Muons within Acceleration Acceptance Cuts at End of Transverse Cooling Channel TOWARDS A GLOBAL OPTIMIZATION OF THE MUON ACCELERATOR FRONT END H. K. Sayed,

Slides:



Advertisements
Similar presentations
IIT NFMCC Meeting ‘06 Recent Optimization Studies of Adiabatic Buncher and Phase Rotator A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL) C.Johnstone (FNAL),
Advertisements

1 Neutrino Factory Front End (IDS) -Chicane & Absorber David Neuffer C. Rogers, P. Snopok, C. Yoshikawa, … January 31, 2012.
Bunched-Beam Phase Rotation David Neuffer Fermilab.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
FODO-based Quadrupole Cooling Channel M. Berz, D. Errede, C. Johnstone, K. Makino, Dave Neuffer, Andy Van Ginneken.
1 Optimization of baseline front end for a neutrino factory David Neuffer FNAL (August 19, 2009)
1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.
Muon Colliders ‘ December 2004 Optimization of adiabatic buncher and phase rotator for Muon Accelerators A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL)
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
Taylor Models Workhop 20 December 2004 Exploring and optimizing Adiabatic Buncher and Phase Rotator for Neutrino Factory in COSY Infinity A.Poklonskiy.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
1 RAL + Front End Studies International Design Study David Neuffer FNAL (January 5, 2009)
1 Front End Studies and Plans David Neuffer FNAL (November 10, 2009)
1 Front End Studies and Plans David Neuffer FNAL (October 27, 2009)
1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.
Μ-Capture, Energy Rotation, Cooling and High-pressure Cavities David Neuffer Fermilab.
PID Detector Size & Acceptance Chris Rogers Analysis PC
Simulation Study Results Study: Replace LiH-based cooler with gas-filled transport and rf cavities Results: Beam Cooling is significantly improved. Final.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
Helical Cooling Channel Simulation with ICOOL and G4BL K. Yonehara Muon collider meeting, Miami Dec. 13, 2004 Slide 1.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
1 Front End Capture/Phase Rotation & Cooling Studies David Neuffer Cary Yoshikawa December 2008.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 Front End – present status David Neuffer March 31, 2015.
Ajit Kurup, C. Bontoiu, M. Aslaninejad, J. Pozimski, Imperial College London. A.Bogacz, V. S. Morozov, Y.R. Roblin Jefferson Laboratory K. B. Beard, Muons,
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer, Andreas Van Ginneken, Daniel Elvira Fermilab.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
1 The 325 MHz Solution David Neuffer Fermilab January 15, 2013.
1 Front End for MAP Neutrino Factory/Collider rf considerations David Neuffer May 29, 2014.
Harold G. Kirk Brookhaven National Laboratory Progress in Quad Ring Coolers Ring Cooler Workshop UCLA March 7-8, 2002.
S. Kahn 5 June 2003NuFact03 Tetra Cooling RingPage 1 Tetra Cooling Ring Steve Kahn For V. Balbekov, R. Fernow, S. Kahn, R. Raja, Z. Usubov.
1 Front End – present status David Neuffer March 17, 2015.
1 International Design Study Front End & Variations David Neuffer January 2009.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
FRONTEND DESIGN & OPTIMIZATION STUDIES HISHAM KAMAL SAYED BROOKHAVEN NATIONAL LABORATORY June 26, 2014 Collaboration: J. S. Berg - X. Ding - V.B. Graves.
1 Front End – present status David Neuffer March 3, 2015.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
2 July 2002Realistic Fields for a Ring Cooler Magnet System -- S.Kahn Page 1 Realistic Fields for a Ring Cooler Steve Kahn 2 July 2002 NuFact’02 Meeting.
Simulating the RFOFO Ring with Geant Amit Klier University of California, Riverside Muon Collaboration Meeting Riverside, January 2004.
Harold G. Kirk Brookhaven National Laboratory Quad/dipole Ring Coolers * Nufact’03 Columbia University June 6, 2003 * With contributions from A. Garren.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
Simulation of High-Power Mercury Jet Targets for Neutrino Factory and Muon Collider R. Samulyak, 1,2 H.C. Chen, 1 H.G. Kirk, 2 K.T. McDonald 3 1 Stony.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
1 Muon Capture for a Muon Collider David Neuffer July 2009.
1 Alternative options for beam cooling for a muon accelerator front-end Diktys Stratakis Physics Department Brookhaven National Laboratory Front-End Phone.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Adiabatic buncher and (  ) Rotator Exploration & Optimization David Neuffer(FNAL), Alexey Poklonskiy (FNAL, MSU, SPSU)
1 Front End – gas-filled cavities David Neuffer May 19, 2015.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
1 Front End – present status David Neuffer December 4, 2014.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
1 6D Cooling Chris Rogers, ASTeC-STFC Topical Workshop 23 Oct 2007.
+-- Collider Front end- Balbekov version
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
David Neuffer Cary Yoshikawa March 2009
Muon Front End Status Chris Rogers,
Design of the MANX experiment
Presentation transcript:

Muons within Acceleration Acceptance Cuts at End of Transverse Cooling Channel TOWARDS A GLOBAL OPTIMIZATION OF THE MUON ACCELERATOR FRONT END H. K. Sayed, *1 J.S. Berg, 1 H.G Kirk, 1 D. Stratakis, 1 K.T. McDonald, 2 D. Neuffer, 3 R. Ryne, 4 J. Qiang 4 1 Brookhaven National Laboratory, Upton, NY 2 Princeton University, Princeton, NJ 3 Fermilab, Batavia, IL 4 LBNL, Berkeley, CA * Work supported in part by US DOE Contract No. DE-AC02-98CH CONCEPT The baseline design for the Neutrino Factory/Muon Collider Front End consists of a five major components, namely the Target System, Decay Channel, Buncher, Phase Rotator, and the Ionization Cooling Channel. Although each of the mentioned systems has a complex design which is optimized for the best performance with its own set of local objectives, the integration of all of them into one system requires a global optimization to insure the effectiveness of the local objectives and overall performance. This global optimization represents a highly constrained multi-objective optimization problem. The figures of merit are the number of muons captured into a stable bunches and their transverse and longitudinal emittances. These objectives are constrained by the momentum and dynamic acceptance of the subsequent acceleration systems, in addition to the overall cost. A multi-objective global evolutionary algorithm is employed to address such a challenge. In this study a statement of optimization strategy is discussed along with preliminary results of the optimization. Decay Solenoid Channel Optimization  Optimize coil design (reduce losses due to momentum stop bands)  Tracking Based Transmission: Constant 1.5 Solenoid Field %67 IDS120L20to1.5T7m %66 Parameters to be optimized:  Target: capture solenoid field, and subsequent “taper”  Decay Channel: length, constant solenoid field  Buncher & Phase Rotator: RF phase, frequency, gradient  Transverse match into Cooler  Cooling Channel: RF phase, frequency, gradient, and solenoid focusing Broadband Match to Ionization Cooling Channel Matching B = 2.5 T Front End to +/- 2.8 T baseline Cooler 7%  Objective  N muons within accelerator acceptance cuts  Decay Channel length  Buncher, Rotator RF frequency & gradients  Converged after 200 ICOOL calls (12 generations). O PTIMIZING D ECAY C HANNEL - B UNCHER – P HASE R OTATOR “D IFFERENTIAL EVOLUTION ” T ARGET T APERED -S OLENOID P ROFILE Muon Target Short Taper Magnet Taper length = 7 m- B = T Muon beam momentum distribution at the end of the phase rotator. Optimized performance of the Front End versus the constant focusing field on the Decay Channel, Buncher, and Phase Rotator. The optimization included : target -olenoid taper length, Decay Channel length, phasing the Buncher and Rotator RF cavities, and the broadband match to the Ionization Cooling Channel. SUMMARY AND FUTURE WORK  Global optimization strategy for the muon Front End envisioned for Neutrino Factory (or Muon Collider)  The first round of the multivariable optimization showed a significant improvement of the performance by  15% - 60% from the current baseline.  A future work may include the higher harmonic RF in the Buncher and Phase rotator, Ionization Cooling Channel parameters (focusing field, RF phase and RF gradient, absorber parameters). A set of 9 solenoid coils match the beam’s phase space ellipse to fit within the acceptance of the Cooling Channel. The objective of this optimization problem was constructed as a sum of the emittance magnification factor at various momenta weighted to the number of muons within the vicinity of a central momentum  Objective function F= χ 1 EM1 + χ 2 EM2 + ….. + 1/Nmuon (end of cooling) χ 1  Number of particles with momentum Pz1 χ 2  Number of particles with momentum Pz2  Use optimizer to minimize the objective function “fit (match) the two ellipses”  Multivariable problem:9 parameters for 9 Coils. TUPBA11 NAPAC’13