New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Discussion Topics Brief history of structural stormwater management The Low Impact Development (LID) alternative to ponds, ponds, ponds… LID for Hydromodification.
Upper Providence Township Stormwater Management MS4 Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Preparing a Stormwater Control Plan Stormwater C.3 Guidebook 6 th Edition.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
6 th Edition CCCWP Management Committee February 15, 2012.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, EOA, Inc. Illicit Discharge Stormwater Inspector Training Workshop April 24, 2013.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Background and Overview Stormwater NPDES Compliance For New Developments.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
MRP Steering Committee Meeting April 24, 2006 New and Redevelopment Performance Standards Sue Ma S.F. Bay Regional Water Quality Control Board.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Low Impact Development for Compliance with NPDES Treatment and Hydrograph Modification Management Requirements in Contra Costa County Tom Dalziel, Assistant.
Countywide Model SUSMP July 17, Topics SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements NPDES Permit Requirements Model SUSMP.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
NC Phase I Perspective Steps undertaken by Charlotte for Post-Construction Controls SC Stormwater Forum May 8, 2007.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
LOW IMPACT DEVELOPMENT APPROACHES
Phase II National Storm Water Regulations What’s in it for you?
From the Beginning Design Standards and Other Post-Construction Program Elements.
STORMWATER MANAGEMENT
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Stormwater Runoff: 101 Natural groundcover absorbs, slows and filters rainwater; pavement and rooftops do not. Heavier and faster runoff leads to heavier.
1 Provision C.3. New and Redevelopment Performance Standards Sue Ma Water Quality Control Board San Francisco Bay Region November 15, 2006.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Sustainable Vineyard Practices Replanting Strategies & Economics December 13, 2012 Conditional Waiver of Waste Discharge Requirements Vineyards in Napa.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
City of Clarksville Storm Water Management Manual Revisions 2014.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Total Maximum Daily Load Program
Sacramento County Stormwater Quality Program
MS4 OVERVIEW 2015.
Sacramento County Stormwater Quality Program
Presentation transcript:

New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005

Protecting Water Quality 1. Why managing stormwater is important. 2. What we are doing now. 3. How new development affects water quality. 4. How the new regulations will be implemented.

What is a watershed?

Managing Stormwater Runoff  Preventing Stormwater Pollution Toxic pollutants like mercury and PCBs Toxic pollutants like mercury and PCBs Sediment, oil and grease Sediment, oil and grease Household pesticides and detergents Household pesticides and detergents

Managing Stormwater Runoff  Preventing Stormwater Pollution Toxic pollutants like mercury and PCBs Toxic pollutants like mercury and PCBs Sediment, oil and grease Sediment, oil and grease Household pesticides and detergents Household pesticides and detergents  Quantity and timing of runoff Paved, impervious roofs, parking, and streets Paved, impervious roofs, parking, and streets Increased volume of flow and peak flow rate. Increased volume of flow and peak flow rate.

Who is involved?  Stormwater management activities are coordinated throughout City departments.  City participates in and cooperates with the Contra Costa Clean Water Program. CCCWP includes 18 other Contra Costa cities and towns, Contra Costa County, and the Flood Control District. CCCWP includes 18 other Contra Costa cities and towns, Contra Costa County, and the Flood Control District.  Oversight by the California Regional Water Quality Control Board (SF Bay Region).

What the City is Doing Now  Complies with storm water discharge permit.  Inspects businesses.  Minimizes pollutants from City activities.  Contributes to monitoring & pollution- prevention studies.  Conducts outreach and education.

Municipal Stormwater NPDES Permit History  1994: First countywide permit issued. Focus on public outreach and education.  1999: Permit revised, added performance standards for implementation  February 2002: Revised Permit Provision C.3. (New and Redevelopment Requirements)

Effects of New Development

Runoff Before Development

Runoff After Development

Effects of increased runoff  Increased flows and more frequent flooding leads to…  Increased streambank erosion, which leads to…  “Hardening” to prevent erosion, which leads to…

Loss of Stream Functions

Solutions  Design areas that allow runoff to infiltrate into soil.  Use pervious paving.  Integrate shallow detention basins into landscaping.  Use narrower streets; minimize impervious surface area.

Solutions

Vegetated (“Dry”) Swale

New Regulations for Development and Redevelopment  Provision C.3. Requirements:  Projects (public & private) must detain or treat runoff on site.  Projects with 1 acre or more impervious surface approved after February 15, 2005  Projects with 10,000 square feet or more impervious surface approved after Oct  Mandated design criteria for volume and flow

Cities, towns & County must:  Estimate and control future increases in peak runoff  Verify that on-site treatment devices are maintained  Update conditions of approval, design standards, General Plans, & environmental review processes

Contra Costa’s Approach C.3 Oversight Committee Clean Water Program (Cities, Towns, County, CCFCWCD)

Preparations for C.3  Update to Model Stormwater Ordinance  Stormwater C.3 Guidebook Require a Stormwater Control Plan for planning and zoning review Require a Stormwater Control Plan for planning and zoning review Show how drainage from site will be routed through treatment facilities Show how drainage from site will be routed through treatment facilities  Memos on technical and policy issues  Workshops for staff and applicants

C.3 & Development Review Pre-ApplicationMeetingCompletedApplication“DeemedComplete” SectionReview CEQAReview Conditions of ApprovalPlanningCommission DetailedDesign Plan Check PermitstoBuild

Stormwater C.3 Compliance Pre-ApplicationMeetingCompletedApplication“DeemedComplete” SectionReview CEQAReview Conditions of ApprovalPlanningCommission DetailedDesign Plan Check PermitstoBuild Staff identifies general C.3 requirements Section staff may review Stormwater Control Plan along with site, grading, landscaping and other plans Stormwater Control Plan is attached to COAs Staff reviews implementation of Plan in drawings & specs Does applicant’s Stormwater Control Plan address all req’ts?

Operation & Maintenance StormwaterControlPlanStormwater Facilities Operation & Maintenance Plan Stormwater Facilities Compliance Certificate Submitted with Planning & Zoning Application Draft submitted with construction documents Renewed each year General description of O&M requirements Detailed description and maintenance plan for each facility Certification of inspection & continued operation

Stormwater Control Plan Contents  Project Setting  Measures to Limit Imperviousness  Selection & Design of Treatment BMPs  Source Control Measures  Permitting and Code Compliance  BMP Maintenance  Construction Plan C.3 Checklist  Certification

More Information  Quick Summary Stormwater Quality Control for Development Projects (2-page fact sheet) Stormwater Quality Control for Development Projects (2-page fact sheet)  Summary of Project Review Process Stormwater C.3 Regulations Fact Sheet (4 pages; includes checklist) Stormwater C.3 Regulations Fact Sheet (4 pages; includes checklist)  Stormwater C.3 Guidebook Overview and step-by-step instructions for preparing a Stormwater Control Plan Overview and step-by-step instructions for preparing a Stormwater Control Plan  Guidebook Appendices and References With hyperlinks to design and technical resources With hyperlinks to design and technical resources