G050371-00-D Commissioning Report P Fritschel LSC meeting, LHO 15 Aug 2005.

Slides:



Advertisements
Similar presentations
Hiro Yamamoto LLO April 3, 2014 LIGO-G Core Optics related loss hierarchy of aLIGO Hiro Yamamoto LIGO/Caltech Introduction Loss related to geometry.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
8/13/2004 Stefan Ballmer, MIT / LIGO Hanford 1 Length and angular control loops in LIGO Stefan Ballmer Massachusetts Institute of Technology LIGO Hanford.
Spring LSC 2001 LIGO-G W E2 Amplitude Calibration of the Hanford Recombined 2km IFO Michael Landry, LIGO Hanford Observatory Luca Matone, Benoit.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LIGO-G W LIGO Scientific Collaboration Meeting – LLO March Summary of recent measurements of g factor changes induced by thermal loading.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
Power Stabilization of the 35W Reference System Frank Seifert, Patrick Kwee, Benno Willke, Karsten Danzmann Max-Planck-Institute for Gravitational Physics.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
Virgo Control Noise Reduction
LIGO and Advanced LIGO: Technical Issues Dave Ottaway (for LIGO Scientific Community) LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts.
1 LIGO-G D LIGO Commissioning PAC Meeting, 18 May 2005, LIGO Livingston Joe Giaime, LSU & LLO, for the entire commissioning team. PAC Meeting,
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
G R DC Readout for Advanced LIGO P Fritschel LSC meeting Hannover, 21 August 2003.
LIGO-G Z LIGO Commissioning Report LSC Meeting, Hanover August 19, 2003 Peter Fritschel, MIT.
Interferometer Control Matt Evans …talk mostly taken from…
Status of LIGO Aspen January, 2005 Nergis Mavalvala LIGO-G D Commissioning and detector improvements for S4.
LIGO-G W Commissioning and Performance of the LIGO Interferometers Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
Thermal Compensation: The GEO and LIGO experience and requirements for advanced detectors Gregory Harry LIGO/MIT On behalf of the LIGO Science Collaboration.
1 Environmental Coupling During S5 Robert Schofield (University of Oregon) I. PEM injection overview II.Acoustic/seismic coupling III.Seismic upconversion.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
G D LSC Changes in Preparation of High Power Operations Commissioning Meeting, May 5, 2003 Peter Fritschel, Daniel Sigg, Matt Evans.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
G D Commissioning and Run Plans LIGO NSF Review 9 November 2005, Caltech Peter Fritschel, LIGO MIT.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Modeling of the Effects of Beam Fluctuations from LIGO’s Input Optics Nafis Jamal Shivanand Sanichiro Yoshida Biplab Bhawal LSC Conference Aug ’05 LIGO-G Z.
TCS and IFO Properties Dave Ottaway For a lot of people !!!!!! LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of.
LIGO Laboratory1 Thermal Compensation in LIGO Phil Willems- Caltech Baton Rouge LSC Meeting, March 2007 LIGO-G Z.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Aligning Advanced Detectors L. Barsotti, M. Evans, P. Fritschel LIGO/MIT Understanding Detector Performance and Ground-Based Detector Designs LIGO-G
Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L.
LIGO-G W Prospects for the S5 Run Fred Raab, LIGO Hanford Observatory November 8, 2005.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
G D LIGO Commissioning Update LSC Meeting, March 16, 2004 Peter Fritschel.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
G I Enhanced LIGO Update Rana Adhikari July ’07 LSC Meeting.
Main Interferometer Subsystem
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Main Interferometer Subsystem
Next Generation Low Frequency Control Systems
Daniel Sigg, Commissioning Meeting, 11/11/16
Quantum noise reduction using squeezed states in LIGO
Aspen January, 2005 Nergis Mavalvala
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Reaching the Advanced LIGO Detector Design Sensitivity
First Lessons from the Advanced LIGO Integration Testing
ALS Noise Budget and Model Status Report
ALS HIFO-X Noise Budget and Model Status Report
Fred Raab, LIGO Hanford Observatory November 8, 2005
Commissioning Progress and Plans
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Commissioning the LIGO detectors
Thermal Compensation Installation at LHO
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Status of the LIGO Detectors
40m Laboratory Upgrade Progress Report
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

G D Commissioning Report P Fritschel LSC meeting, LHO 15 Aug 2005

G D2

3 Sensitivity improvements (L1)  Input laser power increase: 2 W (S4) to 6 W  Increased bandwidth of the alignment servos (WFS)  Laser replaced, input optics efficiency improved  TM electronics noise reduction  Coil drivers  Pointing control currents (bias modules)  60 Hz mitigation  Angular controls noise reduction  Better decoupling from DARM  Electronics noise improvements & better filtering  Auxiliary length DOF: MICH and PRC  Higher power detection port (improved shot noise)  Higher bandwidth laser frequency and power stabilization loops  Watching out for photodiode damage!

G D4 WFS servo bandwidth increase  System measures & controls mirror (core optic) pitch & yaw angles  Complication: each sensor is sensitive, in general, to multiple mirrors  In the past, destabilizing interactions were avoided by keeping the servo bandwidths very low (except for WFS 1)  Now: mixing of control signals is carefully tuned to decouple the WFS channels from each other: +  1 2A2B 34 +  +  ETMX ETMY ITMX ITMY RM WFS# Loop BW 3-4 Hz2 Hz 0.1 Hz  Biggest benefit: reduces the orthogonal phase signal at the anti- symmetric port (ASI), allowing higher power operation

G D5 Laser power: woes & triumphs  L1: laser replaced after S4 with a recently refurbished unit  Failed shortly after installation  Replaced with another refurbished unit (sent from LHO)  Optical efficiency from laser output to mode cleaner input significantly increased  Replaced pre-mode cleaner, optimized components, …  Close to 80% efficiency from laser to input to vacuum  Max input power now 8 Watts  H2: power amplifier still the original unit from Dec ’98  Replacement with refurbished unit is imminent  Lightwave Electronics acquired by JDS Uniphase several months ago  Has delayed the repair of our lasers: currently have no 10 W spares in-house

G D6 60 Hz mitigation on L1  Long-known problem: ~1 Hz SCR pulsing of end-station heater currents, picked up in DARM  Fix: new control boards that allow ON/OFF control (already done at LHO) S4 60 Hz peak later reduced by a factor of 2, by turning off a pipe heater in the Y end station; now 5x m-rms

G D7 Ongoing story of photodiode damage  Loss-of-lock: full beamsplitter power can be dumped out the AS port, in a ~10 msec width pulse  Mechanical shutter cuts off the beam, with a trigger delay of about 6 msec  PD damage due to  Too high trigger level  Shutter too slow (wrong type)  Damaged PDs can be noisy  Solution (in progress):  All shutters of proper type  Carefully set trigger level  Looking at cutting off PD bias voltage on lock-loss ~100 W 5 msec Red: replaced damaged PDs

G D8 L1 Noise Budget

G D9

10 H1: high ITM absorption  Post-S4: carried out a program of in-situ characterization of optics  Arm cavity g-factor m’ments: changes under thermal loading  Beam spot size changes  Absorption results:  ITMX: 35 mW/W, or about 20ppm on the HR surface  ITMY: 13.5 mW/W, or about 8ppm on the HR surface  S4: operated at 3 W input, with lots of TCS compensation  1.5 W of annulus TCS power on ITMX: maxed out on CO2 laser power  Post-S4: attempted to operate at higher input power, with more TCS  Bought & installed a higher power CO2 laser for ITMX Measure change in spot size as ITM cools down Sensitivity: 5-10 mW absorbed Heat up with IFO or TCS

G D11 Dealing with H1 absorption  Strategy: gave until mid-June to achieve 10 Mpc sensitivity with the absorptive ITMX  5-6 W into MC needed to achieve this  Hours long locks at 6 W achieved, but power levels not stable  No sensitivity improvement over S4  Mid-June: decided to replace ITMX  Spare had been fully characterized at Caltech (Liyuan Z, Garilynn) in the preceding months  Scattering, bulk & surface absorption, surface figure  Decided to also try in-situ drag wiping of ITMY  Vent took place on 29 June  Took a bit longer than expected (17hr) due to problems with static charge (vented too fast?), but otherwise successful  Approx. 4 weeks of pumping before gate valves were opened  Montana earthquake hit later on ‘opening day’, shifted alignment of 3 optics  Eventually successful freeing all 3 from the outside

G D12 And now?  IFO has been run at 4.5 W in MC: no annulus TCS needed, 7-8 Mpc sensitivity achieved  Beam size measurements repeated:  Forensics on the extracted ITM being carried out at Caltech  So far no abnormal absorption has been seen!  All in all, a very successful operation, thanks to:  Dave O, Rick S, Sam W, Keita K, Cheryl V, Gerardo M, Gari B, Liyuan Z, Helena A, Doug C, Betsy B, Gary T, John W, Kyle R ITMXITMY Before35 mW/W13.5 mW/W Now< 3 mW/W3 mW/W

G D13 Upconversion from stack motion Using HEPI, increase the suspension point motion at 1.5 Hz by a factor of 5 DARM noise increases by a factor of ~5 over a wide band Effect first seen at LHO*, & measured recently at LLO: *see Robert Schofield’s DetChar talk

G D14 Scattered light fringe wrapping BRT ITM ETM E sc ~ E 0  Data looks a lot like what you’d expect from scattered light  Don’t know where light is scattering off  Beam tube baffles were made for this purpose: 270 mm aperture  Not currently installed in the beam (laid down in beam tubes)  Considering the possibility of erecting ETM baffles, to begin with in one IFO

G D15 H2: progress since S4  Mpc inspiral range  Higher power  1.5 W  3 Watts  Higher bandwidth WFS servos  Also for the mode cleaner WFS  Low-noise crystal oscillator & RF distribution  Thermal compensation at higher power  Servos implemented for TCS powers  Annulus heating (200mW on ITMY) required to maximize optical gain  Code upgrade  LSC/ASC/DSC code now use double precision throughout  Done for all IFOs Note: The SRD curve (for the 4km), scaled properly for the 2km IFO, gives an inspiral range of 8.8 Mpc (vs. 14 Mpc for the 4k)

G D16 Now till S5  REFL port beam pointing stabilization  L1, H1: heating distortion in the Faraday causes the REFL port beam to drift with power  Slow servo to stabilize position on REFL table to be implemented in September  H2 laser replacement soon  Timing system upgrade: to be installed on H2  New acoustic enclosures for H1 and H2 REFL tables  Cut down on H1-H2 correlated noise  H2: test of floating the AS port detection table  Frequency noise reduction  Second detector at REFL port that (in principle) has a better SNR for frequency noise (more power, different modulation freq)  AS port dust covers for L1  Bias module fixes for LHO  Frequency multiplier for crystal oscillator, LHO

G D17 During S5  S5 will not be completely ‘hands-off’  Expect to take 1-2 week breaks (every few months?) to try improvements  For example:  Beam tube baffles  Power increase steps: new PMC, new laser  Propagate timing system upgrade

G D18