CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.

Slides:



Advertisements
Similar presentations
Quiz – An organic liquid enters a in. ID horizontal steel tube, 3.5 ft long, at a rate of 5000 lb/hr. You are given that the specific.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
CMS CO 2 Cooling System Design Elements Erik Voirin Mark Adamowski Erik VoirinCMS Pixel Mechanical Upgrade1.
Basic Refrigeration Cycle
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Two-Phase Flow Boiling Heat Transfer P M V Subbarao Professor Mechanical Engineering Department Selection of Optimal Parameters for Healthy and Safe Furnace.
HVACR312 - Refrigeration Metering Devices.
Chapter 3.2: Heat Exchanger Analysis Using -NTU method
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical
NOvA Near Water and Dryer System Design and Status
1 Absorber Heat Transfer and Other Issues A Comparison between MICE and the Forced Flow Absorber System Michael A. Green Lawrence Berkeley National Laboratory.
The Centrifugal Pump.
Lesson 15 Heat Exchangers DESCRIBE the difference in the temperature profiles for counter-flow and parallel flow heat exchangers. DESCRIBE the differences.
EGR 334 Thermodynamics Chapter 4: Section 9-10
Product Introduction.
CHE/ME 109 Heat Transfer in Electronics
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
Conservation of Mass, Flow Rates
Vapor and Combined Power Cycles (2)
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Lesson 8 SECOND LAW OF THERMODYNAMICS
1 So far… We’ve developed a general energy balance We’ve developed a general material balance We’ve only actually looked at systems that are under steady.
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
Nuclear Thermal Hydraulic System Experiment
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
So Far: Mass and Volume Flow Rates Reynolds No., Laminar/Turbulent Pressure Drop in Pipes Flow Measurement, Valves Total Head, Pump Power, NPSH This Week:
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Cooling System Solutions
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
Analysis of Flow Boiling
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Heat Transfer by Convection
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
CMS CO 2 Cooling Test Stand Capacity and Load Disruption Tests Simon Kwan Erik Voirin Simon Kwan, Erik Voirin1CMS CO2 Cooling Test Stand Test Results.
Chapter 19 Heat and the First Law of Thermodynamics
Lecture Objectives: Learn about thermal storage systems
IBBelle: Status & Plans
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Conservation of Mass and Energy
Lecture Objectives: Continue with Sorption Cooling
Forum on Tracking Detector Mechanics - Bonn, May 2016
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
HEAT EXCHANGER.
Pixel CO2 Cooling Status
IBBelle: Status Commissioning at MPP Transport to KEK
VELO Thermal Control System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Status Report on Fermilab CO2 cooling activities
Aachen Status Report: CO2 Cooling for the CMS Tracker
ESS elliptical cryomodule
By: JAGDEEP SANGWAN Refrigeration Basics 101.
1 INTERNATIONAL MARITIME COLLEGE OMAN PROCESS TECHNOLOGY & SYSTEMS (TPTS & PT-TPTS) PE (TPTS & PT-TPTS) (Chapter-3) Chapter - 3 Distillation Systems Textbook.
Steam traps Applications and Recommendations
Presentation transcript:

CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1

CMS CO 2 Cooling Plant Specs Closed Loop System cooled by three staged condensing units. Can provide kW of cooling depending on CO 2 temperature. Cooling Power: Carbon Dioxide Flow: Variable speed pumping to 2250 grams/sec. System contains 135kg of CO 2 and is rated to 84 bar. Numerous connection points for small or large scale CO 2 cooling experiments. Controlled by PLC through touch screen or network. Equipped with hazardous environment / CO 2 air level monitors and safety alarms. Status: In final installation and commissioning phase. CMS CO2 Cooling Test Stand2

CMS CO 2 System Simple Overview CMS CO2 Cooling Test Stand3

Installation / Commissioning Status Mechanical installation complete, except for some pipe insulation PLC and all instruments installed & commissioned 3 Condensing units now being charged with R404a CMS CO2 Cooling Test Stand4

Installation / Commissioning Status Cross Shaped Storage Vessel in place and insulated with 4” Trymer insulation. Storage Capacity is 625 Liters. 135kg 35C CMS CO2 Cooling Test Stand5

Installation / Commissioning Status PLC Logic complete and touch screen controller programmed All hardware (heaters, pump, chillers, valve, fan) are controlled by the PLC Must complete insulation fill system with CO 2 tune controls and test system under load. CMS CO2 Cooling Test Stand6

Pressure/Leak Testing Thread sealants rated to 10,000 psi fail at 1200 psi. – (Teflon tape and Pipe Dope compounds) System was completely leak tight at 300 psi. Raised pressure to 1320 for pressure test, (Passed) – Bubble test at 1200 psi showed every single NPT fitting leaked. Used 3M Scotch-Weld Structural Adhesive – 3M Pt#1838 Green All No Leaks except for all three of the largest fittings (1.25” NPT) Cleaned threads with alcohol, applied the adhesive to both male and female threads, retighten. 4 day high pressure leak test at 950 psi showed no leaks and no drop in pressure. CMS CO2 Cooling Test Stand7

Control System Interface – Main Overview Touch screen and remote control and monitoring CMS CO2 Cooling Test Stand8

Control System– Temperature Control Set Storage Tank CO2 Temperature CMS CO2 Cooling Test Stand9

Control System– Pump Control Set differential pressure across experiment CMS CO2 Cooling Test Stand10

FPIX Calculations and Characteristics of Single and Two Phase Flow Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand11

FPix Mass Flow at 3.8 bar DP CMS CO2 Cooling Test Stand12 RouteFlow (grams/sec) 1 OO OI II - IO OO OI II - IO OO OI II - IO6.605 Half Cylinder Total241.66

Pressure along routes of half disk Starting sub-cooled at 23.5 bar and -20C CMS CO2 Cooling Test Stand13

Temperatures along routes of half disk Starting sub-cooled at 23.5 bar and -20C CMS CO2 Cooling Test Stand14

Temperatures along routes of half disk Starting sub-cooled at 23.5 bar and -20C CMS CO2 Cooling Test Stand15

Temperatures along routes of half disk Starting sub-cooled at 23.5 bar and -20C CMS CO2 Cooling Test Stand16

Vapor Quality Exit Quality is roughly 1% Saturation doesn’t begin until partway into the half disk High flow rate still yields a high convection coefficient in single phase flow (~16 kW/m 2 *K) – Results in a maximum bulk CO 2 to tube wall temperature difference of 0.8C, 1.4C, 0.9C on Outer-Outer, Outer-Inner, and Inner tubes. (130% load) CMS CO2 Cooling Test Stand17

Preheating to Saturation Not recommended as a sole solution to achieve saturation, as it causes a sharp rise in fluid temperature, resulting in reduced performance. CMS CO2 Cooling Test Stand18

Sub-cooled boiling Wall boiling can occur before bulk fluid reaches saturation Two phase correlations for heat transfer shouldn’t be used at the ~1% quality which could be seen in FPix Second Putenkov equation gives most accurate results for these micro channel tubes with near single phase flow. CMS CO2 Cooling Test Stand19

Lowering Temperature Preheating to achieve saturation results in larger peak in temperature. Adding a needle valve before flow enters the cooling tubes will reduce the pressure and temperature. It will also raise the quality and decrease the flow rate. This would lower the temperature peak seen in the graph and move it to the left since we come closer to saturation by reducing pressure, not increasing temperature. Could be dialed in upon commissioning. For lowest temperature the lowest pressure difference from the detector outlet back to the storage tank is preferred. (NO OUTLET RESTRICTIONS) CMS CO2 Cooling Test Stand20

Needle Valve/Pre-Heater Optimization Attempting to calculate an optimal cooling scenario can only get us close to a possible solution. (Actual heat loads are not uniform and involve gravitational and momentum effects) The pressure reducing valve assures we can tune our cooling tubes to get the absolute maximum possible performance with our given inlet and outlet conditions. Can be combined with a pre-heater if needed. This will allow us to tune the system to run at any differential pressure, any differential temperature, any flow rate, and any quality possible with our given inlet and outlet conditions. CMS CO2 Cooling Test Stand21