CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)

Slides:



Advertisements
Similar presentations
ALIGNMENT TESTS Review of CLIC Two Beam Module lab program 06/11/2013 On behalf of CLIC pre-alignment team.
Advertisements

MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege,
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
LCWS12, 25/10/ CLIC two-beam module development Status and future plans G. Riddone Outlook Short introduction CLIC Module Validation program Future.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
H. SCHMICKLER Alignment challenges for a future linear collider.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
CLEX constraints between the 2 linacs CLIC meeting 18 March 2015 Vivien RUDE Contents : (Alignment in the CLEX) Lab constraints CLEX constraints.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Installation of the waveguides between MB T0#2 and DB T0#2
CLIC Parameter Working Group Two Beam Module Design
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
SLAWG #15 ZS fiducialisation and alignment today
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
The path to a new CLIC main-linac module
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
Alignment challenges for a future linear collider
Thermal test (lab modules)
Presentation transcript:

CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad) LAB: New sensors support Universal fiducial support New configuration of sensors CLIC Project Meeting 09/06/2015 Hélène Mainaud Durand on behalf of the CLIC pre-alignment team

2

3 CLEX  Configuration of sensors & components

4 CLEX  Alignment of the DB side components

CLEX  Alignment of the MB side components 5 Linear-regression (AS1 and AS2) Z (vertical) X (longitudinal) Z (vertical) AS1 AS C C1

Beam OFF Beam ON (DB and MB) 6 CLEX  Impact of beam

7 CLEX  Long term stability (DB)

8 CLEX  Long term stability (MB)

9 CLEX  Long term stability (DB quad support) Radial (µm) Vertical (µm) DBQ1 C1-9-4 C2-319 DBQ2 C1811 C Offsets measured after 3 months

10 LAB  Configuration of sensors & components -Alignment sensors are installed on the cradle -Misalignment between the cradle & the girder  Fiducialisation lost In situ fiducialisation: Sensors support on the girder

11 LAB  New sensors support

12 LAB  New sensors support Best-fit In µmRMS Max Girder Max Support Max Cradle Stability measurements 01/06/ Measurements after warm up 02/06/ Measurements after warm up 04/06/ Measurements after 1 displacement of 800 microns 04/06/ Measurements after several displacements 04/06/ Measurements after loading 04/06/ Measurements after warm up + loads 08/06/

13 LAB  Universal fiducial 1 unique support of fiducials for different means of measurements  Identification of potential companies  Patenting study by a patent attorney

14 LAB  New configuration of sensors RasDif RasNik

15 Perspectives  CLEX Implementation & validation of the active pre-alignment algorithm Various studies with beam: WPS sensors readings w.r.t WFM, optimization of the position with beam  LAB: End of the study: cradle w.r.t. girder Re-installation of oWPS (replacing NIKHEF sensors) Validation & test of motorized DBQ supports Fiducialisation, alignment of the components of type 0 -2  TT1: Relative comparison between NIKHEF laser based alignment systems and WPS systems

Thank you very much for your attention Special thanks to: Mateusz Sosin Vivien Rude Mathieu Duquenne Marek Gutt Mostowy Juha Kemppinen Guillaume Stern Nikkie Deelen 16