LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program.

Slides:



Advertisements
Similar presentations
Investing in the future ESRC Funding Opportunities Michael Bright, ESRC.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
St. Thomas Early Learning Center Our school is a place where young children come to play, learn and explore God’s creation with a sense of wonder and excitement.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
July 7, 2008SLAC Annual Program ReviewPage 1/23 LHC Accelerator Research at SLAC T. Markiewicz SLAC Department Head (9/2008) LARP Accelerator Systems Division.
Striving To Be Your Best: Budgeting To Be Your Best.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Discussion Items 06 November 2009 LARP CM13 Port Jefferson, NY Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
PROJECT BUDGETING The overall goal in the budgeting process of a project is to determine how much money is to be spent each week or each month. PERT /
Eric Prebys LARP Program Director Jaunary 14, 2009.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
All Hands Meeting FY 2008 Budget Pier Oddone Fermilab December 20, 2007.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
Outline Overview of Activities FY 09 Budget  Changes since baseline budget Fall ’08. FY 09 Budget Status Mid-year Review  FY 09 so far.  Projection.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
DOE Review, June 12, 2006S.Peggs 1 brookhaven - fermilab - berkeley - stanford Status report Highlights Budget New head of Magnet R&D Issues Change Control.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
LHC Commissioning & Upgrades LHC Commissioning & Upgrades as part of LARP Accelerator Systems Vladimir Shiltsev FNAL/AD bnl - fnal- lbnl - slac US LHC.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
Eric Prebys LARP Program Director January 14, 2009.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
LARP Accelerator Systems Status & Plans 19 June 2008 DOE Review, LBNL Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Programmes for Education & Career Development James Purvis Head of Recruitment, Programmes & Monitoring Group HR Department Serbia-CERN Event th.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
 Accelerator Simulation P. Spentzouris Accelerator activity coordination meeting 03 Aug '04.
UWM CIO Office Negotiating a Senior Position Karyn M. Frick, Ph.D. Associate Professor Department of Psychology University of Wisconsin-Milwaukee.
臺綜大 優秀年輕學者策勵營 如何經營研究團隊 中山大學 黃志青 2015 年 7 月 3 日. National Sun Yat-Sen University.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
MICE Project in the US: Completion of Efforts
The LARP Collimation Program
Opportunities for Education & Career Development at CERN
LARP Phase II Secondary Collimator RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
LHC External Collimation Review
LARP Phase II Secondary Collimator RC-0 and RC-1
Presentation transcript:

LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program

LARP DOE Review 06/12/ Shiltsev 2 #1 Show how you are going to spend the Accelerator Systems budget for the remainder of the fiscal year. Show specific actions. [Shiltsev] #5 What are the plans for energizing commissioners and the training of young physicists? Note that the committee felt that Mike Syphers was running late with respect to recruiting. Need to get people in there early. Match up with mentors. [Peggs, Shiltsev] “Home work” AS Questions

LARP DOE Review 06/12/ Shiltsev 3 FY06 Accelerator Systems Budget Accelerator Systems’06 Funding allocation: 3,684k$Accelerator Systems’06 Funding allocation: 3,684k$ Expenses thru 05/31:1,937k$Expenses thru 05/31:1,937k$ Balance:1,739k$Balance:1,739k$

LARP DOE Review 06/12/ Shiltsev 4 Instrumentation: Total 662k$ (M&S 190k$, SWF 425k$, Travel 47k$)Instrumentation: Total 662k$ (M&S 190k$, SWF 425k$, Travel 47k$) Funding balance as of May 31, 2006:650k$ total –LUMI: Labor 81k$/mos x4=325k$; M&S 125k$ (first module); Travel 25k$; Sub-Total 475k$ –TCFB: Labor 14k$/mos x4=56k$; M&S 25k$ (SPS test); Travel 15k$ ; Sub-Total =96k$ Peter may somewhat overspend his budget at BNL –Schottky: Labor 11k$/mos x4=44k$; M&S 40k$; Travel 7k$; Sub-Total 91k$ Commissioning: Total k$ (M&S 27k$, SWF k$, Travel k$) Funding balance as of May 31, 2006:523k$ total –BC: Travel k$ (2x3mos SPS, 2 short), M&S 27k$ (CERN accnt, VC); Sub-Total k$ –IR and HC: Labor k$ (total of 5-7man*mos), Travel 42k$; Sub-total k$ LBNL as a plan for spending their remaining money. Joseph Rasson, Jon Zbasnik and FredericGicquel will be spending 3.5 man months at CERN working on DFBX commissioning FNAL money will be used for commissioning efforts. All of the 5 commissioners slated for next year will spend 1-2 weeks at CERN working in groups so that they will "hit the ground running" There will be an additional 1 month of effort at Fermilab with M.Lamm for oversight, extra 10k$ % at FNAL Collimation: Total k$ (M&S 196k$, SWF k$, Travel 30k$)Collimation: Total k$ (M&S 196k$, SWF k$, Travel 30k$) Funding balance as of May 31, 2006:296k$ total –RadMaps and TCT: Labor 20-40k$ (depending on BNL postdoc) –Irradiation: M&S 16k$ (BLIP studies) Nick Simos ould love to get more (>% of his Labor, part of post doc if found) –RC : Labor 140k$ (ME, PD); M&S 180k$ (Braze, VacParts, Room, Cntrl); Travel 30k$; Sub-Total 350k$ Salaries: Steve Lundgren: $70k Tom&Eric $30k Designer $40k Total $140k Shop: Electricians $7k Brazing $58k Total $65k M&S DAQ+Software $10k Clean room equipment $50k Vacuum parts $20k Test fixture parts $20k Brazing parts $15k Travel $30k Total $145k Excess (if spent) comes out of FY'05->FY06 carryover 172k$ Accelerator Physics: Total k$ (M&S k$, SWF 184k$)Accelerator Physics: Total k$ (M&S k$, SWF 184k$) Funding balance as of May 31, 2006:271 $ total –E-cloud and IR design and Beam-Beam simulations : Labor 46k$/mos x4=184k$ Current rate is about 46k$/mos –Wires: finish construction M&S k$; Labor at FNAL 0k$ (done) M&S uncertainty due to Brookhaven shops which give notoriously unreliable estimates FY06 Accelerator Systems Budget

LARP DOE Review 06/12/ Shiltsev 5 Total: k$Total: k$ –M&S k$ –Labor k$ –Travel k$ Funding balance 05’06:1739k$ Remaining Accel Syst Spendings

LARP DOE Review 06/12/ Shiltsev 6 Current priorities:Current priorities: –“get in” the LHC commissioning system, understand the rople(s) LARP can play, establish working relations –Organize IR and hardware commissioning –Participate in the SPS run (summer ’06), sector test (early 2007) –Have sizeable presence (3-4 people at any given moment) in several months before and several months after the 1 st beam and 1 st collisions and several months after the 1 st beam and 1 st collisions - Establish regular flow of US LARP people #5: Energize Commissioning

LARP DOE Review 06/12/ Shiltsev 7 Scale of the problem:Scale of the problem: –Assume 1,500k$/yr budget –Solution #1: 7FTEsx200k$ +0.1k$ to manage them –Solution #2: 20 3-mos visits/yr x50k$ + 250k$ extra travel expenses and + 250k$ extra travel expenses and + 250k$ to manage them + 250k$ to manage them For the next 4 years: –28 long-termers (>1yr) or –80 short-term visits (3 mos) #5: Energize Commissioning

LARP DOE Review 06/12/ Shiltsev 8 As of now we do have:As of now we do have: –Some 25 names, mostly “short-termers”, of those willing to go Ways to go: –Account Instrumentation people willing to take part in beam commissioning and post-commissioning 5-7 people, needs communication btw L2s –Attract people from Universities: As of now we can think of 2-3 Professors (short termers) and 2-5 students (long- termers) Can be part of lab-centered programs, like FNAL Accel PhD program – More Toohig Fellows: Anticipate ~4 more in the next 3 years - all long termers Pressure on Fellowship Committee to advertise and select – Get more people from Labs… how?: SLAC after PEP-II close-up: 2-3 seniors+2-4 juniors; need OK from the top LBL and BNL: active campaign to attract short-termers (~10-15 total) which may end up in getting ~4-6 youngsters to reside at CERN (hard to count on FNAL – it gives what it can) –Repetitive visits, at least for short termers (x2  40 needed) #5: Energize Commissioning

LARP DOE Review 06/12/ Shiltsev 9 Current plan:Current plan: –Explore previously unexplored possibilities over next ~ 6 mos –Have a review of AS Commissioning plans be the end of 2006 –Plan of actions depending on the outcome (rescale participation plans, new ideas, etc) #5: Energize Commissioning

LARP DOE Review 06/12/ Shiltsev 10 Accel.Syst. Spendings - Overall 1.94M/3.6M=53% thru 05/31/06:

LARP DOE Review 06/12/ Shiltsev 11 Accel.Syst. Spendings - II 348/879=40% thru 05/31/06: 204/500=41% thru 05/31/06: 399/670=60% thru 05/31/06: 985M/1635=60% thru 05/31/06: