Pervious Concrete Design Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney October 8, 2014.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

January 6. January 7 January 8 January 9 January 10.
Recycled Concrete Aggregates ET 493-FALL 2013 INSTRUCTOR: CRIS KOUTSOUGERAS ADVISOR: MOHAMED ZEIDAN BY: CHASE CHARRIER AND GARRETT TREGRE.
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Recycled Concrete Aggregates ET 494-SPRING 2014 INSTRUCTOR: CRIS KOUTSOUGERAS ADVISOR: MOHAMED ZEIDAN BY: CHASE CHARRIER AND GARRETT TREGRE.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.

“Properties of Concrete” Introduction
Recycled Concrete Aggregates
Done by: free Syria group Mohamed masry Mohamed abdulhamed Maayof kayed Hozayfa mohamed.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Chapter 4 Ordinary Concrete. §4.2 Ingredient of Ordinary Concrete Cement4.2.1 Cement Aggregate Water Concrete Admixture.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Recycled Concrete Aggregates ET 493 INSTRUCTOR: CRIS KOUTSOUGERAS ADVISOR: MOHAMED ZEIDAN BY: CHASE CHARRIER AND GARRETT TREGRE.
Pervious Concrete Desgin Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney December 5, 2014 ET 493.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Pervious Concrete Desgin Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney October 8, 2014.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Automatic Fire Fighting System Athan Jefferson Advisor Dr. Junkan Ma Instructor Dr. Cris Koutsougeras ET 493 Senior Design I.
August Intro to Course Syllabus Read Calendar Supplies 25 Read p Read p Read p
Pervious Concrete Desgin Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney December 5, 2014 ET 493.
PRESENTATION ON., STUDY ON BEHAVIOUR OF FIBER REINFORCED CONCRETE WITH GLASS FIBER USED AS ADMIXTURES.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Robotics June 1, 2005 Water March 30, 2005 Developing Countries November 30, 2004 ICT October 27, 2004 Service Industry [finance, telecom]
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
Recycled Concrete Aggregates
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
The Transformation of A Small Company Into A Golden Legend
February 2007 Note: Source:.
Rapid Setting Cement Based Mortars Using Nano Materials
January MON TUE WED THU FRI SAT SUN
MONTHS OF THE YEAR January February April March June May July August
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
Rapid Setting Cement Based Mortars Using Nano Materials
Habitat Changes and Fish Migration
Star Benchmark Percentile Ranking Name:
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
Presentation transcript:

Pervious Concrete Design Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney October 8, 2014

What is Pervious Concrete?  Pervious concrete is a special type of porous concrete that allows water from precipitation and other water sources to flow directly through the material. This reduces runoff and allows for the possibility for groundwater recharge.

Focal Point  The focus of this project is to find ways to lower the cost of pervious concrete using recycled concrete and improve the compressive strength.

Mixture  Pervious Concrete mixtures consist of rough large aggregate, sand, water, and air. Additives and recycled concrete will be added into the mixtures to create a porous, more cost effective concrete.  The admixtures that I will be using will be VMAR VSC-500 along with Darex AEA.

Mix Design  The mix design that I will be starting out with will be from Ascension Ready Mix Concrete Company.

Mix Additives  VMAR VSC-500 is a concrete mixture additive that enables the production of superior quality pervious concrete. I will be adding this with recycled concrete and testing the results of its compressive strength and permeability.

Mix Additives  Darex AEA is the next additive I will be using. This material increases the air entrainment to concrete.

Testing  All testing will be done through Ascension Ready Mix’s own testing lab at their facilities.

Supplies  All of the supplies I will be using will becoming from SELU or from Ascension Ready Mix.  Darex AEA  VMAR VSC-500  Sand  Fly Ash  Recycled Concrete  Pea Gravel (course aggregate)  Water

Timeline/Deliverables  Timeline/Deliverables:  September 2014: Research pervious concrete mix designs  October 2014: Secure testing lab to test cylinders along with materials needed  October 2014: Gather materials / Adjust mix design accordingly  November 2014: Design mixture and prepare trial mix  December 2014: Mix and pour 1 st set testing cylinders  January 2015: Conduct tests at Ascension Ready Mix lab  February 2015: Readjust mix design accordingly  March – April 2015: Perform cost analysis and prepare final report