TB/HIV Workshop: DRC Group Work and Country Presentations.

Slides:



Advertisements
Similar presentations
TB-HIV POLICY in Indonesia
Advertisements

15 th Ordinary Meeting of the Regional Coordinating Mechanism, PANCAP Montego Bay, Jamaica, 9-10 September 2010 Progress Report Implementation of CRSF.
Washington D.C., USA, July 2012www.aids2012.org A National Program Manager’s Perspective on HIV/TB Integration Dr Owen Mugurungi Director – AIDS.
Systematic TB Screening: Philippine Experience The 9th Technical Advisory Group and National TB Program Mangers meeting for TB control in the Western Pacific.
Project Title. Project Title: to improve the care of people who are infected with both TB and HIV, through training and collaborative care initiatives.
Rapporteur: Dr. Massimo Ghidinelli Facilitator: Dr.Elvira Teodora Wi
Comprehensive M&E Systems
National TB/ Leprosy Programme Manager
Concept Note on HIV Mongolia Process and key components of Funding Request to Global Fund.
Accelerating TB/HIV activities in Zambia Alwyn Mwinga 2007 HIV Implementers Meeting 20 June 2007.
Tools for HIV/TB Integration and the Civil Society Experience Carol Nawina Nyirenda Executive Director Community Initiative for Tuberculosis, HIV/AIDS.
African Business Leaders on Health GBC Conference on TB, HIV-TB Co-infection & Global Fund Partnership Johannesburg, October 2010 Technical Assistance.
Collaborative TB/HIV activities in Ethiopia Implementation, monitoring and evaluation issues Yibeltal Assefa, MD, MSc NAP manager TB/HIV core group New.
Unit 9. Human resource development for TB infection control TB Infection Control Training for Managers at National and Subnational Level.
Challenge 4: Linking TB & HIV/AIDS Programs Kayt Erdahl, Project HOPE Rodrick Nalikungwi, Project HOPE Malawi December 18, 2008.
1 TB/HIV Project in the Philippines Yumiko Yanase.
Cross Border Animal Health Plan of Action – Kenya and Uganda Four Strategic areas 1. To improve prevention, management and control of cross border animal.
Downloaded from Accelerate scaling up of TB/HIV activities in Tanzania Dr. N.G.SIMKOKO WHO/NTLP - Tanzania.
Overview Burkina--- ART Population: 11 millions Prevalence: 6.6% (surveillance data) Estimate of 650,000 PLWHA 300 peoples with red cross 2000 people to.
Group Discussion Guyana, The Bahamas T & T, Jamaica Barbados, Haiti Suriname, Curacao.
Unit 10. Monitoring and evaluation
Elements and Applications of the NACS Approach Serigne Diene, Senior Nutrition and HIV Advisor (FANTA/FHI360) AIDS Turning the Tide Together.
6 th Biannual Joint HIV Sector Review Meeting Nov 11-13,2014 Ministry of Health and Social Welfare Mwanaisha Nyamkara, NTLP Werner Maokola, NACP Nov 11,
Missed opportunities to diagnose TB and HIV Co-infection in HIV workplace program Dr Fred Mugyenyi Asiimwe Medical Director, ALAFA.
Monitoring &Evaluation System in Health Program. Brief overview of NACP Reporting units and quality aspects Data sets Learning/ Analysis of the data sets.
Implementation of Collaborative TB/HIV Activities by ICAP: Success and Challenges Andrea Howard, M.D., M.S. 14 th Core Group Meeting of TB/HIV Working.
Scaling up HIV Paediatric care Harvard – PEPFAR Program Chalamilla Guerino
Implementing the revised TB/HIV indicators and data harmonisation at country level Christian Gunneberg MO WHO Planning workshop to accelerate the implementation.
Haileyesus Getahun Stop TB Department WHO Re-conceptualizing ICF and IPT: global progress to date 14 th Core Group Meeting of the TB/HIV Working Group,
Proposed Priority Actions By NSF Goals (before group work) By Rose Nalwadda 1 st February 2006.
TB/HIV Workshop: Session 9&10 Mozambique, Malawi and Lesotho.
Colleen Daniels Stop TB Department World Health Organisation TB, HIV and Drug Use The overview.
Integrating Mental Health and Psychosocial Interventions into World Bank Lending for Conflict Affected Populations: A Toolkit About the Toolkit: Provides.
Dr. Philippe Chiliade Technical Advisor, Clinical Care, FHI 12 August 2008 Family Health International Lessons learned and challenges in scaling up Pediatric.
MONITORING, EVALUATION AND RESEARCH Critical response gaps: lack of enough Monitoring and evaluation knowledge and skills lack of a databank to monitor.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Scale up TB/HIV activities in Asia Pacific 8-9Aug09 1 TB/HIV collaborative activities in Thailand Sriprapa Nateniyom, M.D. TB Bureau, Department of Disease.
Exploring financing options NATIONAL TB CONTROL OF VIETNAM.
TB infection control and prevention of XDR Group II.
Uganda, Tanzania & Kenya. Kenya (1) Priority Activity ChallengeInputs Required: external / internal Who will take the action? Declaring TB an emergency.
HIV TESTING AND EXPANSION OF ART FOR TB PATIENTS, BOTTLE NECKS CHALLENGES AND ENABLERS FOR SCALE UP IN KENYA DR. JOSEPH SITIENEI, OGW NTP MANAGER - KENYA.
Round 6 grant: role of the Alliance Ukraine Support for HIV and AIDS Prevention, Treatment and Care for Most Vulnerable Populations in Ukraine 12 th Stakeholders’
Intensified TB case finding and infection control in Tanzania – opportunities and challenges Denis Tindyebwa Technical Director EGPAF Tanzania.
Comprehensive M&E Systems: Identifying Resources to Support M&E Plans for National TB Programs Lisa V. Adams, MD E&E Regional Workshop Kiev, Ukraine May.
Third Joint Bi-Annual Review of the HIV Response in Tanzania October 2008 Assessment of Progress on Implementation of Milestones from the Second Joint.
Challenges of Intensified TB case finding among PLHIV : Kenyan experience Dr. J. Sitienei Ministry of Health Kenya.
MINISTRY OF HEALTH AND SOCIAL WELFARE RCHS & NACP COLLABORATION Maurice Hiza, FP Coordinator, MOHSW MNCH/HIV integration stakeholders’ Annual meeting Giraffe.
HHS/CDC Track 1.0 Transition in Rwanda Dr Ida Kankindi, Rwanda Ministry of Health Dr Felix Kayigamba, CDC-Rwanda August
11 Laboratory Quality Improvement for clinical HIV/AIDS Services in the Uniformed Forces Mwaibako, J, Shija, L; Haverkamp, G; van den Hombergh; Katebalila,
Firma A. Kisika 1, Duncun Ndimbo 1, Rhoda Kunzugala 2, Richard Mkinga 3, Nolasco Ngoloka 2,, DMOs& DCDOs Iringa 1, Kilolo 2 and Mbinga 3 District Councils.
TB infection control in the era of MDR and XDR TB Haileyesus Getahun Stop TB Department WHO/HQ.
Thailand experience in implementing collaborative HIV/TB activities Anupong Chitwarakorn, MD Ministry of Public Health, Thailand TB/HIV Satellite symposium.
TB/HIV surveillance : Who is going to get the job done?
World Health Organization
Resource mobilization: What about Global Fund? PEPFAR?
Data Collection/Cleaning/Quality Processes MISAU Experience in Mozambique September 2017.
Progress in Implementation of TB/HIV Collaborative activities
WHO global policy development process for TB/HIV
Enablers for nationwide expansion of collaborative TB/HIV activities
Screening and diagnosing TB in PLHIV: Challenges and ways forward
Integrating TB and HIV care services – Malawi Experiences
monitoring & evaluation THD Unit, Stop TB department WHO Geneva
Introduction to poster session and discussion
The ProTEST Projects:Achievements so far
South Africa: From ProTest to Nationwide Implementation
From ProTEST to Nationwide Implementation
Current status – (1) Achievements Building strong political commitment
Comprehensive M&E Systems
PRIORITY AREAS FOR TB/HIV
Caribbean Workshop on the WHO/UNICEF Global Strategy for Infant Young Child Feeding and the New WHO Child Growth Standards October 13-14, 2005 Martinique.
Presentation transcript:

TB/HIV Workshop: DRC Group Work and Country Presentations

Not yet established nationally, only for Union IHC project, USAID/WHO Is needed to be formalized to give it more status and impact 1stQ 2008 with consultant already programmed to come, institutional assistance MAP in country already wants to integrate TB/HIV already. M&E to be adjusted 1.1 Coordinating mechanism

1.2 Conduct surveillance HIV in TB (NTLP) First base-line in Kinshasa, Belgium Gvt, pilot in Conflicting data from other sources. PICT is not well established countrywide, needing a prevalence survey/sentinel surveillance ANC is well established Action: Agree on protocol (sites, sample, methodology) and funding MAP? Needs reprogramming, indicator exists Utilize funds faster and request more. Explore with TTL WB.

1.3 Planning New strategic plan for HIV/AIDS needed Action: TA required for revision of 5 year strategic plan for HIV/AIDS, and advise on inclusion of TB/HIV, MAP 2 years and GF7 already won (WB, The Union promised, Belgium Government). U$: WB (MAP) working in zones and funded, GF (2 rounds)

1.4 M&E Joint supervision TB/HIV in IHC and other funding Joint revision of data collection tools completed, but not yet widely implemented because of lack of printing and distribution Satellite internet connections in all zones Action: Funds for printing and distribution Training of Health workers Present to donors (WB, GF)

2.1 ICF Not yet established in technical policy NACP; methodology, guidelines, training and M&E Problems of access to good diagnosis when TB suspect is identified: knowledge and skills and equipment (Xray, AFB etc.) Action needed: Intermediate measures for improving diagnosis particularly in (referral) hospitals: train, equipment Training of HCWs in TB diagnosis in HIV/AIDS care settings Training of HCW in HIV/AIDS settings (VCT, PMTCT, HAART centers) in identification of TB suspects (all forms) based on symptoms Same for community-based programs Same for organizations of PLHIV

2.2 IPT Not yet included in technical policy Fear for mono-therapy,exclusion of active TB Action Organize a meeting in DRC on IPT Protocol Development of policy and technical policy together between NTLP/NACP Pilot project in a few sites Adherence support Evaluation

2.3 Infection Control Already in TB/HIV policy Not integrated in general MOH IC policy, which is also not well functioning in MOH Simple measures: Isolation, Cough hygiene, Not on MDR/XDR with isolation wards Special need for prisons in transmission prevention TB screening and RX available (NTLP) Action Revision of national policy for TB-IC and in prisons Integration in general IC Dissimenation and training in health facilities and congregate settings Refurbishment of health facilities

3.1 Provide HIV testing and counselling Scaling up is the issue of IHC pilot projects Action Scaling-up

3.2 Introduce HIV prevention methods

3.3 Introduce cotrimoxazole preventive therapy Scaling-up needed of IHC pilots

3.4 HIV/AIDS care and support Done by Community-based organization Is not very strong No psychological support Nutritional support needed Action: TA for revision of psychological care and support for PLHIV Capacity building

3.5 ART scale-up Scale-up needed

What can be done in the next 6 months and what is required in DRC? Priority ActivityChallengeInputs Required: external / internal Who will take the action? 1. Formalize a national coordination committee Current modality of coordination too informal TA for institutional capacity building, TOR, membership NACP NTLP 2. Organize HIV/TB surveillance and base-line survey Fragmented information, not standardized TA for Protocol formulation Person time Resource mobilization NACP/NTLP TTL-WB Other donors 3. Formulation of new 5-year strategic HIV/AIDS Plan, including TB/HIV co- infection MAP funding only 2 years TA for strategic planning and implementation plan development Resource mobilization NACP NTLP 4. Finalize, print, disseminate and train staff on new M&E tools in NACP and NTLP Lack of fundingAdvocacy and resource mobilization NACP/NTLP

What can be done in the next 6 months and what is required in DRC? Priority ActivityChallengeInputs Required: external / internal Who will take the action? 5. Revise guidelines for VCT, PMTCT, ART, on TB- ICF ICF not included in current guidelines TA for revision and reformulation of policy, technical guidelines, training tools, and M&E on ICF NACP NTLP 6. Strengthen diagnostic capacity for all forms of TB (training, infra- structure) TB diagnosis inadequate Funds for infrastructure improvement, training, equipment NTLP NACP 7. Organize a national consultation on IPT with stakeholders IPT not included in technical policy TA for facilitating a consultation meeting on IPT Proposal of pilot project NACP TB CAP 8. Revise national TB-IC policy, formulate, disseminate, training, rehabilitation for national scale-up TB-IC not up-to- date TA for actualisation process Resource mobilization NTLP NACP MOH/4th Directorate 9. TA for revision of psycho-social care and support for PLHIV and capacity building Inadequate capacity Current guideline not up-to-date TA for revision of guidelines and training program and capacity building NACP