NERC Footnote b / 12 – Load Loss

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

1 Project : Assess Transmission Future Needs - System Planning Performance Requirements: TPL Latest Developments from the ATFNSDT January.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
WECC Standards Committee Joint Session
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
WECC System Performance Criteria 1st Team Meeting Background
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Update on NERC Project Assess Transmission Future Needs – TPL-002, footnote b Chifong Thomas July 17-18, 2012.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Presented to PGDTF February 11, 2015
Goshen Area Bus Reconfiguration
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
THE ELECTRIC SUB STATION
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC 10/09/2003 KENNETH A. DONOHOO, P.E. Manager of System Planning Transmission Services
NERC Compliance Process Directive #2011-CAG-001 Directive Regarding Generator Transmission Leads Attachment 1 Typical Generator Transmission Leads One-Line.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
1 Distribution System Expansion Planning Using a GA-Based Algorithm Shiqiong Tong, Yiming Mao, Karen Miu Center for Electric Power Engineer Drexel University.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
1 Planning the CREZ 345 kV System for Multi-contingencies CREZ Technical Conference January 26, 2010 Bernie Pasternack AEP Service Corporation.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Utility Engineers, PC.  Generation  Transmission  Distribution.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Steady State Analysis Of A Microgrid Connected To A Power System
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
132KV GSS PIPAR CITY JODHPUR
Material for 10/23/2015 PGDTF Meeting Michael Juricek.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Introduction To Protective Relays This training is applicable to protective relaying and System Monitoring tasks associated with NERC Standards PRC-001.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Maryland Public Service Commission 2006 Summer Reliability Status Conference May 16, 2006 Baltimore, MD.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Freeport Area Master Plan Project -
NERC Lessons Learned Summary
Transmission Planning in ERCOT- Overview
Long-term Planning and TPL TP Workshop November 2, 2017
Reliability and Operations Subcommittee Report
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
NERC TPL Standard Overview
Project WECC-0100 Update Load Modeling Task Force
Review of Distribution Network Protection
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

NERC Footnote b / 12 – Load Loss Joe Seabrook Electric Transmission Contracts

TPL-002-0, footnote b and TPL-001-3, footnote 12 Non-Consequential Load Loss: Non-Interruptible Load loss that does not include: (1) Consequential Load Loss, (2) the response of voltage sensitive Load, or (3) Load that is disconnected from the System by end-user equipment. (Defined in TPL-001-3) Footnote b and 12 is about conditional requirements for some contingencies when Non-Consequential Load Loss might be allowed Footnote b and 12 with respect to some N-1 outages, and generator followed by N-1 outages Footnote 12 in TPL-001-3 is applied for the same contingencies in HV and EHV (above 300 kV)

TPL-001-3, footnote 12, Table 1 P1 – Loss of one of the following: Generator Transmission Circuit Transformer Shunt Device Single Pole of a DC line P2 – Opening of a line section w/o a fault P3 – Loss of generator, system adjustments, then loss of:

TPL-001-3, footnote 12, Table 1 Note that for P2, Non-Consequential Load Loss is not allowed for EHV for: A Bus Section Fault A non-Bus-tie Breaker Internal Breaker Fault But could allow Non-Consequential Load Loss for EHV for loss of: Generator Transmission Circuit Transformer Shunt Device Single Pole of a DC line Opening of a line section w/o a fault

TPL-001-3, footnote 12, text 12. An objective of the planning process should be to minimize the likelihood and magnitude of Non-Consequential Load Loss following Contingency events. However, in limited circumstances Non-Consequential Load Loss may be needed to ensure that BES performance requirements are met. When Non-Consequential Load Loss is utilized within the planning process to address BES performance requirements, such interruption is meets the conditions shown in Attachment 1. In no case can the planned Firm Demand interruption under footnote 12 exceed ‘x’ MW.

The Conditions shown in Attachment 1. Attachment 1 labeled “I. Stakeholder Process” Meetings for all affected stakeholders Requirements for notifications Procedures to involve stakeholders Dispute resolution for questioning and concerned stakeholders. Extensive reporting requirements Future plans to mitigate Firm Demand interruption Alternatives considered Regulatory approval required if EHV, or if ≥ 25 MW Regional Entity verification of no Adverse Reliability Impact is required.

Conclusion An alternative would be to leave customers on radial connections. ‘x’ MW is not defined in: “In no case can the planned Firm Demand interruption under footnote 12 exceed ‘x’ MW.” The SDT is expected to define ‘x’ MW