S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Government Services How to Respond to a Request for Proposal (RFP) 2006.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Marcy Mealy Procurement Specialist CDBG Program
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2014.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Development and Quality Plans
Performance of Contractor Agreements: Practical Issues Kyiv, September 2012 Kristina ARTEMENKO EU Project "Harmonisation of Competition and Public Procurement.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
For Real Estate Agents Farming Equipment Heavy Equipment Real Estate Motor Vehicles.
TENDERING PROCEDURE IT- 3927/EN
Lahore Waste Management Company City District Government Lahore Progress for Outsourcing of Solid Waste Management Functions in Six Cities of Punjab.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
TYPES OF CONTRACTS.
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2013.
1 Briefing Session on Application for Fee Revision for the 2013/14 School Year by DSS Schools Submission of budget and financial information MA Section.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Construction Contracts
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Project Schedules The Cabinets New Categories of Scheduling.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
CONVEYOR IDLERS CORP 3340 Financial Requirements Presented by: Commercial Finance Date: Thurs 22 October 2015.
DIPLOMA IN CONSTRUCTION AND THE BUILT ENVIRONMENT.
The Provision of Facilities Management Services to Eskom Real Estate (ERE) Corporate & Zone office buildings in Gauteng Clarification Meeting on 26 February.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
CORP 2987: Vehicle Accessories Financial Requirements Presented by: Commercial Finance.
MEDUPI Catering PS(M)(R)2012 / AB /01: Financial Requirements Presented by: Commercial Finance Date: Thurs 11 Sept 2014.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Setting Up a New Recharge Center
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Content of Tender Dossier Instructions to Tenderers
Administration of a FIDIC Contract - Financial Management
Evaluation Grids Evaluation Grids.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Engineering Project Tendering.
Presentation transcript:

S10 CONS5Q25 Lara Tookey

Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender

Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender

Submitting a Tender  Remember, you have been invited by the client to make an offer.  The client will have set out the requirements they would like you to follow.  A client does not normally accept an offer that does not meet their requirements.

 Procedures as set in tender documents must be followed meticulously to avoid the tender being disqualified:  Form of tender to be signed by an authorised person  Bond details  Confirmation to keep information confidential  Basic requirements to be met when submitting alternative proposals

 Tender must be submitted on or before the time and date stipulated in the invitation to tender.  Public sector does not accept late tenders under any circumstances.

Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender

What would you expect to be included in your cover letter [MC submitting tender to Client]  Take 10 minutes and identify the various elements that you would expect to be included as a minimum in the tender cover letter.  Create a ‘mock’ letter with key words in the appropriate place.  You will be asked to provide feedback to the class.

Starting Point  Always date your letter.  Always address it to the client.  Tell them what it is your are offering – FIRST.  We hereby offer to carry out the work described below for the sum of $1,350, (One million, three hundred & fifty thousand, four hundred & sixty eight dollars.)

 We thank you for the opportunity to tender for the proposed xxxxx We have pleasure in submitting our quotation for your consideration.

 This submission has been completed in accordance with the invitation to tender, dated Specification reference No and drawing No’s as received in the enquiry received from your Consulting Engineer.

 The offer is for the sum of $ (amount in words) Inclusive in the specified total of $ are all provisional and contingency sums included in your specification, but exclusive of GST.

 Apply the rules specific to the type of offer  Firm price or open to Fluctuation?  If Fluctuation  This tender is firm and not subject to adjustment until 30 November 2013, or  This tender is submitted on the basis of Fluctuation in accordance with the current formula……. (or other applicable).

 This offer assumes that all the facilities and information would be made available to enable the work to be carried out in two continuous phases per house, i.e days for the first fixing and days for the final fixing and testing. The work to be in accordance with a negotiated installation programme, with an agreed completion date not subject to any delays beyond our control.

 As such, this offer is of a fixed price for 12 months from the date of this tender and will remain open for acceptance for a period of not exceeding twenty-eight days.

 Are you prepared to negotiate this offer?  E.g. We would be prepared to negotiate a firm price.  Limit your legal liability.  ‘Reasonable’ period vs. stated time period.  E.g. This tender remains open for acceptance for 14 (fourteen) days after this date.

 Our offer has been compiled on the basis, that the contract will be awarded as a whole. Should any item in our itemised summary of this tender, (other than the provisional or contingency sums), be deducted before acceptance of the offer, the remaining prices may need to be adjusted. Such price changes being subject to negotiation.

Kept separate from the cover letter  Special conditions:  The installation shall be carried out in accordance with the latest edition of ……, all relevant Codes of Practice, and those working practices set by …. Should any changes be made to this agreement we reserve the right to submit a cost variation for any resultant expenses we incur as a result of these changes.

 Special conditions:  This tender is based on a 38 hour, 5 day (Monday to Friday) working week. We have not allowed for any scheduled overtime and should this be required, we reserve the right to submit a variation for the costs so incurred.

 Completion time  The contract time will be 200 working days after issue of the building permit or access to the site, whichever is the later.  Clearly state any special days that you will or will not work –  E.g. this tender period does not allow for any trade picnic days, which would have to be added to our construction period etc.

 Detail what you are including or excluding from your tender.  Our tender is submitted in accordance with Specification number A745/93 and Drawing numbers A745/93 sheets 1 to 73 inclusive.

 Time to complete the project  We have submitted this tender on the condition that the work will commence on site by 30 th November Should work not commence for any reason beyond our control, we will charge $1000 per week until work commences.

 Economic Factors  Where the contract may include a large value of imported equipment.  E.g. This tender is based on the Australian Dollar at a minimum exchange rate of $US1=S$….  Should the Dollar fall below this level, then any additional costs incurred by the import of such equipment will result in a cost variation.

 Avoid disqualification:  Form of tender to be signed by an authorized person  Bond details  Confirmation of confidentiality clause  Basic requirement to be met when submitting alternative proposals.  Submission date & time strictly adhered to.

 Early notification of your decision would be helpful for our future load planning. If this electrical installation work is to be placed elsewhere, an indication of the accepted value of the contract would be most appreciated.

Where to from here…?  Receipt and Opening of Tenders  By the Client / Agent  4 th Sept – mock of the above, and tender analysis methods  Tender Evaluation and Recommendations Report  By the Client / Agent

Congratulations - You Won!!  Before you sign the contract document – you must:  Check contract documents & establish:  Are the drawings the same as those you tendered on?  Conditions relating to dates, penalties etc have not changed from original tender information.

Sorry, Try again…..  Once result of tender known, complete tender performance form.  Compare your tender price to accepted tender.  Assess your performance!  Inform SC.