Catalyzing private finance The relevance of World Bank Guarantees at time of risk aversion.

Slides:



Advertisements
Similar presentations
Chapter 13 Learning Objectives
Advertisements

Multidimensional Risk Management
® 1 Rudiments of Credit Analysis May 18, 2001 Credit for Bluffers – Part I.
Международная финансовая корпорация Член Группы Всемирного банка Corporate Governance as Integral Part of Risk Assessment – The IFC Approach Yerevan May.
What is Needed to Scale up Private Sector Finance? Presented by: Peter du Pont, Ph.D., USAID Contractor, USAID LEAD Program Bangkok, Thailand Presented.
1 U.S. Agency For International Development Financing Water Using Partial Loan Guarantees Jacqueline E. Schafer Deputy Assistant Administrator Bureau for.
World Bank Guarantee Products: The Basics June 29-30, 2005.
1 Frontier Markets Fund Managers Orli Arav Senior Investment Advisor.
Africas Investment and Credit Insurer Mobilizing Aid for Trade: A Global Review 19 th – 21 st November 2007 Geneva Peter Jones Chief.
0 - 0.
Addition Facts
Who Profits from the Debt and Debt Crisis? Conference on Alternative Solutions to the Debt Crisis Brussels, Belgium March 7, 2014.
Chapter 5 Capital Structure
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
Commercial Bank Operations
1 Improving transparency in the insurance sector: progress made and outstanding challenges OECD-ASSAL Regional Expert Seminar Montevideo, September.
Swaps Definitions In a swap, two counterparties agree to a contractual arrangement where in they agree to exchange cash flows at periodic intervals.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
Copyright © 2009 South-Western Legal Studies in Business, a part of South-Western Cengage Learning. CHAPTER 19 Nationalizing, Expropriation, and Privatization.
An Introduction to ICSID Process Workshop on ISDS provisions in the EU's International Investment Agreements European Parliament Meg Kinnear ICSID.
1 Creating Opportunities with World Bank Guarantees Banking and Debt Management (BDM) World Bank Treasury January 7, 2010.
Sub-sovereign Credit Markets
1 Foreign Exchange Liquidity Facilities World Economic Forum - Financing for Development Workshop Tuesday, October 26, 2004 São Paulo, Brazil.
OMV Gas Move & more. Financing the Nabucco Gas Pipeline Project Brussels, November 9th, 2006 Reinhard Mitschek OMV Gas International GmbH Head of International.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
Chapter 10 The Bond Market. Copyright © 2009 Pearson Prentice Hall. All rights reserved Chapter Preview In this chapter, we focus on longer-term.
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
External Commercial Borrowings (ECB) and Trade Credits for Imports 1 Ashit Hegde.
11-1 Chapter 11 Overview – Part A  This chapter discusses types of loans, and the analysis and measurement of credit risk on individual loans. This is.
Interest Rate and Currency Swaps
Understanding Financial Management and Securities Markets
Copyright © 2009 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Financial Support Enabling U.S. Exporters to Increase Their Sales.
Overseas Private Investment Corporation: The U.S. Government’s Development Finance Institution Renewable Energy and Energy Efficiency Izmir, Istanbul,
Capital Markets and Resource Mobilization
What is the ADF Partial Risk Guarantee? Partial Risk Guarantees (PRGs), also known as political risk guarantees, cover private lenders and investors against.
DEBT, PRIVATIZATION & Commercialization of Essential Services These are intimately linked –  Debt creates the “need” and justification for privatization.
CHAPTER 8 BOND MARKETS. Copyright© 2003 John Wiley and Sons, Inc. Capital Markets Economic purpose -- brings together long- term (over 1 year) borrowers.
Managing MFI Political Risk: The Response and Potential of Political Risk Insurance OVERSEAS PRIVATE INVESTMENT CORPORATION Ruth Ann Nicastri, Director.
1 USAID Partial Credit Guarantees Supporting Private Investment in Infrastructure Finance John Wasielewski Director, Office of Development Credit, USAID.
1 USAID Credit Guarantees Effective Catalysts for Private Investment in Municipal Finance.
Understanding the different Bank Group Guarantee Instruments
The World Bank Group Instruments
The World Bank Group Instruments. The World Bank World Bank Group financing and risk mitigation instruments IBRD/IDA MIGAIFC IBRD Loan for middle income.
Possible Modalities of Government Support for Private Clean Energy Investments/Financing Government support could be in different forms depending on types.
Reforming the World Bank’s Operational Policy on Guarantees 1 January 2012 – April 30, 2012.
MULTILATERAL INVESTMENT GUARANTEE AGENCY WORLD BANK GROUP 1 MIGA: Managing Risk in a Challenging Environment Pristina, Kosovo, May 2013.
INCA: CURRENT EXPERIENCE, INNOVATIONS AND OPPORTUNITIES IADF Conference, Washington DC 30 September 2004.
Policies in promoting private finance For Local Government Infrastructure Washington, 01 October 2004 Policies in promoting private finance For Local Government.
Inter-American Development Bank June 4, Inter-American Development Bank Private Sector Department Kevin Corrigan Head-Syndications Tel.:
Growing risk aversion in emerging markets and the need for risk mitigation Workshop on Tools for Risk Mitigation in Small-scale Clean Infrastructure Projects.
Modernizing World Bank Guarantee Products Guarantee Policy Modernization Spring Meetings Consultation 2012 Operational Policies and Quality (OPCCS) 1.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
Doing Business With OPIC. OPIC’s Mission Statement “To mobilize and facilitate the participation of the United States capital and skills in the economic.
Collateralized Debt Obligations Fabozzi -- Chapter 15.
Public Private Partnerships (PPPs) and The World Bank
The World Bank Guarantee Program “ Partial Credit Guarantees ”
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
Financial Support Enabling U.S. Exporters To Increase Their Sales Our Products Make the Difference Minimize risk Level the playing field Supplement commercial.
World Bank Presidential Villa, Abuja-Nigeria Day 2, November 29, 2011 Nigeria Electric Power Transaction & Power Industry Reform Review Conference Nigeria.
Scope & limits of financial guarantees for development James Winpenny Wychwood Economic Consulting Ltd.
EBRD – Supporting SME business
Bonds, Loans & Sukuk Nigeria Briefing Day
What is a Debt instrument? Example: Bond Interest Rate
The Challenge of Public Private Partnerships (PPPs) and The World Bank
Scaling up Partial Risk Guarantees:
The U.S. International Development Finance Corporation (the “DFC”)
Presentation transcript:

Catalyzing private finance The relevance of World Bank Guarantees at time of risk aversion

2 After September 11, risk aversion in the market has increased… September 11, Argentina crisis, Enron bankruptcy have increased risk aversion Banks capital eroded Reduced availability of private PRI Strategic investors reconsider portfolio in emerging markets

3 A Partial Risk Guarantee can mitigate Government performance risk A Partial Risk Guarantee (PRG) will cover lenders in case of a default on a covered contractual obligation to a project company leading to a Debt Service Default Project Company Government Commercial Lenders Project Finance & Guarantees Implementation Agreement PPA Indemnity Agreement Guarantee Loan

4 A PRG can be effective when key risks include: Tariffs Regulatory framework Rights of way Licenses Expropriation Termination amounts Interference in arbitration process Rule of law…

5 Novel type of PRG: L/C Structure Letter of credit can be drawn if Government defaults Government commits to repay LC bank World Bank guarantees LC Bank Privatized entity Government payment obligations

6 PRGs can be used to enhance privatization response Use of a PRG can result in –More bidders (halo effect of the Bank) –Increased upfront investment commitments –Increased sale value for the privatization –Lower tariffs (more attractive financing terms) –Mobilizes both local and foreign investors

7 PRGs can be used for a series of smaller projects World Bank Intermediary ABZ Projects Governments Guarantee Framework Agreement/ Indemnity C Retail of partial risk guarantees Government obligations

8 PRGs can backstop municipal undertakings World Bank Intermediary ABZ Projects Municipality Indemnity agreement C Retail of partial risk guarantees Municipal obligations Clawback Government

9 Criteria for deployment of the PRG PRGs can be considered in the following situations: –Sectors in early stages of reform –Larger size/riskier operations –Operations highly dependent on support/undertakings of governments

10 The WB Partial Risk Guarantee does not usually increase contingent liabilities The host governments indemnity of the World Bank does not increase the governments liabilities when the government is already directly obligated to the private sector on the same liabilities., IMF. Involving the Private Sector in Forestalling and Resolving Financial Crises – Private Project Finance Flows to Developing Countries, IMF Board Paper SM/99/211, August 20, 1999, page 21.

11 Collaboration with MIGA: PRG MIGA CUP

12 Collaboration with IFC & ECA Azito power project in Cote dIvoire Senior Debt Amount Tenor (US$ millions) (years) IFC A IFC B PRG-Guaranteed CDC Club Subordinated Debt Fixed IFC 4 12 Fixed CDC Club 6 12 Convertible IFC 4 12 Convertible CDC 6 12 Total Debt 160

13 WB will guarantee debt service for specific periods Partial Credit Guarantee $150 million Average financing term for China without World Bank Guarantee Additional uncovered risk taken by commercial banks World Bank Guaranteed Total risk assumed by commercial banks $50 million Example: China Ertan Power Project

14 Policy Based Guarantee: Leveraging adjustment loans US $119m Banks max. exposure as of Apr 9, Interest Principal Payments Guaranteed at Issuance Example: Colombia Policy Based Guarantee FitchBBB+MoodysBaa1 S&PBBBNAIC2

15 07 US $100m Bond World Bank support for principal repayment at maturity Additional term provided by WB support Longest term available to Philippines at the time US Treasury % Similar structures have been used in the past for project-based partial credit guarantee in Lebanon, Jordan etc. Various PCG structures can be developed Example: –Borrower: National Power Corporation, Philippines –Terms: 15 year US$ 100 million bond maturing in July 2009

16 PCGs can help in the following situations… Government or parastatals access to capital markets Finance government share in Private Public Partnerships Bond issues by public intermediaries, or public utilities

17 Partial Guarantees help access private finance at improved terms Debt MaturityInterest Spread Colombia (P. Credit) Philippines (P. Credit) % 5% 2.5% 3% with Guarantee without Guarantee 5 Cote dIvoire (P. Risk) % 2.75% Uganda (P. Risk) % 8% 1 Bangladesh (P. Risk) 3% 2% 14

18 Mr. Suman Babbar Director, Project Finance & Guarantees Group Infrastructure Economics and Finance Department The World Bank 1818 H Street, NW Washington, DC (USA) Ph: +1 (202) Fax: +1 (202) For further information contact: