetland impacts  Change in access control  Use of temporary road, detour or ramp closure  Known hazmat site  Goal exception Conforms with Air Quality State Implementation Plan Consistent with Oregon Coastal Zone Management Plan Does not involve federally-listed T&E species or critical habitat

CE Approvals Categorical Exclusion:  REC  ODOT Environmental Manager  FHWA Environmental Program Mgr. Programmatic Categorical Exclusion:  REC  ODOT Environmental Manager Once these documents are signed, NEPA has been completed.

When is the CE Closeout Needed? Prior to start of right of way process (if federal funds are used) Prior to approval of construction funds

Things to remember: Include copies of all required environmental documents, such as:  No Effect memo or BO  Section 106 documents  4(f) documentation Include a copy of the Part 3 Include a project location map

For more information: ftp://ftp.odot.state.or.us/techserv/Geo-Environmental/ Environmental/Procedural%20Manuals/ Region%20Environmental%20Coordination/ ce_closeout_guidance.doc