Construction Contracts and Project Delivery Methods

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Contracting
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
NEC - Engineering and Construction Contract (ECC)
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
4/13/2017 1:54 PM.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Marcy Mealy Procurement Specialist CDBG Program
EPC & EPCM contracting.
CIVL202 Construction Engineering I
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
Construction Contracts
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
Demystifying Design-Build Virginia Association of Governmental Purchasing March 22, 2007 By: Thomas R. Folk Reed Smith LLP Phone:
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
TOPIC-9- PROJECT ORGANIZATION
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CONSTRUCTION CONTRACTS DOCUEMENTS
TYPES OF CONTRACTS.
1 1 T HE C ONSTRUCTION E NVIRONMENT Objective: Overview of the environment within which the planning and control of a construction project must proceed.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Measurement and Payment
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
1 Consent to Subcontract Breakout Session # D12 Name: Rita Wells Daniel Johnson Anthony Simmons Date:July 12, 2011 Time:11:15 – 12:30.
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
PROJECT DELIVERY METHODS
PROJECT MANAGEMENT 2 Chu Eu Ho
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Understanding Bonding Requirements
PROJECT DELIVERY METHODS
ARCH 435 PROJECT MANAGEMENT
Construction Contracts
Presentation transcript:

Construction Contracts and Project Delivery Methods

Objective Exposure to the different types of construction contracts, the number of contracts, the method of contractor selection and the basis for contractor payment.

Contract Defined An agreement between two or more parties representing a promise to be performed for consideration

Necessary Parts of a Typical Construction Contract Parties identified Parties make promises that constitute an offer Both parties sign the contract Both parties receive consideration: Contractor – payment for work done Owner – use of the completed project Parties of the contract must have the LEGAL AUTHORITY to negotiate a contract

Contractual Relationships Agreement between the OWNER and CONTRACTOR is the primary construction contract There are other contractual relationships which exist

Construction Agreement Forms Agreement – legal, binding, written document signed by owner & contractor Defines the relationships and obligations that exist By reference it incorporates ALL OTHER CONTRACT DOCUMENTS

Standard Forms AIA Document A101 EJCDC Document 1910-8-A-1

Advantages to Using Standard Agreement Forms—Disadvantages if Modified Forms Used Familiarity of the forms Legal precedents interpreting the documents Uniformity of terminology Disadvantages Modifications warrant care that all references are coordinated (change in one part of the form may require changes in several locations) Seek legal counsel

Conditions of the Contract Define basic rights, responsibilities, and relationships of the parties involved in the construction process in greater detail than the agreement

Design & Construction Parties Owner – may be an individual or an organization; initiates the project and secures funding for the design, construction and operation of the completed project Contractor – agrees to build the project; may enter into sub-contracts A/E – develops project designs and prepare construction documents; consultants may include: structural, civil, mechanical, electrical, acoustical, & environmental engineers and landscape architects, interior designers, and hardware specialists

Methods of Contractor Selection Competitive Bidding Direct Selection

Competitive Bidding Objective is to ensure that the cost of the project is reasonable and consistent with existing conditions in industry Publicly funded projects – owner required to select lowest bidder Private projects – owner may also consider the bidders’ qualifications, experience, financial condition, and performance history

Direct Selection Owner, with advice from the A/E selects contractor – total price and method of payment is then negotiated This method is generally NOT allowed for public projects

3 Decisions Made in Determining Kind of Contract Number of contracts Contract type Basis of payment

Number of Contracts Single Prime Contract – most common, uses competitive bidding (pg 3.12; fig 3.3-C) owner has contract w/ A/E & contractor; but A/E & contractor do NOT have contract Multiple Prime Contract – Owner divides the work among several contractors & has separate contract w/ each of them. (pg 3.13; fig 3.3-D) [e.g. paving, site work, foundations, landscaping, painting] Often used in FAST TRACK projects when construction on parts of the project is started prior to all of the design elements of the project being completed

Project Delivery Method Design-Bid-Build Design-Negotiate-Build Construction Management Design-Build Owner-Build Construction Subcontracts Total Project Commissioning

Design-Bid-Build Traditional method of project delivery Typically uses competitive bidding Considerations Project funding Owner’s capacity Cost Extent of work Time priorities See Figure 3.4-A on page 3.16

Design-Negotiate-Build Similar to the Design-Bid-Build contract but only ONE contractor involved in developing costs and negotiating a contract to construct the project Primary considerations are construction excellence and time (project costs not subject to competitive bidding process) See figure 3.4-B on page 3.19

Construction Management May have either single or multiple prime contracts Construction manager is employed by the owner to oversee and administer the project (may or may not actually perform any of the construction work) See pg 3.24; figs. 3.4-C & 3.4-D

Project Management Similar to construction management but also includes coordination of the design & planning stages of the project Large projects overseas have been successful using this Projects involving multiple structures & extensive site improvements often require this type of supervision; complex projects such as industrial & process engineering plants use this type of contract

Design-Build Owner contracts w/ a single entity to design as well as build the project Turnkey – an extended design-build contract in which the selection, procurement, and installation of all furnishings, furniture, and equipment is also included See pg 3.30; fig 3.4-E

Owner-Build This type of contract is usually seen with large-scale developers Only construction contracts needed are between the owner and various subcontractors See pg 3.34; fig. 3.4-F

Construction Subcontracts Usually involves a contract between the contractor and subcontractors and material suppliers May be verbal…best if written

Total Project Commissioning Defined by ASHRAE as a method to improve the delivery of a process. Focus is on QUALITY Makes sure that all components of a building are planned, installed, and maintained according to an owner’s requirements

3 Types of Basis of Payment Stipulated (Lump) Sum Unit Price Cost-Plus Fee

Stipulated Sum Simplest method used States that the contract requirements will be completed for a given amount of money

Unit Price Used when the extent of work or actual quantities can not be determined when bids are made (earthwork is such an example) Many civil engineering projects use unit price type of payment With unit price, the owner pays for exactly what is documented as done after the work has been completed

Cost-Plus Fee Contractor paid for actual cost of labor PLUS a fee for overhead and profit Fee may be a percentage of the labor & material cost or a fixed amount Cost-Plus Fee agreements may also include incentives for early completion It is reasonable for the owner to require a guaranteed maximum price to ensure that the total project cost will not exceed a given amount