WECC System Performance Criteria 1st Team Meeting Background

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

SWAT Common Corridor Task Force Update November, 2008.
NERC Policies Introduction
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
Business Practices Subcommittee Update August 17, 2010.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC TRD/NERC TADS Webinar
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Report of the Operating Committee Don Watkins Operating Committee Chair April 28, 2009.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Standards Committee Joint Session
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
BAL-002-WECC-1 Contingency Reserves
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
NERC Footnote b / 12 – Load Loss
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
Week 2 The Object-Oriented Approach to Requirements
Randomized Algorithms Randomized Algorithms CS648 1.
ABC Technology Project
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
VOORBLAD.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
CUG Meeting June 3 – 5 Salt Lake City, UT
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
1 FL EDI R3 Test Requirements Rule 69L , F.A.C.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
1 Planning the CREZ 345 kV System for Multi-contingencies CREZ Technical Conference January 26, 2010 Bernie Pasternack AEP Service Corporation.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Planning Meeting November 4, 2010 Marv Landauer.
Presentation transcript:

WECC - 0071 System Performance Criteria 1st Team Meeting Background

1st Team Meeting Purpose What are we addressing? NERC Standard WRS1. New TPL-001 Process so far, how we got here….

1st Team Meeting Purpose The purpose of this request is to revise the current TPL – (001 thru 004) – WECC – 1 – CR - System Performance Criteria requirement WRS1.1 to permit the more efficient use of rights-of-way while promoting the use of separate tower instead of multi-circuit towers and maintaining an acceptable level of reliability for the Western Interconnection. The use of separate towers is preferred to multi-circuit towers.

1st Team Meeting

1st Team Meeting

1st Team Meeting Current Criteria within WECC: WRS1. In addition to NERC Table 1, PAs and TPs shall comply with the WECC Disturbance-Performance Table, Table W-1, of Allowable Effects on Other Systems contained in this section when planning the Western Interconnection. Table W-1 does not apply internal to a Transmission Operator area. WECC Table W-1 – Voltage & Frequency Dip

1st Team Meeting WRS1.1. The NERC Category C.5 initiating event of a non-three phase fault with normal clearing shall also apply to the common mode contingency of Two Adjacent Circuits on separate towers unless the event frequency is determined to be less than one in thirty years.

1st Team Meeting Definitions of: Common Corridor = Contiguous ROW or two parallel ROWs with Structure centerline separation less than the longest span of the two transmission circuits at the point of separation or 500 feet, whichever is greatest, between the two circuits. Adjacent Transmission Circuits = Transmission circuits within a Common Corridor with no other transmission circuits between them.

1st Team Meeting New TPL-001 P7: Multiple Contingency (Common Structure) The loss of: Any two adjacent (vertically or horizontally) circuits on common structure 11 Loss of a bipolar DC line SLG EHV, HV

1st Team Meeting Continued from previous slide… YES Interruption of Firm Transmission Service Allowed 4 YES Non-Consequential Load Loss Allowed

1st Team Meeting RS began process… Based on White Paper written by RS Process so far… Numerous discussions at RS throughout 2009 Presented to PCC & OC twice last year Lively discussion with feedback from one end to the other RS began process… Based on White Paper written by RS 2 supporting documents, SWAT & WIA

1st Team Meeting On February 26, 2010 the Standards Request Routing Committee (SRRC) met via telephone to discuss assignment of WECC-0071, System Performance Criteria.  The SRRC concluded the Request was in scope and assigned drafting to the PCC.  Ms. Cabbell, chair of the PCC, assigned the drafting task to the Reliability Subcommittee with augmentation to be sought by Mr. Watkins, chair of the OC, to include operators from the OC.  If additional team expertise is needed Ms. Cabbell and her assigned drafting team chair are authorized to augment the team members as needed.

1st Team Meeting Comments received during the 30 day comment period – abridged-

1st Team Meeting Armie Perez, ZGlobal In the evaluation of the loss of lines in a ROW, my recollection is that the probability of N-2 is not really that much greater for 2 lines on the same tower versus separate towers. This should be confirmed.

1st Team Meeting John Lucas, APS PCC should be assigned as the lead committee This is very timely and is urgently needed.

1st Team Meeting Bill Pascoe, TransWest, LLC The request, as drafted, focuses narrowly on a particular common corridor issue for Category C events. TWE believes that common corridor issues related to Category D events are also important to the appropriate balancing of reliability and environmental/land use impacts for major new transmission lines being planned in WECC. TWE requests that the drafting team be directed to also consider common corridor issues for Category D events.

1st Team Meeting Chuck Matthews, (Denise Koehn) BPA 1.  Although the primary purpose is revision of requirement WRS1.1, the purpose should be expanded to include the following, "In addition, other requirements in WECC-0071 may need to be revised based on other NERC Standards drafting efforts."  One reason for expanding this revision request is to provide more consistent terminology with the NERC Standards.

1st Team Meeting Chuck Matthews, BPA continued The "Proposed WRS1.1" in the section "Detailed Description" should be removed and the first paragraph in that section changed accordingly.  The proposal seems to presuppose the outcome of the revised criteria.

1st Team Meeting Darcy O’Connell, CAISO The California ISO supports Brian Keel's (SRP) suggestion on Revised TPL 1-4 project to remove restriction imposed by WECC under its requirement WRS1.1 to make it consistent with the NERC requirement.

1st Team Meeting Potential Benefits of changing Criterion: Potentially higher ratings on WRS1.1 limited Paths Higher values of remote generation Allow placing circuits within current definition without requirements Reduce environmental impacts, less ROW overall Consolidation of facilities, construction and maintenance Increased use of existing ROWs to a corridor

1st Team Meeting Author confession: Proposed WRS1.1: The NERC Category C.5 shall also apply to the common mode contingency of two Adjacent Transmission Circuits on separate towers unless the event frequency is determined to be less than one in 30 years. The fault to be used for this study shall be a single line-to-ground fault. The performance requirements of NERC Table 1 shall apply to this contingency and WECC Table W-1 shall not apply. Proposed to get started! Team develops best solution for all of WECC!!

1st Team Meeting

1st Team Meeting Timeline? How to get to conclusion? Proposal Subteam? Next Meetings?