Presented by Brooke Dickerson, Of Counsel

Slides:



Advertisements
Similar presentations
Non-Hazardous Secondary Materials Definition: How it Relates to Boiler MACT and CISWI Rules Biloxi, MS ♦ September 13, 2012 Melissa Hillman Justin Fickas.
Advertisements

What’s in a Name: EPA Region VIII’s (Non-)Application of the E&P Exemption to Natural Gas Condensate
Frank Ney RCRA Division. 3 Coal Fly Ash Disaster in Tennessee December 2008.
Hazardous Waste Program Solvent Wipes Rule s – EPA received petitions from industry who stated that the hazardous waste regulations were too.
Definition of Solid Waste (DSW) Update John Crawford, Chief Industrial Waste Compliance Section Office of Land Quality.
Introduction to the Definition of Solid Waste Final Rule Office of Solid Waste, EPA.
Overview of the 2008 Definition of Solid Waste Final Rule Office of Resource Conservation and Recovery.
1 Impact of Non-Hazardous Secondary Materials Rule 2012 Annual ARIPPA Tech Convention August 22, 2012 Presented by: John Slade, Senior Consultant, All4.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Identification of Non- Hazardous Secondary Materials That Are Solid Wastes EPA Proposed Rule April 30, 2010 Osman Environmental Solutions Harrisburg, PA.
1 Joint Commission for Environmental Cooperation and U.S./Mexico Border 2012 Collection and Storage of SLABs December 4, 2007.
Managing Hazardous Solid Waste and Waste Sites
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
Resource Conservation and Recovery Act
Module 7: Management Strategies and Potential ARARs.
Chapter # 1 Introduction To Pollution Prevention.
Solid/Hazardous Waste Exemptions and Exclusions
F006-F008 Metals Reclamation Rule Presentation to SBA Environmental Roundtable Meeting October 21, 2005.
RCRA (Resource Conservation and Recovery Act)
MENTAL HEALTH (AMENDMENT) ACT 2003 Given Royal Assent on 21 October Except for Part 2, the Act came into operation the day after it was given Royal.
Universal Waste Rule 40 CFR Part 273 Promulgated May 11, 1995 (60 FR 25492) Batteries Hazardous Waste Lamps Thermostats Pesticides
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Overview of the Definition of Solid Waste Final Rule NJ DEP Hazardous Waste Handler Seminar June 16, 2010.
OH NO! WHAT DO WE DO NOW. WHAT DO YOU DO WHEN YOU DISCOVER THAT YOU’VE NOT BEEN DOING SOMETHING THAT YOU ARE REQUIRED TO DO? THE STORY OF RCW WATER.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Waste Management Overview & Land Disposal Restrictions.
CCR Final Rule Utility Perspective on Key Compliance Items
Our Creeping Progression to Anaerobic Digestion of Multiple Solid and Sludge Wastes How Regulations, Permitting and Policy are Affecting the Emergence.
Joseph G. Maternowski Moss & Barnett, P.A. Minnesota Environmental Institute April 21, 2011 Minneapolis, Minnesota.
Revised Definition of Solid Waste Rule Jesse Boultinghouse Waste Permits Division May 6, 2015 TCEQ Environmental Trade Fair.
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
TCEQ Environmental Trade Fair
Web Resources Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
Hazardous and Non Hazardous Waste Disposal. Resource Conservation and Recovery Act History of the Act The Resource Conservation and Recovery Act was first.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Understanding the Oil & Gas Exploration & Production Hazardous Waste Definition Exemption Jeff Bowman, TEEX.
By Michelle Hoang Period 2 APES April 30, 2012 The Toxic Substances Control Act of 1976.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Environmental Health and Safety Committee 4-30 Bret Bruhn, Merix Corporation Febuary 2004.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
Copyright J. J. Keller & Associates, Inc. Content may be modified by subscriber per KellerOnline ® service Terms of Use. Hazardous Waste.
RCRA Brownbag Expert Series: The Legitimate Recycling Provision Presented by Mary Beth Sheridan & Kathy Lett, EPA HQ April 6, 2016 Webinar 1.
DISCLAIMER Notice: This presentation has been provided as part of a U.S. Environmental Protection Agency webinar. The document does not constitute EPA.
Waste Management (End of Life Vehicles) Regulations, 2003 What is the current legal situation and how will these Regulations change things Legal Consultants.
Beth Blalock, Asst. Chief Land Protection Branch GEORGIA EPD LAND PROTECTION BRANCH UPDATE MARCH 2016.
Overview of the Surface Mining and Reclamation Act and Designation Process County of San Luis Obispo Office of the County Counsel January 8, 2015.
TCEQ Environmental Trade Fair New TCEQ Rules: E-manifest, Steel Slag, Cathode Ray Tube & Revised Definition of Solid Waste Cynthia Palomares, P.G., P.E.
Department of Environmental Quality Review of 15A NCAC 13A.0101 Hazardous Waste Rules May 12, 2016.
Regulations Under Revision Hazardous Waste
Ohio-Specific Universal Wastes
Lecture (11): Waste Recycling
Overview Recently Adopted Regulations Proposed Regulations
Submittal And Review Of New And Revised Water Quality Standards
Water Quality Standards Submittal & Review Process
2015 Definition of Solid Waste Rule
Introduction to the Definition of Solid Waste Final Rule
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
RCRA Hazardous Waste Program Update Thad Driscoll October 25, 2017.
Resource Conservation and Recovery Act (RCRA)
Solid Waste Handling Standards
Arkansas Environmental Federation
RCRA Regulatory Overview for RPMs
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
Georgia Update Jeff Cown Land Protection Branch
Julie Woosley, Division of Waste Management
Julie Woosley, Division of Waste Management
Presentation transcript:

Presented by Brooke Dickerson, Of Counsel Air & Waste Management Association Southern Section Conference The New Definition of Solid Waste Presented by Brooke Dickerson, Of Counsel

Definition of Solid Waste Under RCRA Subtitle C, Hazardous Wastes are a subset of “Solid Waste”: any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant, or air pollution control facility and “other discarded material” . . .resulting from industrial, commercial, mining and agricultural activities © 2015. Arnall Golden Gregory LLP

History Judicial Debate: when are hazardous wastes destined for recycling by reclamation, particularly Hazardous Secondary Materials, discarded? If not discarded, EPA does not have the authority to regulate under RCRA as a hazardous waste. Regulatory Definition*: abandoned, recycled, inherently waste-like or a military munition Plain Language Definition: disposed, abandoned or thrown away Policy Debate: risk v. benefits from recycling © 2015. Arnall Golden Gregory LLP

Specific and General Exclusions Over time, EPA added specific exclusions for designated wastes and/or uses, e.g. scrap metal, zinc fertilizers and shredded circuit boards. 2008, EPA added general exclusions: Reclaimed by the Generator: Self Implementing but CONDITIONAL Transferred to a separate Reclaimer: Self Implementing but CONDITIONAL Case by Case determination that a material is not “discarded”: Voluntary but subject to EPA consent 2008 Rule Very Controversial: Concern over sham recycling and mismanagement especially in connection with the transfer-based exclusion. © 2015. Arnall Golden Gregory LLP

Obama Administration Changed the regulations defining “Solid Waste”, withdrawing the transfer-based exclusion and replacing it with the option of a VERIFIED RECYCLER EXCLUSION (VARIANCE) or obtaining a RCRA PERMIT. Finalized December 10, 2014 Published 80 FR 1694, January 13, 2015 Effective July 12, 2015 © 2015. Arnall Golden Gregory LLP

General Concept Use objective criteria to determine if the recycler perceives more economic value in recycling the HSM, or less cost by avoiding RCRA treatment, storage or disposal. If meet the conditions, then eligible for the Verified Recycler Exclusion. Does the recycler treat the material as carefully as the analogous raw material? Is the recycling “legitimate”? Is the material a good substitute in the process for a raw material? Is the recycled end product a valuable commodity? © 2015. Arnall Golden Gregory LLP

Retained Rules Any provisions pre-2008 or in the 2008 regulations not addressed in new final rule remain in effect including: pre-existing specific exclusions* “this exclusion does not include the recycling of hazardous secondary materials . . that are used in a manner constituting disposal or used to produce products that are applied to or placed on the land.” *all exclusions now subject to “legitimacy criteria” © 2015. Arnall Golden Gregory LLP

Conditions for Exclusion of HSM 261.4(a)(24) Exclusion of HSM transferred to a PERMITTED facility or to a VERIFIED RECLAMATION FACILITY for the purpose of reclamation (definition of “reclaim” revised), if meet required conditions: no “speculative accumulation” (new definition) only handled by the generator, transporter, intermediate facility or a reclaimer, and not stored more than 10 days at a transfer facility not otherwise subject to material-specific management conditions and no spent lead-acid batteries reclamation is legitimate (new definition) generator meets designated requirements © 2015. Arnall Golden Gregory LLP

Conditions for Exclusion 261.4(a)(24) (cont’d) record keeping (at least 3 years) must be sent to reclaimer designated by generator send confirmation of receipt to generator storage of HSM at least as protective as analogous raw material and must be “contained” (new definition); protective management of residuals financial assurance ***VARIANCE or hazardous waste PERMIT EPA prior to operating. NOTIFICATION to EPA prior to operations then every other year ***NO EXPORTS outside of the US (deleted from 2008 rule) emergency preparedness and response © 2015. Arnall Golden Gregory LLP

Verified Recycler Variance 260.31(d) 30 day public notice and comment, possible public hearing. Fixed term not to exceed10 years. Legitimate Recycling: All 4 factors mandatory 260.43(a) Must provide a useful contribution to the process or the end product/intermediate recycling process must produce a valuable product or intermediate. “recycling processes may consist of multiple steps at separate facilities; if each step results in a valuable product or intermediate “ HSM managed as a valuable commodity Lower or Comparable levels of toxics between the recycled end product/intermediate and analogous raw material (or document and notify that nevertheless legitimate) © 2015. Arnall Golden Gregory LLP

Verified Recycler Variance 260.31(d) (cont’d) Financial Assurance Not Subject to Formal Enforcement Action In prior 3 years or significant non-complier, or provide credible evidence that will manage properly Necessary Equipment and Trained Personnel Emergency Preparedness Management of Residuals Address Potential Risk of Unpermitted Release Include cumulative effects in the area © 2015. Arnall Golden Gregory LLP

Contemplates Partial Reclamation 260.31(c) Definition of “reclaim” revised to include partially reclaimed HSM that must be reclaimed further, if the partial reclamation has produced a commodity-like material, to be determined based on legitimacy criteria and: whether the degree of partial reclamation is substantial whether the partially reclaimed material has sufficient economic value whether it is a viable substitute for a product or intermediate used in subsequent production whether there is a market for the partially reclaimed material whether it is handled to minimize loss © 2015. Arnall Golden Gregory LLP

Additional Revisions Though not subject to closure rules, when discontinue recycling, must treat remainder HSM as hazardous waste. Once violate a condition, the HSM are no longer excluded and become hazardous waste. Even if currently operating under 2008 exclusion, must qualify or get a permit. No exports after the effective date. Some changes to generator-controlled exclusion, case specific variances and non-waste determination. Added a specific, conditional exclusion for 18 designated high-value hazardous spent solvents recycled into commercial-grade products. © 2015. Arnall Golden Gregory LLP

Outstanding Questions Effective immediately in Alaska, Iowa, US Virgin Islands. Other States that never adopted 2008 rule, only required to adopt parts of 2015 rule. ( All but Idaho, Illinois, New Jersey, Pennsylvania, which must adopt whole 2015 rule.) What officials or department will manage the Variance process? How long will approval take? How to confirm that the generators met the conditions? How to manage Interstate Shipments? If reclaimer never stores or treats the received HSM, what kind of a permit could a facility apply for? What will be the status of the rule while being contested in court? Does this rule accurately clarify the meaning of “discarded”? Issue: If not adopted by the state, what rules will apply to a facility? Can EPA enforce nonetheless? © 2015. Arnall Golden Gregory LLP

Brooke Dickerson, Of Counsel For more information: Brooke Dickerson, Of Counsel brooke.dickerson@agg.com 404.873.8632 All rights reserved. This presentation is intended to provide general information on various regulatory and legal issues.  It is NOT intended to serve as legal advice or counsel on any particular situation or circumstance. © 2015. Arnall Golden Gregory LLP