National Power Corporation Small Power Utilities Group POWER SUPPLY AGREEMENT.

Slides:



Advertisements
Similar presentations
SALIENT FEATURES OF ISLAMIC FINANCIAL LEASE
Advertisements

Presentation on the Agreement on Import Licensing Procedures By Shashank Priya, Director, Department of Commerce.
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
ISTISNA’.
Let’s Study Legal English Together!
Amendment 3/5 Workshop.
Best international practices – the ICC model contracts and changing circumstances.
CONTRACTS: Before You Sign a University Contract...
Ernette Leslie, UA Contracting Procurement & Contracting Services University Services Annex, 6 th Floor Tucson, AZ (520) or (520)
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
ICC Amicable Dispute Resolution Services Mediating Corporate Governance Disputes By Mélanie Meilhac.
Briefcase on Corporation Law Yihe Co Ltd v Warren Inc.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
THE CONCEPT OF IJARA Dr. Muhammad Zubair Usmani Sharia Advisor
1 FFY2015 EAP Annual Training August 12 & 13, 2014 St. Cloud Propane Legislation & EAP.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
PRACTICAL ASPECTS OF CUSTOMER OWNED GENERATION A DISCUSSION OF INTERCONNECTION POLICIES, METERING STRATEGIES AND BILLING CONSIDERATIONS IMUA ANNUAL CONFERENCE.
Performance of Contractor Agreements: Practical Issues Kyiv, September 2012 Kristina ARTEMENKO EU Project "Harmonisation of Competition and Public Procurement.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
AGENCY IN LIBYA OVERVIEW.  In1971, the Agency Law permitted the Libyan nationals to carry out activities of commercial agency  In 1975, the Libyan government.
SERVICE LEVEL AGREEMENTS Bob Goldberg 312/
Rights for for Dads A Non Emotional Outcome Based Approach To Collaborative Business.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Water and Wastewater Certification 1 Water & Wastewater Reference Manual.
PRINCIPLE RESPONSIBILITIES Reported: Nguyen Thi Ha Thanh Legal Department.
Contract Review.  1. The final step in the vendor contracting process should be getting the vendor’s standard written contract and signing the contract.
Customer Service Enforcement After AB 2987 John Risk Communications Support Group, Inc. (c) 2006 John Risk Communications Support Group, Inc. (c) 2006.
March 27,2007CSMS - Savannah Negotiating a Fair Contract for Software and Services John Lateulere.
Arnold Podgorsky Wright & Talisman PC February 3, 2011.
H11.pE-3.0 Welcome Master of Project Management / International project contracts - r 1.1 – slide 1 International project contracts E.S.C.T
Legal Document Preparation Class 6Slide 1 General Partnerships The general partnership has the following features: –Unlimited liability for all partners.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
LOGO The collective agreement. The labour contract.
Rocky Mountain Power Collection Agency Fees Docket No T08
Crucial Clauses in Complex Supply Agreements AIJA Half Year Conference 2015 – Antwerp Moritz Maurer.
The project finance termsheet Broad characteristics: 12 mln USD for expansion of power plant. Two year grace (construction) period, reimbursement over.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Overview Interconnection Federal Regulations –1978 PURPA Legislation –1992, 2005 & 2007 PURPA Legislation Changes –RUS Rules DG Policy State Regulations.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
WSSB Capacity Enhancement Workshops The Uganda Performance Contract & Purpose 2. Performance Key Elements 3. Water Board’s Rights & Obligations.
Session 5 Elements of Uganda Model Management Contract for Water.
1 Convention Center Authority Republican Policy Group Presentation March 23 rd 2015.
From GlobeCast Asia Broadcast Service contract:. From GlobeCast Asia Broadcast Service contract(Cont’d):
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
EEI Master Power Purchase & Sale Agreement Drafting Committee Optional Provisions to EEI Master Power Purchase & Sale Agreement remarks of Dickson C. Chin*
RPS Bidders Workshop May 11, RPS Bidders Workshop Guidance for Inputs to PPA May 11, 2007.
NATIONAL CREDIT BILL, Scope Escalating interest Incidental credit New definitions Extension of the “in writing” requirement Unlawful provisions.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
Introduced some basic knowledge of the contract First, what is the contract? Contract, also known as contract. China's definition of the contract, the.
Philippine Feed-In Tariff System Implementation 1.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Renewable Energy Act of 2008
Wholesale Electricity Spot Market (WESM)
Overview of Market Reforms and the WESM
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS PURCHASE OF ACCOUNTS RECEIVABLE (PAR)
Comparison of MRC and PERC Agreements Town of Hermon March 24, 2016 James N. Katsiaficas, Esq. ATTORNEYS & COUNSELORS AT LAW One Canal Plaza ▪ PO Box 426.
Mountain Regional Water Rules & Regulations Overview.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Article 4 [Obligations of Applicant] 4.1. As a sole and exclusive owner of the Application, Applicant warrants that.
NATIONAL CREDIT BILL, 2005.
EPA CONTRACT TEMPLATE Overview
INTERCONNECTION GUIDELINES
EPA SUBCONTRACT TEMPLATE Overview September 2017
Overview of the Electricity Regulation Bill
Overview of the Electricity Regulation Bill
SIMAD UNIVERSITY Keyd abdirahman salaad.
The WTO-Agreement on Import Licensing
Presentation transcript:

National Power Corporation Small Power Utilities Group POWER SUPPLY AGREEMENT

Small Power Utilities Group Power Supply Agreement Test our interest in participative discussion Story about: The KUBA Family The Consultant and the Driver

National Power Corporation 27 January 2009 Small Power Utilities Group Power Supply Agreement Between NPC-SPUGAnd Distribution Utilities

Small Power Utilities Group Power Supply Agreement PSA MEANS: Power Supply Agreement Para Sa Atin

Small Power Utilities Group Power Supply Agreement Why do we need to discuss and to sign PSA? Types of Agreement: Purchase Order Memorandum of Understanding Memorandum of Agreement Contract of Supply and/or Services

Small Power Utilities Group Power Supply Agreement Why do we need to discuss and to sign PSA? Source of Funds: SAGR Revenue – Opex = Loss = UCME 0.00 – Fixed Cost = Loss 0.00 – Variable cost = Loss Capex = Loss = UCME UCME > ERC Approved UCME Secure funds from the GAA, if possible If not, what will happen? PRIORITIZE OPERATIONS

Small Power Utilities Group Power Supply Agreement Why do we need to discuss and to sign PSA? SPUG has the mandate to provide power DUs should pay SPUG for the service Therefore, “No Revenue, No funds for Operation” Both Parties should do each responsibility

Small Power Utilities Group Power Supply Agreement Why do we need to discuss and to sign PSA? Signing the PSA is inevitable Energy forecasting Capacity allocation Funding requirements Legal considerations

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION ONE – SCOPE OF AGREEMENT SECTION TWO- TERM OF AGREEMENT SECTION THREE- SERVICE SPECIFICATIONS SECTION FOUR - CHARGES AND ADJUSTMENTS SECTION FIVE- DEFAULT SECTION SIX- TERMINATION SECTION SEVEN- INDEMNIFICATION SECTION EIGHT -MISCELLANEOUS PROVISIONS LIABILITIES FORCE MAJEURE SETTLEMENT OF DISPUTES: ARBITRATION COURT LITIGATION ATTORNEY’S FEES AND LITIGATION EXPENSES NOTICES VALIDITY AND BINDING EFFECT AMENDMENT ENTIRE AGREEMENT UNDERTAKING EFFECTIVITY Annex A-DEFINITION OF TERMS Annex B-CONTRACTED DEMAND AND ENERGY Annex C-CHARGES AND ADJUSTMENTS

Small Power Utilities Group Power Supply Agreement Signing the PSA is Inevitable

Small Power Utilities Group Power Supply Agreement Conclusion Let us join forces in order to have a better supply of electricity in your franchise areas

Small Power Utilities Group Power Supply Agreement Salamat Po

Small Power Utilities Group Power Supply Agreement The KUBA FamilyUV MHFR BGBGBG ALL are KUBA ? ? ?

Small Power Utilities Group Power Supply Agreement The Consultant and the Driver

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION ONE – SCOPE OF AGREEMENT SUPPLY Supply of electric power and energy between NPC – SPUG and Distribution Utilities

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION TWO - TERM OF AGREEMENT SECTION TWO - TERM OF AGREEMENT Cooperation period is ten (10) years from Effectivity Date and renewable by mutual consent of the parties. DU or NPC has an option to enter into a Power Supply Agreement with new power provider (NPP).

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION THREE - SERVICE SPECIFICATIONS SECTION THREE - SERVICE SPECIFICATIONS CONTRACT DEMAND AND CONTRACT ENERGY Allocation of Contract Demand and Contract Energy as set forth in Annex A. To increase the contracted volumes, notify at least two (2) years in advance to adjust capacity

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION THREE - SERVICE SPECIFICATIONS SERVICE RELIABILITY Supply shall be available continuously except for allowable interruption or reduction The parties shall have a period of three (3) years to improve their respective facilities, including ensuring the compliance of the CUSTOMER with the pertinent technical specifications and performance standards of the Distribution Code.

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION THREE - SERVICE SPECIFICATIONS APPLICATION FOR INCREASE IN DEMAND AND ENERGY Through an amendment in Contract Demand or Contract Energy for any particular year or years subject to the technical constraints of generating plants, transmission, substation, and other facilities and subject to such rates and to other terms and conditions as the parties may agree upon.

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION THREE - SERVICE SPECIFICATIONS ASSIGNABILITY NPC-SPUG shall assign, cede, transfer, allocate wholly or partly its rights and obligations under this agreement unilaterally to an NPP which will be selected by the NPC-SPUG/CUSTOMER to take over the former’s power generation function by reason of private sector participation. CUSTOMER shall not assign any of its rights and/or obligations under this Agreement without the prior written consent of NPC-SPUG, which consent shall not be unreasonable withheld, and subject to the terms and conditions imposed in this Agreement.

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION FOUR - CHARGES AND ADJUSTMENT SECTION FOUR - CHARGES AND ADJUSTMENT Billing and payment for energy delivered by NPC- SPUG Subsidized Approved Generation Rate (SAGR) Other adjustments and procedures as approved by the ERC and provided in Annex B on Charges and Adjustments.

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION FIVE - DEFAULT The occurrence of the following events: Breach or failure in the performance An assignment by either party Repeated breaches of this agreement Cessation by either party

Small Power Utilities Group Power Supply Agreement Table of Contents SECTION SIX - TERMINATION Default Initial Term Extended Term

Small Power Utilities Group Power Supply Agreement Annex B CHARGES AND ADJUSTMENTS TARIFF Basic Rate =P /kW-hr Capex/Fixed Cost =P /kW-hr Variable Cost =P /kW-hr Overdue Accounts = P /kW-hr GRAM = P /kW-hr ICERA = P /kW-hr

Small Power Utilities Group Power Supply Agreement Annex B PENALTIES If the CUSTOMER fails to meet the annual Contracted Energy, CUSTOMER shall still pay for the Full Fixed Cost component of the True Cost Generation Rate (TCGR) of the undelivered Contracted Energy; If the CUSTOMER offtakes is in excess to the Contracted Energy, CUSTOMER shall pay for the Full Variable Cost component of the True Cost Generation Rate (TCGR) of the incremental excess energy;

Small Power Utilities Group Power Supply Agreement Annex B PENALTIES If NPC-SPUG fails to meet the Contracted Energy, and the CUSTOMER secures an alternative supplier to meet the deficiency, NPC- SPUG shall pay for the electricity produced by the CUSTOMER equivalent to the true cost of generation of NPC-SPUG.

Small Power Utilities Group Power Supply Agreement Annex B CHANGES TO CHARGES AND ADJUSTMENTS The charges and adjustments may from time to time be reviewed and amended in accordance with prevailing laws, rules or regulations.